Modified fuzzy group decision-making approach to cost overrun risk assessment of power plant projects
Open accessAbstract
Cost overrun risk assessment in the preliminary stages of a power plant project is laden with subjectivity, uncertainty, imprecision, and the vagueness of expert judgment. Current fuzzy approaches to risk assessment in such projects specifically require improvements in the reliability and aggregation process of experts’ judgments as well as the incorporation of project phase–based risk assessment to comprehend the sources of the risks and their corresponding effects on cost overruns. In response, this study proposes a modified fuzzy group decision-making approach (FGDMA) and assesses cost overrun risks considering different project phases [(1) design and procurement, and (2) construction and commissioning] of the power plant projects of varying types, sizes/capacities, and contracts. The proposed methodology is applied to 10 different project scenarios to better understand the context of project risks and their profile and identify the critical cost overrun risks involved. This study will aid the comprehensive assessment of risks and increase the accuracy of project budgeting and contingency allocation decisions.
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
Fuzzy-AHP and Fuzzy-ANP require many tedious pairwise comparisons.
“However, Fuzzy-AHP and Fuzzy-ANP have similar drawbacks, requiring many tedious pairwise comparisons [40,41].”
From Cost Overrun Risk Assessment and Prediction in Construction Projects: A Bayesian Network Classifier Approach (2022) · cites this paper as [41]
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Cites
(2013) · Cited by 1,331 · see citing works
International energy outlook 1994
USDOE Energy Information Administration, W., & USDOE, W. (1994) · doi:10.2172/10164142 · Cited by 532 · see citing works
Developing a risk assessment model for PPP projects in China — A fuzzy synthetic evaluation approach
Xu, Y., Yeung, J. F. Y., Chan, A. P. C., Chan, D. W. M., Wang, S. Q., & Ke, Y. (2010) · Automation in Construction · doi:10.1016/j.autcon.2010.06.006 · Cited by 431 · see citing works
Using fuzzy risk assessment to rate cost overrun risk in international construction projects
Dikmen, İ., Birgönül, M. T., & Han, S. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.12.002 · Cited by 376 · see citing works
Towards a better modelling and assessment of construction risk: Insights from a literature review
Taroun, A. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.03.004 · Cited by 358 · see citing works
Fuzzy Rule-Based Bayesian Reasoning Approach for Prioritization of Failures in FMEA
Yang, Z. L., Bonsall, S., & Wang, J. (2008) · IEEE Transactions on Reliability · doi:10.1109/tr.2008.928208 · Cited by 350 · see citing works
Risk Management in the Construction Industry Using Combined Fuzzy FMEA and Fuzzy AHP
Abdelgawad, M., & Fayek, A. R. (2010) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000210 · Cited by 343 · see citing works
Combined - Cycle Gas & Steam Turbine Power Plants
Warner, J. J., & Nielsen, H. A. (1999) · Cited by 320 · see citing works
The engineering of knowledge-based systems: theory and practice
González, A. J., & Dankel, D. D. (1993) · Prentice-Hall, Inc eBooks · Cited by 257 · see citing works
Measuring Uncertainty Importance: Investigation and Comparison of Alternative Approaches
Borgonovo, E. (2006) · Risk Analysis · doi:10.1111/j.1539-6924.2006.00806.x · Cited by 257 · see citing works
Eybpoosh, M., Dikmen, I., & Talat Birgonul, M. (2011) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000382 · Cited by 217 · see citing works
Ebrahimnejad, S., Mousavi, S. M., & Seyrafianpour, H. (2009) · Expert Systems with Applications · doi:10.1016/j.eswa.2009.05.037 · Cited by 180 · see citing works
A SURVEY OF THE FACTORS AFFECTING THE PRODUCTIVITY OF CONSTRUCTION PROJECTS IN IRAN
Ghoddousi, P., & Hosseini, M. R. (2012) · Technological and Economic Development of Economy · doi:10.3846/20294913.2012.661203 · Cited by 175 · see citing works
