Activity-Based Safety Risk Quantification for Concrete Formwork Construction

Hallowell, Matthew R., Gambatese, John A.·2009·Journal of Construction Engineering and Management

Abstract

Most of safety risk research focuses on high-severity safety risks for large-scale construction processes. Such studies help firms identify the highest risk processes so they may be targeted for improvement. However, few studies quantify safety risk at the activity level or include low-severity, high-frequency risks that some literatures suggest contribute to a large proportion of total risk. This paper presents research that involved the holistic quantification of risks for the activities associated with the construction of concrete formwork. Three major research efforts are discussed: (1) identification of activities required to construct concrete formwork; (2) selection of an appropriate all-inclusive and mutually exclusive risk classification system; and (3) the quantification of the average frequency and severity levels for each risk classification associated with each activity. To identify formwork construction activities, 256 worker-hours of observation were conducted and the resulting activity descriptions were reviewed and validated by industry professionals. Risk classifications appropriate for this study were created by aggregating relevant literature. Finally, the Delphi method was implemented to individually quantify average frequency and severity using scales that define the entire spectrum of possible values. In total, 130 frequency ratings and 130 severity ratings were obtained over three rounds of Delphi surveys. Results indicate that there are 13 major activities required to construct concrete formwork and the highest risk activities are applying form oil, lifting and lowering form components, and accepting materials from a crane. The data presented in this paper can be used to target specific high-risk formwork construction activities for improvement.

Overview

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1061/(asce)co.1943-7862.0000071

Cites

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cited by

See all 181

Metadata

Authors
Hallowell, M. R., & Gambatese, J. A.
Venue
Journal of Construction Engineering and Management
Published
2009-10
Volume
135
Issue
10
Pages
990-998
ISSN
  • 0733-9364 (ISSN-L)
  • 1943-7862
OpenAlex
W2018914771
Cited by
181
References
0
FWCI
13.22
Type
journal article
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Activity-Based Safety Risk Quantification for Concrete Formwork Construction. https://app.cochat.ai/papers/10.1061/(asce)co.1943-7862.0000071
The paper
Hallowell, M. R., & Gambatese, J. A. (2009). Activity-Based Safety Risk Quantification for Concrete Formwork Construction. Journal of Construction Engineering and Management. https://doi.org/10.1061/(asce)co.1943-7862.0000071

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.