Understanding Construction Industry Experience and Attitudes toward Integrated Project Delivery
The DOI matches its Crossref record; 3 of the 3 references it cites were found in a registry or an index.
Abstract
Integrated project delivery (IPD) seeks to improve project outcomes through a collaborative approach of aligning the incentives and goals of the project team through shared risk and reward, early involvement of all parties, and a multiparty agreement. Although there has been a huge interest in IPD in principle, the current adoption status by the construction industry is unknown. Several professional organizations are supporting the advancement of IPD, and several projects have demonstrated its benefits; however, the amount of projects using IPD remains relatively small. This research is based on the results of a web-based survey that was designed to target a wide range of construction professionals in an effort to shed light on current status of IPD use and its future widespread adoption by the construction industry. The paper attempts to provide hard data concerning the knowledge and experience levels of construction professionals regarding IPD as well as their opinions concerning its benefits and problems as a project delivery method.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Eastman, C., Teicholz, P. M., Sacks, R., & Liston, K. (2008) · Cited by 2,892
Eastman, C., Teicholz, P., Sacks, R., & Liston, K. (2008) · Wiley eBooks · doi:10.1002/9780470261309 · Cited by 889
Cost Analysis of Inadequate Interoperability in the U.S. Capital Facilities Industry
Gallaher, M. P., O'Connor, A. C., Dettbarn, Jr., & Gilday, L. T. (2004) · doi:10.6028/nist.gcr.04-867 · Cited by 663
Cited by
Building Information Modeling (BIM) for green buildings: A critical review and future directions
Lu, Y., Wu, Z., Chang, R., & Li, Y. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.08.024 · Cited by 555
Collaboration in BIM-based construction networks: A bibliometric-qualitative literature review
Oraee, M., Hosseini, M. R., Papadonikolaki, E., Palliyaguru, R., & Arashpour, M. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.07.001 · Cited by 415
Understanding effects of BIM on collaborative design and construction: An empirical study in China
Liu, Y., van Nederveen, S., & Hertogh, M. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.06.007 · Cited by 411
Patterns and trends in Building Information Modeling (BIM) research: A Latent Semantic Analysis
Yalcinkaya, M., & Singh, V. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.07.012 · Cited by 272
Digital twin aided sustainability-based lifecycle management for railway turnout systems
Kaewunruen, S., & Lian, Q. (2019) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2019.04.156 · Cited by 265
Impact of integration management on construction project management performance
Demirkesen, S., & Ozorhon, B. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.09.008 · Cited by 259
Collaboration barriers in BIM-based construction networks: A conceptual model
Oraee, M., Hosseini, M. R., Edwards, D. J., Li, H., Papadonikolaki, E., & Cao, D. (2019) · International Journal of Project Management · doi:10.1016/j.ijproman.2019.05.004 · Cited by 251
“According to the findings, the most influential organisational barriers included the lack of contractual standards on BIM models (Ku and Pollalis, 2009), different collaboration approaches to BIM by different organisations (Ku Table 2 Context-related barriers to collaboration in BbCNs. Factor Barrier Description Envir…”
BackgroundInfluentialAntwi-Afari, M. F., Li, H., Pärn, E. A., & Edwards, D. J. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.03.010 · Cited by 210
Impact of Team Integration and Group Cohesion on Project Delivery Performance
Franz, B., Leicht, R., Molenaar, K., & Messner, J. (2017) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001219 · Cited by 185
Zhang, L., Cao, T., & Wang, Y. (2018) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.08.014 · Cited by 173
“014 style rewards, and multiparty agreement (Kent and Becerik-Gerber, 2010), collaboration among heterogeneous project parties has become the critical success factor for operating integrated projects (Phua and Rowlinson, 2004; Xue et al.”
BackgroundInfluentialLean thinking in the highways construction sector: motivation, implementation and barriers
Tezel, A., Koskela, L., & Aziz, Z. (2018) · Production Planning & Control · doi:10.1080/09537287.2017.1412522 · Cited by 165
“IPD type relational contracting strategies were found useful in disseminating innovative approaches (i.e. BIM, lean thinking or sustainable construction) to smaller subcontractors (Matthews and Howell 2005; Kent and Becerik-Gerber 2010; Lahdenperä 2012).”
MethodCarvajal-Arango, D., Bahamón-Jaramillo, S., Aristizábal-Monsalve, P., Vásquez-Hernández, A., & Botero, L. F. B. (2019) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2019.05.216 · Cited by 159
Lingard, H., Pirzadeh, P., Blismas, N., Wakefield, R., & Kleiner, B. (2014) · Construction Management and Economics · doi:10.1080/01446193.2014.911931 · Cited by 47
Zhang, X., Denicol, J., Chan, P. W., & Le, Y. (2024) · Journal of Operations Management · doi:10.1002/joom.1275 · Cited by 44
Metadata
- Authors
- Kent, D. C., & Becerik-Gerber, B.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2010-08
- Volume
- 136
- Issue
- 8
- Pages
- 815-825
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- OpenAlex
- W1967070100
- Cited by
- 424
- References
- 3
- FWCI
- 17.01
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.