Lean Construction: From Theory to Implementation
The DOI matches its Crossref record; 28 of the 28 references it cites were found in a registry or an index.
Abstract
This article compares the techniques developed for lean construction with those developed for lean manufacturing. Lean manufacturing and lean construction techniques share many common elements despite the obvious differences in their assembly environments and processes. Manufacturing plants and construction sites are different in many ways that might explain why lean production theories and practices do not fully fit the construction industry. Though many lean construction tools and elements are still in an embryonic state, lean construction techniques are gaining popularity because they can affect the bottom line of projects. Additionally, this paper presents a study of a construction project in which specific lean construction elements were tested. Each technique was evaluated in terms of its impact on the performance of the project. Based on the findings of the study, a new “lean assessment tool” is proposed to quantify the results of lean implementations. The assessment tool evaluates six lean construction elements: last planner, increased visualization, huddle meetings, first-run studies, five S’s, and fail safe for quality. This paper provides a simple and comprehensive approach that is transferable to any construction project.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
The machine that changed the world
(1992) · Long Range Planning · doi:10.1016/0024-6301(92)90400-v · Cited by 5,805
The Machine That Changed the World
Wolf, B. M. (1991) · Journal of International Business Studies · doi:10.1057/jibs.1991.40 · Cited by 4,717
Agile Software Development with SCRUM
Schwaber, K., & Beedle, M. (2001) · Cited by 2,656
THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL
Ballard, H. G. (2000) · University of Birmingham Institutional Research Archive (University of Birmingham) · Cited by 2,057
The Nature and Dynamics of Organizational Capabilities
(2001) · doi:10.1093/0199248540.001.0001 · Cited by 1,534
Monden, Y. (1993) · Springer eBooks · doi:10.1007/978-1-4615-9714-8 · Cited by 1,303
Japanese Manufacturing Techniques: Nine Hidden Lessons in Simplicity
Mitchell, P. S., & Schonberger, R. J. (1983) · The Academy of Management Review · doi:10.2307/257841 · Cited by 976
Toyota Production System: An Integrated Approach to Just-In-Time
Monden, Y. (1993) · Cited by 957
Toyota Production System: Beyond Large-Scale Production
Ohno, T., & Bodek, N. (2019) · Productivity Press eBooks · doi:10.4324/9780429273018 · Cited by 793
Toyota Production System: Practical Approach to Production Management
Monden, Y. (1983) · Cited by 612
Zero Quality Control: Source Inspection and the Poka-Yoke System
Shingo, S. (1986) · Cited by 574
Lean indicators and manufacturing strategies
Martínez Sánchez, A., & Pérez Pérez, M. (2001) · International Journal of Operations & Production Management · doi:10.1108/01443570110407436 · Cited by 397
“Lean” service: in defense of a production‐line approach
Bowen, D. E., & Youngdahl, W. E. (1998) · International Journal of Service Industry Management · doi:10.1108/09564239810223510 · Cited by 378
Lean manufacturing—tools, techniques, and how to use them
(2001) · Journal of Manufacturing Systems · doi:10.1016/s0278-6125(01)80022-4 · Cited by 330
A model for evaluating the degree of leanness of manufacturing firms
Soriano‐Meier, H., & Forrester, P. L. (2002) · Integrated Manufacturing Systems · doi:10.1108/09576060210415437 · Cited by 251
Lean production in a changing competitive world: a Japanese perspective
Katayama, H., & Bennett, D. (1996) · International Journal of Operations & Production Management · doi:10.1108/01443579610109811 · Cited by 223
The evolution of production models: is a new paradigm emerging?
Bartezzaghi, E. (1999) · International Journal of Operations & Production Management · doi:10.1108/01443579910247446 · Cited by 185
Construction Productivity Improvement
Adrian, J. J. (1987) · Medical Entomology and Zoology · Cited by 166
Niepcel, W., & Molleman, E. (1998) · Human Relations · doi:10.1177/001872679805100304 · Cited by 165
Murman, E., Allen, T., Bozdogan, K., Cutcher-Gershenfeld, J., McManus, H., Nightingale, D., Rebentisch, E., Shields, T., Stahl, F., Walton, M., et al. (2002) · Palgrave Macmillan UK eBooks · doi:10.1057/9781403907509 · Cited by 161
Construction as a Complex System
Bertelsen, S. (2003) · Cited by 146
Ballard, G., & Howell, G. A. (2003) · Cited by 139
Balancing and Scheduling Mixed-Model U-Shaped Production Lines
Miltenburg, J. (2002) · International Journal of Flexible Manufacturing Systems · doi:10.1023/a:1014434117888 · Cited by 112
Developing a TQM Excellence Model
Ho, S. K. M., & Fung, C. K. (1994) · The TQM Journal · doi:10.1108/09544789410073612 · Cited by 85
Field Guide to Project Management
(2004) · Wiley eBooks · doi:10.1002/9780470172346 · Cited by 83
Quality relationships: partnering in the construction supply chain
Matthews, J., Pellew, L., Phua, F. T. T., & Rowlinson, S. (2000) · International Journal of Quality & Reliability Management · doi:10.1108/02656710010371191 · Cited by 81
Fujimoto, T. (2001) · Oxford University Press eBooks · doi:10.1093/0199248540.003.0010 · Cited by 52
Role of Tolerances and Process Capability Data in Product and Process Design Integration
Milberg, C. T., & Tommelein, I. D. (2003) · ASCE Construction Research Congress (CRC) · doi:10.1061/40671(2003)93 · Cited by 36
Cited by
Applying lean thinking in construction and performance improvement
Aziz, R. F., & Hafez, S. M. (2013) · Alexandria Engineering Journal · doi:10.1016/j.aej.2013.04.008 · Cited by 513
Enabling the Circular Economy transition: a sustainable lean manufacturing recipe for Industry 4.0
Ciliberto, C., Szopik‐Depczyńska, K., Tarczyńska‐Łuniewska, M., Ruggieri, A., & Ioppolo, G. (2021) · Business Strategy and the Environment · doi:10.1002/bse.2801 · Cited by 278
Implementation of lean practices in the construction industry: A systematic review
Babalola, O., Ibem, E. O., & Ezema, I. C. (2019) · Building and Environment · doi:10.1016/j.buildenv.2018.10.051 · Cited by 270
Improving construction supply chain collaboration and performance: a lean construction pilot project
Erik Eriksson, P. (2010) · Supply Chain Management: An International Journal · doi:10.1108/13598541011068323 · Cited by 246
Agus, A., & Shukri Hajinoor, M. (2012) · International Journal of Quality & Reliability Management · doi:10.1108/02656711211190891 · Cited by 242
Metadata
- Authors
- Salem, O., Solomon, J., Genaidy, A., & Minkarah, I.
- Venue
- Journal of Management in Engineering
- Published
- 2006-10
- Volume
- 22
- Issue
- 4
- Pages
- 168-175
- ISSN
- 0742-597X (ISSN-L)
- 1943-5479
- DOI
- 10.1061/(asce)0742-597x(2006)22:4(168
- OpenAlex
- W1974248948
- Cited by
- 412
- References
- 28
- FWCI
- 13.16
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.