Empirical Comparison of Design/Build and Design/Bid/Build Project Delivery Methods
The DOI matches its Crossref record; 3 of the 3 references it cites were found in a registry or an index.
Abstract
This study compares the performance of design/bid/build and design/build to see if one project delivery method is superior in regards to time and cost. Similar military buildings were used to identify two samples of projects delivered with each of the two delivery methods. These projects provide a meaningful comparison because they include buildings of the same typology (i.e., U.S. Navy Bachelor Enlisted Quarters) delivered using similar design models. Project duration, project duration per bed, project time growth, cost growth and cost per bed were statistically compared. Upon completion of the analysis, the hypothesis that design/build projects are superior to design/bid/build projects in regards to time and cost was tested. Design/build projects were proven superior in performance in almost every measure. Other findings, including recommendations to practitioners and researchers, will be provided as well.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Statistics: Methods and Applications
Hill, T. E. (2005) · Cited by 1,116
Project Delivery Systems and Project Change: Quantitative Analysis
Ibbs, C. W., Kwak, Y. H., Ng, T., & Odabasi, A. M. (2003) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2003)129:4(382 · Cited by 262
Selecting Design-Build: Public and Private Sector Owner Attitudes
Songer, A. D., & Molenaar, K. R. (1996) · Journal of Management in Engineering · doi:10.1061/(asce)0742-597x(1996)12:6(47 · Cited by 159
Cited by
Circular public procurement through integrated contracts in the infrastructure sector
Lingegård, S., Havenvid, M. I., & Eriksson, P.-E. (2021) · Sustainability · doi:10.3390/su132111983 · Cited by 20
Metadata
- Authors
- Hale, D. R., Shrestha, P. P., Gibson, G. E., & Migliaccio, G. C.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2009-07
- Volume
- 135
- Issue
- 7
- Pages
- 579-587
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- OpenAlex
- W2128985906
- Cited by
- 284
- References
- 3
- FWCI
- 13.53
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Empirical Comparison of Design/Build and Design/Bid/Build Project Delivery Methods. https://app.cochat.ai/papers/10.1061/(asce)co.1943-7862.0000017
- The paper
- Hale, D. R., Shrestha, P. P., Gibson, G. E., & Migliaccio, G. C. (2009). Empirical Comparison of Design/Build and Design/Bid/Build Project Delivery Methods. Journal of Construction Engineering and Management. https://doi.org/10.1061/(asce)co.1943-7862.0000017
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.