Factors Influencing Construction Labor Productivity in Egypt
The DOI matches its Crossref record; 12 of the 12 references it cites were found in a registry or an index.
Abstract
Construction is a labor-intensive industry. Therefore, construction labor productivity is of critical importance to the profitability of most construction projects. Many construction industry sectors have been experiencing chronic problems such as poor management, inferior working conditions, and insufficient quality. Many researchers have identified these problems as factors that affect construction productivity and will affect a company’s performance and the overall economy of the country. This paper aims to identify, investigate, and rank factors perceived to affect construction labor productivity in the Egyptian construction context with respect to their relative importance. To achieve this objective, practitioners and experts comprising a statistically representative sample were invited to participate in a structured questionnaire survey. The questionnaire comprised 30 productivity factors that were classified under the following three primary categories: (1) human/labor, (2) industrial, and (3) management. The management category was ranked first, followed by the labor category and the industrial category. This study revealed that the following five factors, ranked in descending order, are the most significant in their effects on construction labor productivity in Egypt: (1) labor experience and skills; (2) incentive programs; (3) availability of the material and ease of handling; (4) leadership and competency of construction management; and (5) competency of labor supervision. Industry practitioners and researchers can use the primary outcomes of this study in developing systems to enhance and improve construction labor productivity in Egypt. Also, this paper can serve as a guide for contractors and construction managers for the effective management of construction labor forces and help to achieve a competitive level of quality and a cost-effective project.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Probability and statistical inference
(2008) · Choice Reviews Online · doi:10.5860/choice.45-6219 · Cited by 873
Factors Affecting Construction Labor Productivity in Kuwait
Jarkas, A. M., & Bitar, C. G. (2011) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000501 · Cited by 433
FACTORS AFFECTING LABOUR PRODUCTIVITY IN BUILDING PROJECTS IN THE GAZA STRIP
Enshassi, A., Mohamed, S., & Mayer, P. (2007) · Journal of Civil Engineering and Management · doi:10.3846/13923730.2007.9636444 · Cited by 325
Construction productivity: Issues encountered by contractors in Singapore
Lim, E., & Alum, J. (1995) · International Journal of Project Management · doi:10.1016/0263-7863(95)95704-h · Cited by 294
FACTORS AFFECTING THE PRODUCTIVITY OF BUILDING CRAFTSMEN ‐ STUDIES OF UGANDA
Alinaitwe, H. M., Mwakali, J. A., & Hansson, B. (2007) · Journal of Civil Engineering and Management · doi:10.3846/13923730.2007.9636434 · Cited by 240
FACTORS AFFECTING LABOUR PRODUCTIVITY IN BUILDING PROJECTS IN THE GAZA STRIP
Enshassi, A., Mohamed, S., Mustafa, Z. A., & Mayer, P. (2007) · doi:10.1080/13923730.2007.9636444 · Cited by 231
Durdyev, S., & Mbachu, J. (2011) · Construction Economics and Building · doi:10.5130/ajceb.v11i3.2120 · Cited by 211
Work Flow Variation and Labor Productivity: Case Study
Liu, M., Ballard, G., & Ibbs, W. (2010) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000056 · Cited by 171
A survey of constraints on Iranian construction operatives' productivity
Zakeri, M., Olomolaiye, P. O., Holt, G. D., & HARRIS, F. C. (1996) · Construction Management and Economics · doi:10.1080/014461996373287 · Cited by 130
Critical factors influencing construction productivity in Thailand
Makulsawatudom, A., & Emsley, M. W. (2002) · Research Explorer (The University of Manchester) · Cited by 126
Cited by
Li, X., Chow, K. H., Zhu, Y., & Lin, Y. (2016) · Building and Environment · doi:10.1016/j.buildenv.2015.09.005 · Cited by 211
Exploring the Factors Affecting Sustainable Human Resource Productivity in Railway Lines
Azizi, N., Akhavan, P., Philsoophian, M., Davison, C., Haass, O., & Saremi, S. (2021) · Sustainability · doi:10.3390/su14010225 · Cited by 19
“Respect for each other El-Gohary and Aziz [56]; Dai et al.”
Background
Metadata
- Authors
- El-Gohary, K. M., & Aziz, R. F.
- Venue
- Journal of Management in Engineering
- Published
- 2014-01
- Volume
- 30
- Issue
- 1
- Pages
- 1-9
- ISSN
- 0742-597X (ISSN-L)
- 1943-5479
- OpenAlex
- W2153635214
- Cited by
- 343
- References
- 12
- FWCI
- 17.23
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Factors Influencing Construction Labor Productivity in Egypt. https://app.cochat.ai/papers/10.1061/(asce)me.1943-5479.0000168
- The paper
- El-Gohary, K. M., & Aziz, R. F. (2014). Factors Influencing Construction Labor Productivity in Egypt. Journal of Management in Engineering. https://doi.org/10.1061/(asce)me.1943-5479.0000168
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.