Relationship between Construction Safety and Quality Performance
The DOI matches its Crossref record; 25 of the 25 references it cites were found in a registry or an index.
Abstract
It is well established that the project cost, quality, safety, and duration are the four critical elements that contribute to project success. Past literature has established theoretical relationships between construction safety and quality on the basis of opinions of industry experts. This is the first empirical inquiry into the relationship between safety and quality, testing the null hypothesis that there is no statistical relationship among quality performance indicators and safety performance indicators. To test this hypothesis, empirical data were collected from 32 building construction projects, ranging in scope from $50,000 to $300 million dollars. Several quality metrics (e.g., cost of rework per $1M project scope and rate of rework per 200,000 worker-hours) were used as predictor variables and first aid and Occupational Safety and Health Administration (OSHA) recordable injury rates were used as response variables. Linear regressions among the predictor and response variables showed that there are two statistically significant relationships: the OSHA recordable injury rate is positively correlated to rework (r2=0.968; p-value=0.032) and the first aid rate is positively correlated to number of defects (r2=0.548; p-value=0.009). To understand why these relationships exist and to identify specific strategies that promote both safety and quality, open-ended interviews were conducted with project managers. These individuals indicated that the most compelling reason for the strong positive correlation between rework and injuries is the fact that rework involves demolition, schedule pressure, and unstable work processes. They also noted that devoting resources to preplanning, allowing the necessary time to complete tasks correctly the first time, encouraging leadership at the workface, and encouraging workers to take pride in their work are all strategies that promote both safety and quality.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Reason, J. (1990) · doi:10.1017/cbo9781139062367 · Cited by 5,108
Industrial accident prevention
Hienrich, H. W., Peterson, D., & Roos, N. R. (1941) · Cited by 815
Industrial Accident Prevention.
Ingall, C. G. (1927) · Journal of State Medicine · Cited by 710
Safety Climate in Construction Site Environments
Mohamed, S. (2002) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2002)128:5(375 · Cited by 648 · cited 2×
“Author keywords: Safety; Quality; Planning; Project management; Labor and personnel issues.”
BackgroundQuantifying the causes and costs of rework in construction
Love, P. E. D., & Li, H. (2000) · Construction Management and Economics · doi:10.1080/01446190050024897 · Cited by 486
Linking construction fatalities to the design for construction safety concept
Behm, M. (2005) · Safety Science · doi:10.1016/j.ssci.2005.04.002 · Cited by 473 · cited 2×
“After eliminating projects that did not report either safety or quality data, there were 18 remaining data points.”
BackgroundInfluence of Project Type and Procurement Method on Rework Costs in Building Construction Projects
Love, P. E. D. (2002) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2002)128:1(18 · Cited by 463 · cited 1×
“On the basis of a comprehensive literature review, Love (2002) reported several measures of rework, including quality deviations (Burati et al. 1992), nonconformance (Abdul-Rahman 1995), defects (Josephson and Hammarlund 1999), and quality failures (Barber et al. 2000).”
BackgroundDevelopment of Causal Model of Construction Accident Causation
Suraji, A., Duff, A. R., & Peckitt, S. J. (2001) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2001)127:4(337 · Cited by 425 · cited 2×
“After eliminating projects that did not report either safety or quality data, there were 18 remaining data points.”
BackgroundThe causes and costs of defects in construction
Josephson, P.-E., & Hammarlund, Y. (1999) · Automation in Construction · doi:10.1016/s0926-5805(98)00114-9 · Cited by 410 · cited 8×
“Although there is an extensive body of literature related to rework, the majority of empirical research on the causes of rework examines the impact of rework on cost data and other project metrics in an effort to determine monetary loss associated with rework (e.g., Josephson and Hammarlund 1999).”
BackgroundInfluentialAnalysis of Construction Worker Fall Accidents
Huang, X., & Hinze, J. (2003) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2003)129:3(262 · Cited by 405 · cited 2×
“D ow nl oa de d fr om a sc el ib ra ry .o rg b y C ur tin U ni v of T ec hn ol og y 20 09 o n 04 /2 1/ 14 .”
BackgroundSystems Model of Construction Accident Causation
Mitropoulos, P., Abdelhamid, T. S., & Howell, G. A. (2005) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2005)131:7(816 · Cited by 336 · cited 3×
“After eliminating projects that did not report either safety or quality data, there were 18 remaining data points.”
BackgroundResultTaxonomy for change causes and effects in construction projects
Sun, M., & Meng, X. (2009) · International Journal of Project Management · doi:10.1016/j.ijproman.2008.10.005 · Cited by 331 · cited 2×
“One author briefly mentions procurement delay as a cause of rework (Arain et al. 2004), whereas other researchers claim that rework results most often from work changes (Sun and Meng 2009).”
