The DOI matches its Crossref record; 3 of the 3 references it cites were found in a registry or an index.
Understanding Construction Industry Experience and Attitudes toward Integrated Project Delivery
Abstract
Integrated project delivery (IPD) seeks to improve project outcomes through a collaborative approach of aligning the incentives and goals of the project team through shared risk and reward, early involvement of all parties, and a multiparty agreement. Although there has been a huge interest in IPD in principle, the current adoption status by the construction industry is unknown. Several professional organizations are supporting the advancement of IPD, and several projects have demonstrated its benefits; however, the amount of projects using IPD remains relatively small. This research is based on the results of a web-based survey that was designed to target a wide range of construction professionals in an effort to shed light on current status of IPD use and its future widespread adoption by the construction industry. The paper attempts to provide hard data concerning the knowledge and experience levels of construction professionals regarding IPD as well as their opinions concerning its benefits and problems as a project delivery method.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Eastman, C., Teicholz, P. M., Sacks, R., & Liston, K. (2008) · Cited by 2,892
Eastman, C., Teicholz, P., Sacks, R., & Liston, K. (2008) · Wiley eBooks · doi:10.1002/9780470261309 · Cited by 889
Cost Analysis of Inadequate Interoperability in the U.S. Capital Facilities Industry
Gallaher, M. P., O'Connor, A. C., Dettbarn, Jr., & Gilday, L. T. (2004) · doi:10.6028/nist.gcr.04-867 · Cited by 663
Cited by
Building Information Modeling (BIM) for green buildings: A critical review and future directions
Lu, Y., Wu, Z., Chang, R., & Li, Y. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.08.024 · Cited by 555
Collaboration in BIM-based construction networks: A bibliometric-qualitative literature review
Oraee, M., Hosseini, M. R., Papadonikolaki, E., Palliyaguru, R., & Arashpour, M. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.07.001 · Cited by 415
Understanding effects of BIM on collaborative design and construction: An empirical study in China
Liu, Y., van Nederveen, S., & Hertogh, M. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.06.007 · Cited by 411
Patterns and trends in Building Information Modeling (BIM) research: A Latent Semantic Analysis
Yalcinkaya, M., & Singh, V. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.07.012 · Cited by 272
Digital twin aided sustainability-based lifecycle management for railway turnout systems
Kaewunruen, S., & Lian, Q. (2019) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2019.04.156 · Cited by 265
Metadata
- Authors
- Kent, D. C., & Becerik-Gerber, B.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2010-08
- Volume
- 136
- Issue
- 8
- Pages
- 815-825
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- OpenAlex
- W1967070100
- Cited by
- 424
- References
- 3
- FWCI
- 17.01
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Understanding Construction Industry Experience and Attitudes toward Integrated Project Delivery. https://app.cochat.ai/papers/10.1061/(asce)co.1943-7862.0000188
- The paper
- Kent, D. C., & Becerik-Gerber, B. (2010). Understanding Construction Industry Experience and Attitudes toward Integrated Project Delivery. Journal of Construction Engineering and Management. https://doi.org/10.1061/(asce)co.1943-7862.0000188
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.