Student or educator? Sign up with your school email and get 6 months of Pro free.
CoChat
Cited by 246

The DOI matches its Crossref record.

Improving construction supply chain collaboration and performance: a lean construction pilot project

Erik Eriksson, Per · 2010 · Supply Chain Management: An International Journal

Abstract

Purpose: Improving construction supply chain collaboration and performance is central for achieving short‐term business objectives as well as long‐term competitive advantage. Lean thinking is an approach that has been adopted in many different industrial settings as a means for improving supply chain performance. In the project‐based construction industry, lean thinking has, however, not yet been widely adopted. The purpose of this paper is to increase the understanding of how various aspects of lean thinking can be implemented in a construction project and how they affect supply chain actors and their performance. Design/methodology/approach: Action research was performed in a case study of a lean construction pilot project. Empirical data were collected through three surveys and follow‐up workshops, document studies, and interviews of 12 project participants. Findings: The findings show that many of the lean‐related aspects identified in the literature review were utilized in the pilot project. These aspects have mostly focused on increasing the cooperation among supply chain actors, for which reason the pilot project is very similar to a partnering project. Hence, much work remains in order to obtain full‐fledged lean construction, but the pilot project may serve as a starting point for continuous improvements and development of lean construction in future projects. Research limitations/implications: The research results are based on one empirical case study for which reasonable generalisations could be made, albeit cautiously. Practical implications: The frame of reference can serve as an illustration of important aspects and core elements of lean construction and the case study findings show how various lean related aspects can be implemented and how they affect supply chain actors and their performance in a construction project context. Originality/value: The action research approach based on both qualitative and quantitative data collection in a lean construction pilot project provides a valuable opportunity to study both the process of implementing lean construction and its outcomes.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1108/13598541011068323

Cites

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cited by

See all 246

Metadata

Authors
Erik Eriksson, P.
Venue
Supply Chain Management: An International Journal
Publisher
Emerald
Published
2010-08-10
Volume
15
Issue
5
Pages
394-403
ISSN
1359-8546 (ISSN-L)
OpenAlex
W1996851732
Cited by
246
References
0
FWCI
21.47
Type
journal article
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Improving construction supply chain collaboration and performance: a lean construction pilot project. https://app.cochat.ai/papers/10.1108/13598541011068323
The paper
Erik Eriksson, P. (2010). Improving construction supply chain collaboration and performance: a lean construction pilot project. Supply Chain Management: An International Journal. https://doi.org/10.1108/13598541011068323

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.