Implementing Total Quality Management in Construction Firms
The DOI matches its Crossref record; 4 of the 4 references it cites were found in a registry or an index.
Abstract
As building projects get larger and more complex, clients are also increasingly demanding higher standards for their delivery. Total quality management (TQM) has been recognized as a successful management philosophy in the manufacturing and service industries. TQM can likewise be embraced in the construction industry to help raise quality and productivity. Two case studies of construction companies showed how TQM can be successfully implemented in the construction industry. The benefits experienced include reduction in quality costs, better employee job satisfaction because they do not need to attend to defects and client complaints, recognition by clients, work carried out correctly right from the start, subcontractors with proper quality management systems, and closer relationships with subcontractors and suppliers. TQM performance measures were also reflected through top management commitment, customer involvement and satisfaction, employee involvement and empowerment, customer–supplier relationships, and process improvement and management. Finally, a framework for implementing TQM in construction is recommended.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Critical factors and performance measures of TQM
Motwani, J. G. (2001) · The TQM Journal · doi:10.1108/13683040010362300 · Cited by 222
Total quality management: practice and outcomes in the largest US firms
Albers Mohrman, S., Tenkasi, R. V., Lawler, E. E., & Ledford, G. E. (1995) · Employee Relations · doi:10.1108/01425459510086866 · Cited by 201
Love, P. E. D., Li, H., Irani, Z., & Holt, G. D. (2000) · The TQM Journal · doi:10.1108/09544780010318361 · Cited by 59 · cited 1×
“…which are facet TQM, also imply that a change in behavior and culture is requir if construction firms are to become learning organizations~Love et al. 2000!. Idris et al. ~1996! showed that the electrical and electroni engineering industry in Malaysia has widely adopted TQM an the main…”
BackgroundTotal Quality Management for Construction
Rounds, J. L., & Chi, N. (1985) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1985)111:2(117 · Cited by 39
Cited by
Marin-Garcia, J. A., & Bonavia, T. (2015) · International Journal of Production Research · doi:10.1080/00207543.2014.975852 · Cited by 133
Metadata
- Authors
- Pheng, L. S., & Teo, J. A.
- Venue
- Journal of Management in Engineering
- Published
- 2004-01
- Volume
- 20
- Issue
- 1
- Pages
- 8-15
- ISSN
- 0742-597X (ISSN-L)
- 1943-5479
- DOI
- 10.1061/(asce)0742-597x(2004)20:1(8
- OpenAlex
- W2077363806
- Cited by
- 206
- References
- 4
- FWCI
- 1.93
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Implementing Total Quality Management in Construction Firms. https://app.cochat.ai/papers/10.1061/(asce)0742-597x(2004)20:1(8
- The paper
- Pheng, L. S., & Teo, J. A. (2004). Implementing Total Quality Management in Construction Firms. Journal of Management in Engineering. https://doi.org/10.1061/(asce)0742-597x(2004)20%3A1(8
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.