The DOI matches its Crossref record.
From Construction Megaproject Management to Complex Project Management: Bibliographic Analysis
Abstract
The rapid growth of construction megaprojects worldwide has triggered a growing number of papers published in this area in the past two decades, suggesting that construction megaproject management has become an emerging area in the field of construction engineering and management (CEM). This study aims to investigate the status and the trends in megaproject research by conducting a structured literature review. A total of 85 relevant articles identified from eight peer-reviewed CEM journals between 2000 and 2010 were analyzed based on the number of articles published annually, institutional and regional contributions, citations, and categorization of research interests and methodologies. Analysis results indicated that developed countries, such as the United Kingdom, the United States, and Australia, have enjoyed significant advantages in megaproject research because of their greater experience, while megaproject research in developing countries, such as Russia, India, Turkey, and Vietnam, remains weak or lacking. These results also revealed that many theory-based findings have been reported in five subareas; namely, construction and site management, cost and schedule management, risk analysis and management, innovation and utilization of information technology, and leadership and professional development. The subareas of organization and stakeholder management, project planning and procurement, and project monitoring and control remain to be promising domains for future research, particularly in developing countries which have yet to develop a research tradition. Incorporating the complexity theory and institutional theory as the theoretical foundation in these subareas can develop megaproject research further through strengthened global collaboration in the future.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
Zheng, X., Le, Y., Chan, A. P. C., Hu, Y., & Li, Y. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.06.005 · Cited by 329
Self-citationSankaran, S., Müller, R., & Drouin, N. (2020) · Systems Research and Behavioral Science · doi:10.1002/sres.2744 · Cited by 35
Halder, A. (2024) · Innovative Infrastructure Solutions · doi:10.1007/s41062-024-01521-6 · Cited by 10
Metadata
- Authors
- Hu, Y., Chan, A. P. C., Le, Y., & Jin, R.-Z.
- Venue
- Journal of Management in Engineering
- Published
- 2015-07
- Volume
- 31
- Issue
- 4
- ISSN
- 0742-597X (ISSN-L)
- 1943-5479
- OpenAlex
- W1996145333
- Cited by
- 221
- References
- 0
- FWCI
- 6.80
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: From Construction Megaproject Management to Complex Project Management: Bibliographic Analysis. https://app.cochat.ai/papers/10.1061/(asce)me.1943-5479.0000254
- The paper
- Hu, Y., Chan, A. P. C., Le, Y., & Jin, R.-Z. (2015). From Construction Megaproject Management to Complex Project Management: Bibliographic Analysis. Journal of Management in Engineering. https://doi.org/10.1061/(asce)me.1943-5479.0000254
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.