Critical Project Management Factors of AEC Firms for Delivering Green Building Projects in Singapore
The DOI matches its Crossref record; 43 of the 43 references it cites were found in a registry or an index.
Abstract
In recent years, greater environmental awareness had induced the managers of building projects to “go green,” and several studies have been conducted on the project delivery of green building. However, there is no comprehensive study that explores the important project management factors from the perspective of architectural, engineering, and construction (AEC) firms, whose decisions can significantly affect the environmental performance of building projects. In Singapore, Green Mark, a certification for green building, has become a compulsory requirement for all new buildings. AEC firms are now facing challenges on how best to attain Green Mark certification with minimum cost and resources. The purpose of this research is to identify the controllable critical project management factors for delivering Green Mark certified projects to achieve higher Green Mark ratings. Nineteen controllable project management factors were first identified from related literature, and then a survey was carried out to collect data needed to perform the principal component factor analysis. The factor analysis revealed that the controllable project management factors could be grouped into five major components, namely, (1) human resource–oriented factors, (2) technical and innovation-oriented factors, (3) support from designers and senior management, (4) project manager’s competence, and (5) coordination of designers and contractors. Finally, multiple regression analysis was applied. It was found that the coordination of designers and contractors and technical and innovation-oriented factors are the most critical success factors, and possible reasons are discussed. With the help of the research findings, project organizations in Singapore will manage their Green Mark certified projects to achieve higher rating levels in a more efficient and effective way.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
An Index of Factorial Simplicity
Kaiser, H. F. (1974) · Psychometrika · doi:10.1007/bf02291575 · Cited by 14,898 · cited 1×
“5, the data set is suitable for factor analysis (Kaiser 1974).”
MethodAn Introduction to Statistical Methods and Data Analysis
(1994) · Technometrics · doi:10.1080/00401706.1994.10485832 · Cited by 5,346
Guanxi and organizational dynamics: organizational networking in Chinese firms
Park, S. H., & Luo, Y. (2001) · Strategic Management Journal · doi:10.1002/smj.167 · Cited by 1,961 · cited 1×
“In some the other researchers’ work (e.g., Kale 1999; Park and Luo 2001), regression models are accepted even when most of the results of adjusted R2 are less than 0.”
BackgroundCronbach's Alpha: A Tool for Assessing the Reliability of Scales
Santos, J. R. A. (1999) · Journal of Extension · doi:10.66752/1077-5315.7392 · Cited by 1,554 · cited 1×
“The Cronbach alpha coefficient (α) has a value that ranges from 0–1 and may be used to describe the reliability of factors extracted from dichotomous and/or multipoint formatted questionnaires or scales (Santos and Reynaldo 1999).”
MethodSPSS 13.0 : Guide to data analysis
Norušis, M. J. (1995) · Cited by 1,418
A new framework for determining critical success/failure factors in projects
Belassi, W., & Tukel, O. I. (1996) · International Journal of Project Management · doi:10.1016/0263-7863(95)00064-x · Cited by 1,187
Measurement of project success
de Wit, A. (1988) · International Journal of Project Management · doi:10.1016/0263-7863(88)90043-9 · Cited by 977
The role of project management in achieving project success
Munns, A., & Bjeirmi, B. (1996) · International Journal of Project Management · doi:10.1016/0263-7863(95)00057-7 · Cited by 910
Factors Affecting the Success of a Construction Project
Chan, A. P. C., Scott, D. R., & Chan, A. P. L. (2004) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2004)130:1(153 · Cited by 821
Current practice in project management — an empirical study
White, D., & Fortune, J. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(00)00029-6 · Cited by 705
Framing of project critical success factors by a systems model
Fortune, J., & White, D. (2006) · International Journal of Project Management · doi:10.1016/j.ijproman.2005.07.004 · Cited by 616
An Introduction to Statistical Methods and Data Analysis.
Abeles, F., & Ott, L. (1983) · Journal of the American Statistical Association · doi:10.2307/2288162 · Cited by 610
Factors influencing project success: the impact of human resource management
Belout, A., & Gauvreau, C. (2004) · International Journal of Project Management · doi:10.1016/s0263-7863(03)00003-6 · Cited by 566
SPSS for Windows : professional statistics, release 5
Norušis, M. J. (1992) · Medical Entomology and Zoology · Cited by 517
Factors affecting cost performance: evidence from Indian construction projects
Iyer, K. C., & Jha, K. N. (2005) · International Journal of Project Management · doi:10.1016/j.ijproman.2004.10.003 · Cited by 504
The SPSS Guide to Data Analysis
Pnrunak, A. (1988) · Technometrics · doi:10.1080/00401706.1988.10488384 · Cited by 457
A study on project success factors in large construction projects in Vietnam
Duy Nguyen, L., Ogunlana, S. O., & Thi Xuan Lan, D. (2004) · Engineering, Construction and Architectural Management · doi:10.1108/09699980410570166 · Cited by 415
Systems Analysis and Project Management.
