The DOI matches its Crossref record; 6 of the 6 references it cites were found in a registry or an index.
Integrated Sequential As-Built and As-Planned Representation with D4AR Tools in Support of Decision-Making Tasks in the AEC/FM Industry
Open accessAbstract
The significant advancement in digital imaging and widespread popularity of digital cameras for capturing a comprehensive visual record of construction performance in the architecture, engineering, construction, and facility management (AEC/FM) industries have triggered an extensive growth in the rate of site photography, allowing hundreds of images to be stored for a project on a daily basis. Meanwhile, collaborative AEC technologies centering around building information models (BIMs) are becoming widely applied to support various architectural, structural, and preconstruction decision-making tasks. These models, if integrated with the as-built perspective of a construction, have great potential to extensively add value during the construction phase of a project. This paper reports recent developments from research efforts in (1) automated acquisition of as-built point-cloud models from unordered daily site photo collections and geo-registration of site images, (2) automated generation of four-dimensional (4D) as-built point-cloud models, and (3) semiautomated superimposition of the integrated as-built model over 4D (three dimensions plus time) BIMs to generate integrated 4D as-built and as-planned visualizations. The limitations and benefits of each modeling approach, the motivations for development of 4D augmented-reality (D4AR) environments for integrated visualization of as-built and as-planned models, the perceived and observed applications, and the benefits in seven case studies are discussed. Not only does a D4AR model visualize construction processes and performance deviations, it can also be used as a tool for automated and remote monitoring of progress and safety, quality control, and site layout management, and enables enhanced coordination and communication.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Distinctive Image Features from Scale-Invariant Keypoints
Lowe, D. G. (2004) · International Journal of Computer Vision · doi:10.1023/b:visi.0000029664.99615.94 · Cited by 55,589
Fischler, M. A., & Bolles, R. C. (1981) · Communications of the ACM · doi:10.1145/358669.358692 · Cited by 25,893
Multiple View Geometry in Computer Vision
Hartley, R., & Zisserman, A. (2004) · doi:10.1017/cbo9780511811685 · Cited by 21,070
A Combined Corner and Edge Detector
Harris, C., & Stephens, M. (1988) · Procedings of the Alvey Vision Conference 1988 · doi:10.5244/c.2.23 · Cited by 12,901
Bundle Adjustment — A Modern Synthesis
Triggs, B., McLauchlan, P. F., Hartley, R. I., & Fitzgibbon, A. W. (2000) · Lecture Notes in Computer Science · doi:10.1007/3-540-44480-7_21 · Cited by 3,988
A comparison of affine region detectors
Mikolajczyk, K., Tuytelaars, T., Schmid, C., Zisserman, A., Matas, J., Schaffalitzky, F., Kadir, T., & Gool, L. V. (2005) · International Journal of Computer Vision · doi:10.1007/s11263-005-3848-x · Cited by 2,939
Cited by
Towards a semantic Construction Digital Twin: Directions for future research
Boje, C., Guerriero, A., Kubicki, S., & Rezgui, Y. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103179 · Cited by 1,324
A critical review of virtual and augmented reality (VR/AR) applications in construction safety
Li, X., Yi, W., Chi, H.-L., Wang, X., & Chan, A. P. C. (2018) · Automation in Construction · doi:10.1016/j.autcon.2017.11.003 · Cited by 1,055
Computer vision techniques in construction: A critical review
Xu, S., Wang, J., Shou, W., Ngo, T., Sadick, A.-M., & Wang, X. (2021) · Archives of Computational Methods in Engineering · doi:10.1007/s11831-020-09504-3 · Cited by 409
Golparvar-Fard, M., Peña-Mora, F., & Savarese, S. (2015) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000205 · Cited by 404
Self-citationYang, J., Park, M.-W., Vela, P. A., & Golparvar-Fard, M. (2015) · Advanced Engineering Informatics · doi:10.1016/j.aei.2015.01.011 · Cited by 292
Self-citation
Metadata
- Authors
- Golparvar-Fard, M., Peña-Mora, F., & Savarese, S.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2011-12
- Volume
- 137
- Issue
- 12
- Pages
- 1099-1116
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- OpenAlex
- W2044592842
- Cited by
- 210
- References
- 6
- FWCI
- 21.46
- Type
- journal article
- Language
- en
- Open access
- bronze
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Integrated Sequential As-Built and As-Planned Representation with D4AR Tools in Support of Decision-Making Tasks in the AEC/FM Industry. https://app.cochat.ai/papers/10.1061/(asce)co.1943-7862.0000371
- The paper
- Golparvar-Fard, M., Peña-Mora, F., & Savarese, S. (2011). Integrated Sequential As-Built and As-Planned Representation with D4AR Tools in Support of Decision-Making Tasks in the AEC/FM Industry. Journal of Construction Engineering and Management. https://doi.org/10.1061/(asce)co.1943-7862.0000371
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.