The DOI matches its Crossref record.
Questionnaire Survey on Bidding in Construction
Abstract
Bid decisions are heuristic in nature as they are made on the basis of experience, judgment, and perception. In an attempt to uncover the underlying factors that characterize the bidding decision‐making process, a questionnaire survey was conducted among general contractors. This paper contains results based on the response obtained from 400 of the top general contractors in the United States. Characteristics of the group, factors affecting bid/no‐bid and percent‐markup decisions, and policies and practices of the contractors are reported. The study reveals that bidding decisions are greatly influenced by subjectively evaluated criteria, such as type of job, location, size of job, need for work, Owner, subcontractors, degree of hazard, and degree of difficulty. Competition and profitability, although significant, are not the topranked factors.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
Project risk management in the Queensland engineering construction industry: a survey
Lyons, T., & Skitmore, M. (2004) · International Journal of Project Management · doi:10.1016/s0263-7863(03)00005-x · Cited by 340
Supporting the Bidding Decisions of Smallholder Farmers in Public Calls in Brazil
Alves Junior, P. N., Costa Melo, I., Yamanaka, L., Severino, M. R., & Rentizelas, A. (2021) · Agriculture · doi:10.3390/agriculture12010048 · Cited by 6
Metadata
- Authors
- Ahmad, I., & Minkarah, I.
- Venue
- Journal of Management in Engineering
- Published
- 1988-07
- Volume
- 4
- Issue
- 3
- Pages
- 229-243
- ISSN
- 0742-597X (ISSN-L)
- 1943-5479
- DOI
- 10.1061/(asce)9742-597x(1988)4:3(229
- OpenAlex
- W2039637367
- Cited by
- 221
- References
- 0
- FWCI
- 3.13
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Questionnaire Survey on Bidding in Construction. https://app.cochat.ai/papers/10.1061/(asce)9742-597x(1988)4:3(229
- The paper
- Ahmad, I., & Minkarah, I. (1988). Questionnaire Survey on Bidding in Construction. Journal of Management in Engineering. https://doi.org/10.1061/(asce)9742-597x(1988)4%3A3(229
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.