The DOI matches its Crossref record; 4 of the 4 references it cites were found in a registry or an index.
A Cognitive Model of Construction Workers’ Unsafe Behaviors
Abstract
This paper focuses on construction workers’ unsafe behaviors and develops a cognitive model of construction workers’ unsafe behaviors (CM-CWUB). In the construction industry, many accident investigations reveal that workers’ unsafe behaviors are the most frequent and direct causes of on-site accidents, and thus need to be addressed urgently. Based on cognitive and social psychology theories and existing accident causation models, this paper develops a CM-CWUB by adopting a five-stage form, specifically representing the construction workers’ cognitive processes when confronted with potential hazards on construction sites. Using a cognitive perspective can reveal the mechanism of human error and thus can elucidate how unsafe behaviors are produced. The five stages include obtaining information, understanding information, perceiving responses, selecting response, and taking action, with obtaining information and selecting response as the two key stages. Obtaining information elaborates construction workers’ observations and processing of hazard information on sites by themselves, and selecting response adopts the theory of planned behavior to reflect various factors of influence when workers select unsafe behavior. Based on the developed model, cognitive failures that would lead to construction workers’ unsafe behaviors at different cognitive stages are then systematically analyzed.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
The theory of planned behavior
Ajzen, I. (1991) · Organizational Behavior and Human Decision Processes · doi:10.1016/0749-5978(91)90020-t · Cited by 90,587
Tversky, A., & Kahneman, D. (1974) · Science · doi:10.1126/science.185.4157.1124 · Cited by 28,810
Reason, J. (1990) · doi:10.1017/cbo9781139062367 · Cited by 5,108
Modelling the basic error tendencies of human operators
Reason, J. (1988) · Reliability Engineering & System Safety · doi:10.1016/0951-8320(88)90071-3 · Cited by 53 · cited 1×
“The CM-CWUB adopts the concept of long-term memory (LM) to represent all long-period memory repositories except WM, such as intermediate memory and knowledge base (Posner 1989; Reason 1988).”
Background
Cited by
A science mapping approach based review of construction safety research
Jin, R., Zou, P. X. W., Piroozfar, P., Wood, H., Yang, Y., Yan, L., & Han, Y. (2019) · Safety Science · doi:10.1016/j.ssci.2018.12.006 · Cited by 270
Literature review of digital twins applications in construction workforce safety
Hou, L., Wu, S., Zhang, G. (., Tan, Y., & Wang, X. (2020) · Applied Sciences · doi:10.3390/app11010339 · Cited by 194
Factors leading to unsafe behavior in the twenty first century workplace: a review
Dodoo, J. E., & Al-Samarraie, H. (2019) · Management Review Quarterly · doi:10.1007/s11301-019-00157-6 · Cited by 76
Metadata
- Authors
- Fang, D., Zhao, C., & Zhang, M.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2016-09
- Volume
- 142
- Issue
- 9
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- OpenAlex
- W2297326202
- Cited by
- 247
- References
- 4
- FWCI
- 18.10
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: A Cognitive Model of Construction Workers’ Unsafe Behaviors. https://app.cochat.ai/papers/10.1061/(asce)co.1943-7862.0001118
- The paper
- Fang, D., Zhao, C., & Zhang, M. (2016). A Cognitive Model of Construction Workers’ Unsafe Behaviors. Journal of Construction Engineering and Management. https://doi.org/10.1061/(asce)co.1943-7862.0001118
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.