Developing Key Performance Indicators for Public-Private Partnership Projects: Questionnaire Survey and Analysis
The DOI matches its Crossref record; 27 of the 27 references it cites were found in a registry or an index.
Abstract
Public-private partnerships (PPPs) are increasing in popularity. Major challenges in the development of PPPs have resulted from the global financial crisis. However, with respect to their monetary value, PPPs are still an attractive option for public sector projects. Performance management and measurement, in which Key Performance Indicators (KPIs) are the core elements, viewed as effective methods to help PPPs deliver value for money. This article describes in greater detail a KPI conceptual model composed of 5 performance packages and 48 indicators developed by the authors in previous studies. A structured questionnaire survey explored PPP stakeholders perceptions of 48 project performance indicators (PIs) to identify actual KPIs for performance management and measurement in PPPs. Although the survey results show that all PIs are important, performance packages contribute differently to the overall project performance. A confirmatory factor analysis (CFA) was used to test whether the proposed conceptual model fit the observed set of collected data in a predictable way, and to further consolidate the KPIs. The improved KPI model uses 41 PIs, which indicate that performance improvement within PPP projects is strongly influenced by reasonable procurement, design and planning in the public sector, effective process control in the private sector, and the ultimate satisfaction of both the public and private sectors. These 41 KPIs can be used to identify strengths and weaknesses of PPP projects and improve effective performance management and measurement in PPPs.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Review of Psychometric theory (2nd ed.).
SITGREAVES, R. (1979) · Contemporary Psychology: A Journal of Reviews · doi:10.1037/018882 · Cited by 11,425
Reporting Structural Equation Modeling and Confirmatory Factor Analysis Results: A Review
Schreiber, J. B., Nora, A., Stage, F. K., Barlow, E. A., & King, J. (2006) · The Journal of Educational Research · doi:10.3200/joer.99.6.323-338 · Cited by 6,937
The “real” success factors on projects
Cooke-Davies, T. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(01)00067-9 · Cited by 1,837 · cited 1×
“Despite the simplistic nature of PMM as depicted in prior research by the iron triangle (Cooke-Davies 2002), many scholars have agreed that performance measurement can no longer be restricted to the traditional indicators which include time, cost, and quality (Low and Chuan 2006).”
MethodResearch Design in Social Research
de Vaus, D. (2001) · Medical Entomology and Zoology · Cited by 1,111
Evaluating the risks of public private partnerships for infrastructure projects
Grimsey, D., & Lewis, M. K. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(00)00040-5 · Cited by 964 · cited 1×
“Risk-based decision methods (Grimsey and Lewis 2002; Ke et al. 2010), procurement methods (Lam and Chow 1999; Kumaraswamy and Morris 2002), concession-related issues (Shen and Wu 2005; Ng et al.”
MethodResearch design in social research
Tierney, A. J. (2002) · International Journal of Nursing Studies · doi:10.1016/s0020-7489(01)00040-2 · Cited by 774
Critical Success Factors for Public–Private Partnerships in Infrastructure Development
Zhang, X. (2005) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2005)131:1(3 · Cited by 748 · cited 2×
“70 recommended in Nunnally’s (1978) guideline and Zhang’s (2006) similar research, which suggest that, in the early stages of research on predictive tests or hypothesized measures of a construct, reliability of 0.”
BackgroundPerformance management in construction: a conceptual framework
Kagioglou, M., Cooper, R., & Aouad, G. F. (2001) · Construction Management and Economics · doi:10.1080/01446190010003425 · Cited by 605 · cited 2×
“Project measurement and management has been introduced as an effective tool for management of construction projects (Kagioglou et al. 2001).”
BackgroundMethodTowards a Comprehensive Understanding of Public Private Partnerships for Infrastructure Development
Kwak, Y. H., Chih, Y., & Ibbs, C. W. (2009) · California Management Review · doi:10.2307/41166480 · Cited by 582
Public–private partnerships: Perspectives on purposes, publicness, and good governance
Brinkerhoff, D. W., & Brinkerhoff, J. M. (2011) · Public Administration and Development · doi:10.1002/pad.584 · Cited by 569 · cited 1×
“2010), governance (Brinkerhoff and Brinkerhoff 2011), and strategic infrastructure development (Kwak 2009).”
Background
Cited by
Life Cycle Critical Success Factors for Public-Private Partnership Infrastructure Projects
Liu, J., Love, P. E. D., Smith, J., Regan, M., & Davis, P. R. (2015) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000307 · Cited by 201
Ahmadabadi, A. A., & Heravi, G. (2019) · Transport Policy · doi:10.1016/j.tranpol.2018.07.004 · Cited by 166
Green finance for green buildings: A systematic review and conceptual foundation
Akomea-Frimpong, I., Kukah, A. S., Jin, X., Osei-Kyei, R., & Pariafsai, F. (2022) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2022.131869 · Cited by 160
Metadata
- Authors
- Yuan, J., Wang, C., Skibniewski, M. J., & Li, Q.
- Venue
- Journal of Management in Engineering
- Published
- 2012-07
- Volume
- 28
- Issue
- 3
- Pages
- 252-264
- ISSN
- 0742-597X (ISSN-L)
- 1943-5479
- OpenAlex
- W2158412430
- Cited by
- 164
- References
- 27
- FWCI
- 13.79
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.