The DOI matches its Crossref record; 32 of the 32 references it cites were found in a registry or an index.
Measuring BIM performance: Five metrics
Abstract
The term Building Information Modelling (BIM) refers to an expansive knowledge domain within the design, construction and operation (DCO) industry. The voluminous possibilities attributed to BIM represent an array of challenges that can be met through a systematic research and delivery framework spawning a set of performance assessment and improvement metrics. This article identifies five complementary components specifically developed to enable such assessment: (i) BIM capability stages representing transformational milestones along the implementation continuum; (ii) BIM maturity levels representing the quality, predictability and variability within BIM stages; (iii) BIM competencies representing incremental progressions towards and improvements within BIM stages; (iv) Organizational Scales representing the diversity of markets, disciplines and company sizes; and (v) Granularity Levels enabling highly targeted yet flexible performance analyses ranging from informal self-assessment to high-detail, formal organizational audits. This article explores these complementary components and positions them as a systematic method to understand BIM performance and to enable its assessment and improvement. A flowchart of the contents of this article is provided.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Perceived usefulness, perceived ease of use, and user acceptance of information technology
Davis, F. D. (1989) · MIS Quarterly · doi:10.2307/249008 · Cited by 68,483
A Theoretical Extension of the Technology Acceptance Model: Four Longitudinal Field Studies
Venkatesh, V., & Davis, F. D. (2000) · Management Science · doi:10.1287/mnsc.46.2.186.11926 · Cited by 23,066
(1996) · Cited by 11,584
Henderson, R. M., & Clark, K. B. (1990) · Administrative Science Quarterly · doi:10.2307/2393549 · Cited by 8,357
Quality Is Free: The Art of Making Quality Certain
Crosby, P. B. (1979) · Andalas University Repository (Andalas University) · Cited by 2,561
Succar, B. (2009) · Automation in Construction · doi:10.1016/j.autcon.2008.10.003 · Cited by 1,741
Self-citationEncyclopedia of Artificial Intelligence
(2009) · IGI Global eBooks · doi:10.4018/978-1-59904-849-9 · Cited by 1,396
Towards a System of Systems Concepts
Ackoff, R. L. (1971) · Management Science · doi:10.1287/mnsc.17.11.661 · Cited by 1,149
Lockamy, A., & McCormack, K. (2004) · Supply Chain Management: An International Journal · doi:10.1108/13598540410550019 · Cited by 561
Alternative research paradigms in operations
Meredith, J. R., Raturi, A., Amoako‐Gyampah, K., & Kaplan, B. (1989) · Journal of Operations Management · doi:10.1016/0272-6963(89)90033-8 · Cited by 548
Cited by
Miettinen, R., & Paavola, S. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.03.009 · Cited by 480
Macro-BIM adoption: Conceptual structures
Succar, B., & Kassem, M. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.04.018 · Cited by 399
Self-citationAn integrated approach to BIM competency assessment, acquisition and application
Succar, B., Sher, W., & Williams, A. (2013) · Automation in Construction · doi:10.1016/j.autcon.2013.05.016 · Cited by 292
Self-citation
Metadata
- Authors
- Succar, B., Sher, W., & Williams, A.
- Venue
- Architectural Engineering and Design Management
- Publisher
- Informa UK Limited
- Published
- 2012-05
- Volume
- 8
- Issue
- 2
- Pages
- 120-142
- ISSN
- 1745-2007 (ISSN-L)
- 1752-7589
- OpenAlex
- W2084631275
- Cited by
- 269
- References
- 32
- FWCI
- 22.60
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Measuring BIM performance: Five metrics. https://app.cochat.ai/papers/10.1080/17452007.2012.659506
- The paper
- Succar, B., Sher, W., & Williams, A. (2012). Measuring BIM performance: Five metrics. Architectural Engineering and Design Management. https://doi.org/10.1080/17452007.2012.659506
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.