Student or educator? Sign up with your school email and get 6 months of Pro free.
CoChat
Cited by 243

The DOI matches its Crossref record.

Project Management Process Maturity (PM)2 Model

Kwak, Young Hoon, Ibbs, C. William · 2002 · Journal of Management in Engineering
DOI 10.1061/(asce)0742-597x(2002)18:3(150

Abstract

This paper presents the project management process maturity (PM)2 model that determines and positions an organization’s relative project management level with other organizations. The comprehensive model follows a systematic approach to establish an organization’s current project management level. Each maturity level consists of major project management characteristics, factors, and processes. The model evolves from functionally driven organizational practices to project driven organization that incorporates continuous project learning. The (PM)2 model provides an orderly, disciplined process to achieve higher levels of project management maturity.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1061/(asce)0742-597x(2002)18:3(150)

Cites

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cited by

See all 243

Metadata

Authors
Kwak, Y. H., & Ibbs, C. W.
Venue
Journal of Management in Engineering
Published
2002-07
Volume
18
Issue
3
Pages
150-155
ISSN
  • 0742-597X (ISSN-L)
  • 1943-5479
DOI
10.1061/(asce)0742-597x(2002)18:3(150
OpenAlex
W2168277129
Cited by
243
References
0
FWCI
3.25
Type
journal article
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Project Management Process Maturity (PM)2 Model. https://app.cochat.ai/papers/10.1061/(asce)0742-597x(2002)18:3(150
The paper
Kwak, Y. H., & Ibbs, C. W. (2002). Project Management Process Maturity (PM)2 Model. Journal of Management in Engineering. https://doi.org/10.1061/(asce)0742-597x(2002)18%3A3(150

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.