Student or educator? Sign up with your school email and get 6 months of Pro free.
CoChat
Cited by 174

The DOI matches its Crossref record; 1 of the 1 references it cites were found in a registry or an index.

Critical Project Management Factors of AEC Firms for Delivering Green Building Projects in Singapore

Li, Yuan Yuan, Chen, Po-Han, Chew, David Ah Seng, Teo, Chee Chong, Ding, Rong Gui · 2011 · Journal of Construction Engineering and Management

Abstract

In recent years, greater environmental awareness had induced the managers of building projects to “go green,” and several studies have been conducted on the project delivery of green building. However, there is no comprehensive study that explores the important project management factors from the perspective of architectural, engineering, and construction (AEC) firms, whose decisions can significantly affect the environmental performance of building projects. In Singapore, Green Mark, a certification for green building, has become a compulsory requirement for all new buildings. AEC firms are now facing challenges on how best to attain Green Mark certification with minimum cost and resources. The purpose of this research is to identify the controllable critical project management factors for delivering Green Mark certified projects to achieve higher Green Mark ratings. Nineteen controllable project management factors were first identified from related literature, and then a survey was carried out to collect data needed to perform the principal component factor analysis. The factor analysis revealed that the controllable project management factors could be grouped into five major components, namely, (1) human resource–oriented factors, (2) technical and innovation-oriented factors, (3) support from designers and senior management, (4) project manager’s competence, and (5) coordination of designers and contractors. Finally, multiple regression analysis was applied. It was found that the coordination of designers and contractors and technical and innovation-oriented factors are the most critical success factors, and possible reasons are discussed. With the help of the research findings, project organizations in Singapore will manage their Green Mark certified projects to achieve higher rating levels in a more efficient and effective way.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1061/(asce)co.1943-7862.0000370

Cites

1 of 1 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Show all 1 references

Cited by

See all 174

Metadata

Authors
Li, Y. Y., Chen, P.-H., Chew, D. A. S., Teo, C. C., & Ding, R. G.
Venue
Journal of Construction Engineering and Management
Published
2011-12
Volume
137
Issue
12
Pages
1153-1163
ISSN
  • 0733-9364 (ISSN-L)
  • 1943-7862
OpenAlex
W1990486493
Cited by
174
References
1
FWCI
13.15
Type
journal article
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Critical Project Management Factors of AEC Firms for Delivering Green Building Projects in Singapore. https://app.cochat.ai/papers/10.1061/(asce)co.1943-7862.0000370
The paper
Li, Y. Y., Chen, P.-H., Chew, D. A. S., Teo, C. C., & Ding, R. G. (2011). Critical Project Management Factors of AEC Firms for Delivering Green Building Projects in Singapore. Journal of Construction Engineering and Management. https://doi.org/10.1061/(asce)co.1943-7862.0000370

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.