Impact of Team Integration and Group Cohesion on Project Delivery Performance
The DOI matches its Crossref record; 5 of the 5 references it cites were found in a registry or an index.
Abstract
AbstractThe architecture, engineering, and construction (AEC) industry is often criticized for its fragmented approach to project delivery. Traditional procurement and contracting intentionally serves to isolate designers from contractors to provide checks and balances, but limits opportunities for collaboration. This research presents a structural modeling approach to studying the role of integration in the performance of building construction projects. A sample data set of 204 completed projects was collected to compare cost, schedule, and quality performance under different delivery methods. Integration of project teams was proposed and tested in the form of two latent constructs—team integration and group cohesion—that mediate the link between delivery methods and performance. More integrated teams interacted with more participants from all levels of the building construction process, from designers to specialty trade contractors. These interactions included design charrettes, joint goal setting, and ...
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Hu, L., & Bentler, P. M. (1999) · Structural Equation Modeling A Multidisciplinary Journal · doi:10.1080/10705519909540118 · Cited by 108,788
Social Pressures in Informal Groups
Festinger, L., Schachter, S., & Back, K. (1950) · The American Catholic Sociological Review · doi:10.2307/3707362 · Cited by 1,831
A comparison of some methodologies for the factor analysis of non‐normal Likert variables
Muthén, B., & Kaplan, D. (1985) · British Journal of Mathematical and Statistical Psychology · doi:10.1111/j.2044-8317.1985.tb00832.x · Cited by 1,778
The relation between group cohesiveness and performance: An integration.
Mullen, B., & Copper, C. (1994) · Psychological Bulletin · doi:10.1037/0033-2909.115.2.210 · Cited by 1,398
(2011) · doi:10.1061/(asce)co.1943-7862.0000161 · Cited by 181
Cited by
Collaboration in BIM-based construction networks: A bibliometric-qualitative literature review
Oraee, M., Hosseini, M. R., Papadonikolaki, E., Palliyaguru, R., & Arashpour, M. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.07.001 · Cited by 415
Tukamuhabwa, B. R., Mutebi, H., Akandwanaho, E., Kabagambe, L., & Tumukunde, I. (2023) · Cogent Business & Management · doi:10.1080/23311975.2023.2263994 · Cited by 8
“Franz et al. (2017) stressed that the common indicators of project performance can be categorized into three dimensions: the project’s overall performance (time, cost and quality), the project’s multiple goals (risk management, absence of conflicts, claim management) and stakeholder satisfaction.”
Background
Metadata
- Authors
- Franz, B., Leicht, R., Molenaar, K., & Messner, J.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2017-01
- Volume
- 143
- Issue
- 1
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- OpenAlex
- W2478174824
- Cited by
- 185
- References
- 5
- FWCI
- 16.79
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Impact of Team Integration and Group Cohesion on Project Delivery Performance. https://app.cochat.ai/papers/10.1061/(asce)co.1943-7862.0001219
- The paper
- Franz, B., Leicht, R., Molenaar, K., & Messner, J. (2017). Impact of Team Integration and Group Cohesion on Project Delivery Performance. Journal of Construction Engineering and Management. https://doi.org/10.1061/(asce)co.1943-7862.0001219
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.