The DOI matches its Crossref record; 17 of the 17 references it cites were found in a registry or an index.
Visualization of Construction Progress Monitoring with 4D Simulation Model Overlaid on Time-Lapsed Photographs
Abstract
The ability to effectively communicate progress information and represent as-built and as-planned progress discrepancies are identified as key components for successful project management that allow corrective decisions to be made in a timely manner. However, current formats of reporting (e.g., textual progress reports, progress curves, and photographs) may not properly and quickly communicate project progress. Current monitoring methods also require manual data collection and extensive data extraction from different construction documents, which distract managers from the important task of decision making. Therefore, to facilitate progress monitoring, this paper proposes visualization of performance metrics that aims to represent progress deviations through superimposition of four-dimensional (4D) as-planned model over time-lapsed photographs in single and comprehensive visual imagery. As a part of the developed system, registration of the 4D model with photographs, augmenting photographs, and occlusion removal for progress images are presented. While contextual information is preserved, the as-built photographs are enhanced and augmented with 4D as-planned model in which the performance metrics are visualized. The augmented photographs provide a consistent platform for representing as-planned, as-built, and progress discrepancies information and facilitate communication and reporting processes.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Azuma, R. T. (1997) · Presence: Teleoperators and Virtual Environments · doi:10.1162/pres.1997.6.4.355 · Cited by 10,121
Computer Vision: A Modern Approach
Forsyth, D. A., & Ponce, J. (2002) · Cited by 3,739
SUSAN—a new approach to low level image processing
Smith, S. M., & Brady, J. M. (1997) · International Journal of Computer Vision · doi:10.1023/a:1007963824710 · Cited by 3,333
Project management : a systems approach to planning, scheduling, and controlling
Kerzner, H. (1995) · Thammasat University Digital Collections · Cited by 3,099
Project management: A systems approach to planning, scheduling and controlling
Botter, C. H. (1982) · European Journal of Operational Research · doi:10.1016/0377-2217(82)90164-3 · Cited by 2,408
Project management — A managerial approach
(1989) · European Journal of Operational Research · doi:10.1016/0377-2217(89)90451-7 · Cited by 1,547
Models of Construction Innovation
Slaughter, E. S. (1998) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1998)124:3(226 · Cited by 549
Productivity improvement in construction
Oglesby, C. H., Parker, H. W., & Howell, G. A. (1988) · Medical Entomology and Zoology · Cited by 510
Feasibility Study of 4D CAD in Commercial Construction
Koo, B., & Fischer, M. A. (2000) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2000)126:4(251 · Cited by 485
Professional Construction Management
Barrie, D. S., & Paulson, B. C. (1976) · Journal of the Construction Division · doi:10.1061/jcceaz.0000620 · Cited by 305
Cited by
Automatic creation of semantically rich 3D building models from laser scanner data
Xiong, X., Adan, A., Akinci, B., & Huber, D. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.10.006 · Cited by 703
Enhancing environmental sustainability over building life cycles through green BIM: A review
Wong, J. K. W., & Zhou, J. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.06.003 · Cited by 671
Computer vision techniques for construction safety and health monitoring
Seo, J., Han, S., Lee, S., & Kim, H. (2015) · Advanced Engineering Informatics · doi:10.1016/j.aei.2015.02.001 · Cited by 552
Self-citationChi, H.-L., Kang, S.-C., & Wang, X. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.12.017 · Cited by 476
Golparvar-Fard, M., Bohn, J., Teizer, J., Savarese, S., & Peña-Mora, F. (2011) · Automation in Construction · doi:10.1016/j.autcon.2011.04.016 · Cited by 418
Self-citation
Metadata
- Authors
- Golparvar-Fard, M., Peña-Mora, F., Arboleda, C. A., & Lee, S.
- Venue
- Journal of Computing in Civil Engineering
- Published
- 2009-11
- Volume
- 23
- Issue
- 6
- Pages
- 391-404
- ISSN
- 0887-3801 (ISSN-L)
- 1943-5487
- DOI
- 10.1061/(asce)0887-3801(2009)23:6(391
- OpenAlex
- W2080645307
- Cited by
- 259
- References
- 17
- FWCI
- 28.02
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Visualization of Construction Progress Monitoring with 4D Simulation Model Overlaid on Time-Lapsed Photographs. https://app.cochat.ai/papers/10.1061/(asce)0887-3801(2009)23:6(391
- The paper
- Golparvar-Fard, M., Peña-Mora, F., Arboleda, C. A., & Lee, S. (2009). Visualization of Construction Progress Monitoring with 4D Simulation Model Overlaid on Time-Lapsed Photographs. Journal of Computing in Civil Engineering. https://doi.org/10.1061/(asce)0887-3801(2009)23%3A6(391
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.