Fuzzy AHP-Based Risk Assessment Methodology for PPP Projects
The DOI matches its Crossref record; 7 of the 7 references it cites were found in a registry or an index.
Abstract
Public Private Partnerships (PPPs) have been used globally as a method to procure infrastructure projects, such as expressways, bridges, water plants, and power plants. The risks involved in such PPP projects are unique because of the large amount of investment and long contractual concession period. This paper proposed a fuzzy analytical hierarchy process (AHP) as risk assessment technique to simulate the vagueness of human judgement and to improve the assessment accuracy. Furthermore, a comparison was made between the proposed fuzzy AHP and straight-AHP in this paper. The fuzzy AHP process was illustrated by using an actual PPP expressway project from China. The results showed that planning deficiency, low project residual value (after 30 years of operation), lack of qualified bidders, design deficiency, and long project approval time were assessed as the top five risks for the project, and the feedback from the experts showed that these results reflected the actual project risk situation.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
The Analytic Hierarchy Process
SAATY, T. L., & KEARNS, K. P. (1985) · Analytical Planning · doi:10.1016/b978-0-08-032599-6.50008-8 · Cited by 15,357
Buckley, J. J. (1985) · Fuzzy Sets and Systems · doi:10.1016/0165-0114(85)90090-9 · Cited by 3,360
Introduction to Fuzzy Arithmetic
Kaufmann, A., & Gupta, M. M. (1991) · Van Nostrand Reinhold eBooks · Cited by 3,020
Introduction to Fuzzy Arithmetic
Gupta, M. M., & Kaufman, A. (1991) · Cited by 1,051
Multicriteria analysis with fuzzy pairwise comparison
Deng, H. (1999) · International Journal of Approximate Reasoning · doi:10.1016/s0888-613x(99)00025-0 · Cited by 765 · cited 1×
“However, AHP is often criticized on its inability to resolve the uncertainty and imprecision associatedwith themapping of the decisionmaker’s perception to a crisp number (Deng 1999).”
BackgroundCritical Success Factors for Public–Private Partnerships in Infrastructure Development
Zhang, X. (2005) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2005)131:1(3 · Cited by 748 · cited 1×
“There have been many spectacularly unsuccessful PPP projects, such as the Malaysian Privatized National Sewerage project, Parkeerschap Den Bosch, the Betuwe Railway in Netherlands (Zhang 2005), the Sydney Airport Link, the Sydney Cross City Tunnel, the 9th Shen Yang Water Plant, the 4th Min Jiang River Bridge in Fuzho…”
BackgroundTscheulin, D. K. (2000) · Gabler Verlag eBooks · doi:10.1007/978-3-322-94547-1_19 · Cited by 308
Cited by
Pan, Y., & Zhang, L. (2021) · Automation in Construction · doi:10.1016/j.autcon.2020.103517 · Cited by 1,336
Review of application of analytic hierarchy process (AHP) in construction
Darko, A., Chan, A. P. C., Ameyaw, E. E., Owusu, E. K., Pärn, E., & Edwards, D. J. (2019) · International Journal of Construction Management · doi:10.1080/15623599.2018.1452098 · Cited by 721
Risk Assessment Using a New Consulting Process in Fuzzy AHP
Lyu, H.-M., Sun, W.-J., Shen, S.-L., & Zhou, A.-N. (2020) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001757 · Cited by 279
Afzal, F., Yunfei, S., Nazir, M., & Bhatti, S. M. (2021) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-02-2019-0047 · Cited by 172
Zhao, Z.-Y., Zuo, J., & Zillante, G. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2015.08.066 · Cited by 171
“Risk management plays a crucial role in managing mega infrastructure projects where risks evaluation and system engineering methods could be adopted (Li and Zou, 2011; Locatelli et al., 2014).”
BackgroundIslam, M. S., Nepal, M. P., Skitmore, M., & Attarzadeh, M. (2017) · Advanced Engineering Informatics · doi:10.1016/j.aei.2017.06.001 · Cited by 163
Valipour, A., Yahaya, N., Md Noor, N., Kildienė, S., Sarvari, H., & Mardani, A. (2015) · Journal of Civil Engineering and Management · doi:10.3846/13923730.2015.1051104 · Cited by 111
Metadata
- Authors
- Li, J., & Zou, P. X. W.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2011-12
- Volume
- 137
- Issue
- 12
- Pages
- 1205-1209
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- OpenAlex
- W2002565515
- Cited by
- 182
- References
- 7
- FWCI
- 15.91
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.