BackgroundViability of Designing for Construction Worker Safety
Gambatese, J., Behm, M., & Hinze, J. (2005) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2005)131:9(1029 · Cited by 319 · cited 3×
“Author keywords: Safety; Quality; Planning; Project management; Labor and personnel issues.”
BackgroundCobb, G. W., Ramsey, F. L., & Schafer, D. W. (2000) · The American Statistician · doi:10.2307/2685617 · Cited by 287 · cited 1×
“, values with high leverage against the regression) as suggested by Ramsey and Schafer (2002). This action reduced the sample size to 18 projects.”
BackgroundVisibility-related fatalities related to construction equipment
Hinze, J. W., & Teizer, J. (2011) · Safety Science · doi:10.1016/j.ssci.2011.01.007 · Cited by 250 · cited 2×
“Author keywords: Safety; Quality; Planning; Project management; Labor and personnel issues.”
BackgroundQuality failure costs in civil engineering projects
Barber, P., Graves, A., Hall, M., et al. (2000) · International Journal of Quality & Reliability Management · doi:10.1108/02656710010298544 · Cited by 213 · cited 1×
“On the basis of a comprehensive literature review, Love (2002) reported several measures of rework, including quality deviations (Burati et al. 1992), nonconformance (Abdul-Rahman 1995), defects (Josephson and Hammarlund 1999), and quality failures (Barber et al. 2000).”
BackgroundDetermining the causal structure of rework influences in construction
LOVE, P. E. D., MANDAL, P., & LI, H. (1999) · Construction Management and Economics · doi:10.1080/014461999371420 · Cited by 211 · cited 1×
“In summary, rework can result from errors, omissions, failures, damage, and change orders throughout the procurement process (Love et al. 1999; Love and Li 2000).”
BackgroundLove, P. E. D., Edwards, D. J., & Irani, Z. (2008) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2008.919677 · Cited by 188 · cited 2×
“Two advanced conceptual models have been established.”
BackgroundSafety-Knowledge Management in American Construction Organizations
Hallowell, M. R. (2011) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000067 · Cited by 175 · cited 2×
“Author keywords: Safety; Quality; Planning; Project management; Labor and personnel issues.”
BackgroundSelf-citationDeterminants of rework in building construction projects
Love, P. E. D., & Edwards, D. J. (2004) · Engineering Construction & Architectural Management · doi:10.1108/09699980410547612 · Cited by 140 · cited 2×
“Love and Edwards (2004a) provide a notable exception, stating that, “It would appear, however, that as rework costs increase, safety is perhaps compromised as the pressure to complete the project on time and to budget increases.”
BackgroundQuality and Safety Management in Construction
Loushine, T. W., Hoonakker, P., Carayon, P., & Smith, M. J. (2006) · Total Quality Management & Business Excellence · doi:10.1080/14783360600750469 · Cited by 99 · cited 3×
“Similarly, Loushine et al. (2004, 2006) found that safety management plans are similar in structure and content to those of successful quality management plans in that they both address proactive management of risks that impact project success.”
BackgroundThe pathology of building defects; a human error approach
Atkinson, A. R. (2002) · Engineering Construction & Architectural Management · doi:10.1046/j.1365-232x.2002.00224.x · Cited by 85
The role of human error in construction defects
Atkinson, A. R. (1999) · International Journal of Building Pathology and Adaptation · doi:10.1108/02630809910303006 · Cited by 83 · cited 2×
“Several of these studies focus on managerial influences (Atkinson 1999) and how latent managerial errors underlie obvious operative errors (Atkinson 2002).”
BackgroundLingard, H. C., Cooke, T., Blismas, N. G., & Wakefield, R. R. (2013) · Built Environment Project and Asset Management · doi:10.1108/bepam-06-2012-0036 · Cited by 56
MacCollum, D. V. (2008) · Cited by 43
Cited by
Factors influencing safety performance on construction projects: A review
Mohammadi, A., Tavakolan, M., & Khosravi, Y. (2018) · Safety Science · doi:10.1016/j.ssci.2018.06.017 · Cited by 301
Structural Equation Model for Evaluating Factors Affecting Quality of Social Infrastructure Projects
Hussain, S., Fangwei, Z., Siddiqi, A. F., Ali, Z., & Shabbir, M. S. (2018) · Sustainability · doi:10.3390/su10051415 · Cited by 245
Exoskeletons for manual material handling – A review and implication for construction applications
Zhu, Z., Dutta, A., & Dai, F. (2021) · Automation in Construction · doi:10.1016/j.autcon.2020.103493 · Cited by 170
Metadata
- Authors
- Wanberg, J., Harper, C., Hallowell, M. R., & Rajendran, S.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2013-10
- Volume
- 139
- Issue
- 10
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- OpenAlex
- W2001022793
- Cited by
- 196
- References
- 25
- FWCI
- 10.92
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.