Schmidt, R. N., Cleland, D. I., & King, W. R. (1969) · Administrative Science Quarterly · doi:10.2307/2391604 · Cited by 411
Factors Affecting Project Success
Baker, B. N., Murphy, D. C., & Fisher, D. (1997) · Project Management Handbook · doi:10.1002/9780470172353.ch35 · Cited by 401
Design and Build Project Success Factors: Multivariate Analysis
Chan, A. P. C., Ho, D. C. K., & Tam, C. M. (2001) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2001)127:2(93 · Cited by 316
A practical use of key success factors to improve the effectiveness of project management
Clarke, A. (1999) · International Journal of Project Management · doi:10.1016/s0263-7863(98)00031-3 · Cited by 313
Green buildings, organizational success and occupant productivity
Heerwagen, J. (2000) · Building Research & Information · doi:10.1080/096132100418500 · Cited by 310
Critical Success Factors in R&D Projects
Pinto, J. K., & Slevin, D. P. (1989) · Research-Technology Management · doi:10.1080/08956308.1989.11670572 · Cited by 294
Framework for project managers to manage construction safety
Teo, E. A. L., Ling, F. Y. Y., & Chong, A. F. W. (2004) · International Journal of Project Management · doi:10.1016/j.ijproman.2004.09.001 · Cited by 290
Lean Processes for Sustainable Project Delivery
Lapinski, A. R., Horman, M. J., & Riley, D. R. (2006) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2006)132:10(1083 · Cited by 268
In search of excellence in project management
Kerzner, H. (1987) · Journal of systems management · doi:10.5555/25198.25371 · Cited by 266
CRITICAL SUCCESS FACTORS ACROSS THE PROJECT LIFE CYCLE
Al-Fahdawi, M. S., Rawi, O. S. A., & Hassan, A. S. (2025) · Journal of Al-Azhar University Engineering Sector · doi:10.21608/auej.2025.336575.1735 · Cited by 259
Lock, D. (1987) · Cited by 258
Critical Factors Affecting Schedule Performance: Evidence from Indian Construction Projects
Iyer, K. C., & Jha, K. N. (2006) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2006)132:8(871 · Cited by 244
Commitment, coordination, competence and the iron triangle
Jha, K. N., & Iyer, K. C. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.11.009 · Cited by 243
Compressing construction durations: lessons learned from Hong Kong building projects
W.M. Chan, D., & M. Kumaraswamy, M. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(00)00032-6 · Cited by 209
Determinants of Successful Design-Build Projects
Lam, E. W., Chan, A. P., & Chan, D. W. (2008) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2008)134:5(333 · Cited by 166
Optimal Allocation of Project Management Resources for Achieving Success
Jaselskis, E. J., & Ashley, D. B. (1991) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1991)117:2(321 · Cited by 158
Impact of corporate strengths/weaknesses on project management competencies
Işık, Z., Arditi, D., Dikmen, İ., & Birgönül, M. T. (2008) · International Journal of Project Management · doi:10.1016/j.ijproman.2008.10.002 · Cited by 149
How important is cooperation to construction project success? A grounded empirical quantification
Phua, F. T. T., & Rowlinson, S. (2004) · Engineering Construction & Architectural Management · doi:10.1108/09699980410512656 · Cited by 145
An Introduction To Statistical Methods
Gupta, C. B. (1982) · Andalas University Repository (Andalas University) · Cited by 134
Sustainable housing and urban construction in China
Zhu, Y., & Lin, B. (2004) · Energy and Buildings · doi:10.1016/j.enbuild.2003.11.007 · Cited by 131
A building revolution: How ecology and health concerns are transforming construction
(1995) · Environment International · doi:10.1016/0160-4120(95)90083-7 · Cited by 118
The environment: the fourth construction project objective?
Ofori, G. (1992) · Construction Management and Economics · doi:10.1080/01446199200000037 · Cited by 115
Identifying critical success factors in defense development projects: A multivariate analysis
Tishler, A., Dvir, D., Shenhar, A. J., & Lipovetsky, S. (1996) · Technological Forecasting and Social Change · doi:10.1016/0040-1625(95)00197-2 · Cited by 114
Walker, D. H. T., & Shen, Y. J. (2002) · Construction Management and Economics · doi:10.1080/01446190110089691 · Cited by 93
Sustainable Construction: Some Economic Challenges
Bon, R. (2001) · The Geojournal library · doi:10.1007/978-94-017-3563-6_14 · Cited by 89
Promoting sustainable construction waste management in Hong Kong
Wong, E. O. W., & Yip, R. (2004) · Construction Management and Economics · doi:10.1080/0144619042000226270 · Cited by 55
Cited by
Green building research–current status and future agenda: A review
Zuo, J., & Zhao, Z.-Y. (2014) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2013.10.021 · Cited by 1,194
Critical barriers to green building technologies adoption in developing countries: The case of Ghana
Chan, A. P. C., Darko, A., Olanipekun, A. O., & Ameyaw, E. E. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.10.235 · Cited by 543
Banihashemi, S., Hosseini, M. R., Golizadeh, H., & Sankaran, S. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.01.014 · Cited by 441
Wuni, I. Y., Shen, G. Q. P., & Osei-Kyei, R. (2019) · Energy and Buildings · doi:10.1016/j.enbuild.2019.02.010 · Cited by 370
Critical analysis of green building research trend in construction journals
Darko, A., & Chan, A. P. C. (2016) · Habitat International · doi:10.1016/j.habitatint.2016.07.001 · Cited by 342
Metadata
- Authors
- Li, Y. Y., Chen, P.-H., Chew, D. A. S., Teo, C. C., & Ding, R. G.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2011-12
- Volume
- 137
- Issue
- 12
- Pages
- 1153-1163
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- OpenAlex
- W1990486493
- Cited by
- 174
- References
- 43
- FWCI
- 13.15
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.