The effect of critical success factors on project success in Public-Private Partnership projects: A case study of highway projects in Iran
The DOI matches its Crossref record; 7 of the 7 references it cites were found in a registry or an index.
Abstract
Abstract Public-Private Partnership (PPP) has been promoted as an alternative procurement method to provide public services. In recent years, several studies have been carried out in order to identify and assess the critical success factors (CSFs) of PPP projects. However, the interrelation between success criteria (SC) and CSFs in PPP projects has not received attention from researchers. To fill this gap, this paper intended to evaluate the effects of CSFs on the success of PPP projects using PLS-SEM. To this end, SC were monitored throughout construction, operation, and final transfer stages, whereas CSFs were taken into account during the procurement stage of the PPP project. Then, based on an opinion survey in Iran, the effects of CSFs on the success of PPP projects were evaluated based on the developed PLS-SEM model. Moreover, in order to validate the proposed model, two national highway projects in Iran were studied in detail. The results confirmed the effect of CSF on project success and showed that private sector capability has a direct effect on project success during the construction period and government capability is very effective during the project operation stage. In addition, investigating the case studies with respect to the introduced model indicated that a transparent bidding process, risk allocation, and good partnering are among the CSFs in PPP projects in developing countries.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Pls-Sem: indeed a silver bullet
Hair, J. F., Ringle, C. M., & Sarstedt, M. (2011) · Journal of Marketing Theory and Practice · doi:10.2753/mtp1069-6679190202 · Cited by 21,631
A primer on partial least squares structural equation modeling (PLS-SEM)
Leguina, A. (2015) · International Journal of Research & Method in Education · doi:10.1080/1743727x.2015.1005806 · Cited by 18,921
Minimum sample size estimation in PLS‐SEM: The inverse square root and gamma‐exponential methods
Kock, N., & Hadaya, P. (2018) · Information Systems Journal · doi:10.1111/isj.12131 · Cited by 2,621
Atkinson, R. (1999) · International Journal of Project Management · doi:10.1016/s0263-7863(98)00069-6 · Cited by 2,359
Partial Least Squares: The Better Approach to Structural Equation Modeling?
Hair, J. F., Ringle, C. M., & Sarstedt, M. (2012) · Long Range Planning · doi:10.1016/j.lrp.2012.09.011 · Cited by 855
Eybpoosh, M., Dikmen, I., & Talat Birgonul, M. (2011) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000382 · Cited by 217
Risk paths in international construction projects: Case study from Chinese contractors
Liu, J., Zhao, X., & Yan, P. (2016) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001116 · Cited by 203
Metadata
- Authors
- Ahmadabadi, A. A., & Heravi, G.
- Venue
- Transport Policy
- Publisher
- Elsevier BV
- Published
- 2019-01
- Volume
- 73
- Pages
- 152-161
- ISSN
- 0967-070X (ISSN-L)
- OpenAlex
- W2883498864
- Cited by
- 166
- References
- 7
- FWCI
- 20.95
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: The effect of critical success factors on project success in Public-Private Partnership projects: A case study of highway projects in Iran. https://app.cochat.ai/papers/10.1016/j.tranpol.2018.07.004
- The paper
- Ahmadabadi, A. A., & Heravi, G. (2019). The effect of critical success factors on project success in Public-Private Partnership projects: A case study of highway projects in Iran. Transport Policy. https://doi.org/10.1016/j.tranpol.2018.07.004
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.