Analysis of pre‐qualification criteria in contractor selection and their impacts on project success
Doloi, H. K. (2009) · Construction Management and Economics · doi:10.1080/01446190903394541 · Cited by 170 · see citing works
A fuzzy Bayesian belief network for safety assessment of oil and gas pipelines
Kabir, G., Sadiq, R., & Tesfamariam, S. (2015) · Structure and Infrastructure Engineering · doi:10.1080/15732479.2015.1053093 · Cited by 168 · see citing works
Ji, Y., Huang, G., & Sun, W. (2014) · Expert Systems with Applications · doi:10.1016/j.eswa.2014.12.026 · Cited by 165 · see citing works
Islam, M. S., Nepal, M. P., Skitmore, M., & Attarzadeh, M. (2017) · Advanced Engineering Informatics · doi:10.1016/j.aei.2017.06.001 · Cited by 163 · see citing works
Self-citationEbrahimnejad, S., Mousavi, S. M., Tavakkoli-Moghaddam, R., Hashemi, H., & Vahdani, B. (2012) · Applied Mathematical Modelling · doi:10.1016/j.apm.2011.11.050 · Cited by 156 · see citing works
Hossen, M. M., Kang, S.-K., & Kim, J. (2015) · Nuclear Engineering and Technology · doi:10.1016/j.net.2014.12.019 · Cited by 137 · see citing works
Mokhtari, K., Ren, J., Roberts, C., & Wang, J. (2011) · Expert Systems with Applications · doi:10.1016/j.eswa.2011.11.030 · Cited by 136 · see citing works
A fuzzy analytic network process model to mitigate the risks associated with offshore wind farms
Shafiee, M. (2014) · Expert Systems with Applications · doi:10.1016/j.eswa.2014.10.019 · Cited by 135 · see citing works
Dynamic modeling of the quantitative risk allocation in construction projects
Nasirzadeh, F., Khanzadi, M., & Rezaie, M. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.06.002 · Cited by 127 · see citing works
Rethinking construction cost overruns: cognition, learning and estimation
Ahiaga-Dagbui, D. D., & Smith, S. D. (2014) · Journal of Financial Management of Property and Construction · doi:10.1108/jfmpc-06-2013-0027 · Cited by 114 · see citing works
Construction Cost Overruns and Electricity Infrastructure: An Unavoidable Risk?
Sovacool, B. K., Nugent, D., & Gilbert, A. Q. (2014) · The Electricity Journal · doi:10.1016/j.tej.2014.03.015 · Cited by 104 · see citing works
Comment on Cooke's classical method
Clemen, R. T. (2008) · Reliability Engineering & System Safety · doi:10.1016/j.ress.2008.02.003 · Cited by 99 · see citing works
Case study of government initiatives for PRC's BOT power plant project
Wang, S. Q., & Tiong, L. K. (2000) · International Journal of Project Management · doi:10.1016/s0263-7863(98)00072-6 · Cited by 99 · see citing works
Impact of Design Risk on the Performance of Design-Build Projects
Liu, J., Xie, Q., Xia, B., & Bridge, A. (2017) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001299 · Cited by 72 · see citing works
Ameyaw, E. E., Chan, A. P. C., Owusu‐Manu, D., & Coleman, E. (2015) · Journal of Facilities Management · doi:10.1108/jfm-11-2013-0055 · Cited by 67 · see citing works
Reasoning about mathematical fuzzy logic and its future
Novák, V. (2010) · Fuzzy Sets and Systems · doi:10.1016/j.fss.2010.09.019 · Cited by 66 · see citing works
Cost overruns and financial risk in the construction of nuclear power reactors: A critical appraisal
Gilbert, A. Q., Sovacool, B. K., Johnstone, P., et al. (2016) · Energy Policy · doi:10.1016/j.enpol.2016.04.001 · Cited by 66 · see citing works
Critical Factors Determining Bid/No Bid Decisions of Contractors in Qatar
Jarkas, A. M., Mubarak, S., & Kadri, C. Y. (2013) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000223 · Cited by 60 · see citing works
Risk assessment of river-type hydropower plants using fuzzy logic approach
Küçükali, S. (2011) · Energy Policy · doi:10.1016/j.enpol.2011.06.067 · Cited by 58 · see citing works
Zhao, H., & Li, N. (2015) · Sustainability · doi:10.3390/su7032885 · Cited by 51 · see citing works
Jung, J. H., Kim, D. Y., & Lee, H. K. (2015) · KSCE Journal of Civil Engineering · doi:10.1007/s12205-015-0184-8 · Cited by 50 · see citing works
Power Plant Project Risk Assessment Using a Fuzzy-Anp and Fuzzy-Topsis Method
Zegordi, S. H. (2012) · International Journal of Engineering · doi:10.5829/idosi.ije.2012.25.02b.04 · Cited by 49 · see citing works
