Fuzzy AHP-Based Risk Assessment Methodology for PPP Projects

Li, Jie, Zou, Patrick X. W. · 2011 · Journal of Construction Engineering and Management
Cited by 182

The DOI matches its Crossref record.

Abstract

Public Private Partnerships (PPPs) have been used globally as a method to procure infrastructure projects, such as expressways, bridges, water plants, and power plants. The risks involved in such PPP projects are unique because of the large amount of investment and long contractual concession period. This paper proposed a fuzzy analytical hierarchy process (AHP) as risk assessment technique to simulate the vagueness of human judgement and to improve the assessment accuracy. Furthermore, a comparison was made between the proposed fuzzy AHP and straight-AHP in this paper. The fuzzy AHP process was illustrated by using an actual PPP expressway project from China. The results showed that planning deficiency, low project residual value (after 30 years of operation), lack of qualified bidders, design deficiency, and long project approval time were assessed as the top five risks for the project, and the feedback from the experts showed that these results reflected the actual project risk situation.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1061/(asce)co.1943-7862.0000362

Cites

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cited by

See all 182

Metadata

Authors
Li, J., & Zou, P. X. W.
Venue
Journal of Construction Engineering and Management
Published
2011-12
Volume
137
Issue
12
Pages
1205-1209
ISSN
  • 0733-9364 (ISSN-L)
  • 1943-7862
OpenAlex
W2002565515
Cited by
182
References
0
FWCI
15.91
Type
journal article
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Fuzzy AHP-Based Risk Assessment Methodology for PPP Projects. https://app.cochat.ai/papers/10.1061/(asce)co.1943-7862.0000362
The paper
Li, J., & Zou, P. X. W. (2011). Fuzzy AHP-Based Risk Assessment Methodology for PPP Projects. Journal of Construction Engineering and Management. https://doi.org/10.1061/(asce)co.1943-7862.0000362

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.