Public–Private Partnership Risk Factors in Emerging Countries: BOOT Illustrative Case Study
The DOI matches its Crossref record.
Abstract
A public–private partnership (PPP) is an agreement between a host government and a private entity in which the private sector supplies infrastructure assets and services that are traditionally provided by the government. The popularity of PPP projects has been steadily on the rise over the past few years. This upward trend is in large part driven by governmental fiscal austerity, particularly in the aftermath of a prolonged global economic recession. The perceived attractiveness of PPP projects is particularly acute in emerging countries because of population growth and increased urbanization. PPP projects are usually highly complex in nature. They require large capital expenditure, they have long durations, and they usually utilize sophisticated technology. For a construction firm willing to expand its services internationally, a PPP project represents a unique opportunity to leverage its core competency and achieve competitive advantage in both domestic and foreign markets. Risk, however, increases with foreign penetration because of unfamiliarity with the geography, the supply chain, the local codes, and the business practices. Using an illustrative case study of a build-own-operate-transfer (BOOT) thermal power plant project, this paper addresses the salient risk factors facing the construction firm undertaking a PPP in an emerging country.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
Ameyaw, E. E., & Chan, A. P. C. (2015) · Expert Systems with Applications · doi:10.1016/j.eswa.2015.02.041 · Cited by 265
Zhao, J., Feng, H., Chen, Q., & Garcia de Soto, B. (2022) · Journal of Building Engineering · doi:10.1016/j.jobe.2022.104028 · Cited by 192
“The same approach has been performed in construction-related studies of a similar nature, such as [53 – 55]; and [56].”
Ashtari, M. A., Ansari, R., Hassannayebi, E., & Jeong, J. (2022) · Buildings · doi:10.3390/buildings12101660 · Cited by 65
Islam, M. S., Nepal, M. P., & Skitmore, M. (2019) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001593 · Cited by 60
Metadata
- Authors
- Rebeiz, K. S.
- Venue
- Journal of Management in Engineering
- Published
- 2012-10
- Volume
- 28
- Issue
- 4
- Pages
- 421-428
- ISSN
- 0742-597X (ISSN-L)
- 1943-5479
- OpenAlex
- W2005141901
- Cited by
- 81
- References
- 0
- FWCI
- 9.54
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Public–Private Partnership Risk Factors in Emerging Countries: BOOT Illustrative Case Study. https://app.cochat.ai/papers/10.1061/(asce)me.1943-5479.0000079
- The paper
- Rebeiz, K. S. (2012). Public–Private Partnership Risk Factors in Emerging Countries: BOOT Illustrative Case Study. Journal of Management in Engineering. https://doi.org/10.1061/(asce)me.1943-5479.0000079
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.