Risk scorecard concept in wind energy projects: An integrated approach
Küçükali, S. (2015) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2015.12.017 · Cited by 40 · see citing works
Comprehensive review of delays in power transmission projects
Pall, G. K., Bridge, A., Skitmore, M., et al. (2016) · IET Generation Transmission & Distribution · doi:10.1049/iet-gtd.2016.0376 · Cited by 36 · see citing works
Self-citationAZNAR, B., Pellicer, E., Davis, S., et al. (2017) · Journal of Civil Engineering and Management · doi:10.3846/13923730.2017.1341955 · Cited by 33 · see citing works
JUDGMENT-BASED CROSS-IMPACT METHOD FOR PREDICTING COST VARIANCE FOR HIGHLY UNCERTAIN PROJECTS
Han, S. H., & Diekmann, J. E. (2004) · Journal of Restructuring Finance · doi:10.1142/s1609945104000139 · Cited by 31 · see citing works
Lifecycle cost risk analysis for infrastructure projects with modified Bayesian networks
Xia, N., Wang, X., Wang, Y., et al. (2017) · Journal of Engineering Design and Technology · doi:10.1108/jedt-05-2015-0033 · Cited by 29 · see citing works
Kim, M. G., IkHaeng, L., & Jung, Y. (2017) · Sustainability · doi:10.3390/su9030469 · Cited by 29 · see citing works
Tavakkoli-Moghaddam, R. R., Mousavi, S. M., & Hashemi, H. (2011) · InTech eBooks · doi:10.5772/16247 · Cited by 26 · see citing works
Construction Claim Types and Causes for a Large-Scale Hydropower Project in Bhutan
Hadikusumo, B. H. W., & Tobgay, S. (2015) · Universiti Sains Malaysia Institutional Repository (Universiti Sains Malaysia) · Cited by 21 · see citing works
Development of a computerized risk management system for international NPP EPC projects
Yoo, W. S., Yang, J., Kang, S., et al. (2016) · KSCE Journal of Civil Engineering · doi:10.1007/s12205-016-0784-y · Cited by 18 · see citing works
A Fuzzy Risk Management Framework for the Egyptian Real Estate Development Projects
Aboshady, A. M., Elbarkouky, M. M. G., & Marzouk, M. M. (2013) · doi:10.1061/9780784412909.033 · Cited by 14 · see citing works
From state to market and back again: Egypt's experiment with independent power projects
Eberhard, A. A., & Gratwick, K. N. (2006) · Energy · doi:10.1016/j.energy.2006.05.003 · Cited by 11 · see citing works
Project Risk Management in Hydropower Plant Projects
Sudirman, W. B., & Hardjomuljadi, S. (2011) · Journal of Infrastructure Development · doi:10.1177/097493061100300205 · Cited by 11 · see citing works
Flagged first, then by citations
Research works printed but not linked: 1
- Cooke, R. (1991). Experts in Uncertainty: Opinions and Subjective Probability in Science. Oxford University Press on Demand.
Cited by
Sorted by citations
Ashtari, M. A., Ansari, R., Hassannayebi, E., & Jeong, J. (2022) · Buildings · doi:10.3390/buildings12101660 · Cited by 65 · see citing works
- Authors
- Islam, M. S., Nepal, M. P., & Skitmore, M.
- Affiliations
- Queensland University of Technology (AU)
- Corresponding author
- Nepal, Madhav P.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2019-02
- Volume
- 145
- Issue
- 2
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- OpenAlex
- W2902291314
- Cited by
- 60
- References
- 51
- Citations by year
- 2026: 6 · 2025: 3 · 2024: 9 · 2023: 9 · 2022: 15 · 2021: 8 · 2020: 7 · 2019: 3
- FWCI
- 3.59
- Type
- journal article
- Language
- en
- Open access
- green
- eprints.qut.edu.au
- Licence
- other-oa
- Locations
- Journal of Construction Engineering and Management (publishedVersion)
- QUT ePrints (Queensland University of Technology) (submittedVersion, other-oa)
- Figshare (submittedVersion, cc-by)
- Topics
- Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
- Social Sciences › Decision Sciences › Management Science and Operations Research › Multi-Criteria Decision Making
- Social Sciences › Economics, Econometrics and Finance › Finance › Capital Investment and Risk Analysis
- Keywords
- power plant projects, fuzzy group decision making, risk assessment, project phases, expert judgment aggregation, project cost management
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review