Risk Assessment and Allocation in Highway Construction Projects in the UAE
The DOI matches its Crossref record; 30 of the 30 references it cites were found in a registry or an index.
Abstract
Highway construction projects carry substantial risks. This paper highlights the risks associated with highway construction projects in the United Arab Emirates (UAE). Thirty-three risks are identified through detailed literature review. A questionnaire is then developed to solicit the opinion of construction professionals as to the probability and impact of those risks in addition to their proper allocation. Fifty-one surveys were completed and used in the analysis. The priority of each risk is calculated by multiplying the probability with the impact for each risk. The priority helps identify the most significant risks. The relative importance index (RII) for the risk priority is calculated based on all responses for each risk. The most significant risks include inefficient planning, unexpected ground utilities, quality and integrity of design, delays in approvals, and delays in expropriations. Internal project risks are found to be more significant than external risks. Contractors and consultants are in agreement on the risk rankings. Recommended allocation of risks is also presented. This research assists project managers to better estimate risks prior to the commencement of a project and allows them to develop proper mitigation measures at an early stage of a project.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
A Guide to the project management body of knowledge
(1996) · Choice Reviews Online · doi:10.5860/choice.34-1636 · Cited by 4,339
Causes of construction delay: traditional contracts
Odeh, A. M., & Battaineh, H. T. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(00)00037-5 · Cited by 810
Risk assessment and allocation in the UAE construction industry
El-Sayegh, S. M. (2008) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.07.004 · Cited by 468
Self-citationManaging Risk in Construction Projects
Smith, N. J. T., Merna, T., & Jobling, P. E. (1998) · Cited by 425
Statistics, Probability and Reliability for Civil and Environmental Engineers
Kottegoda, N. T., & Rosso, R. (1997) · Virtual Community of Pathological Anatomy (University of Castilla La Mancha) · Cited by 413
Empirical Study of Risk Assessment and Allocation of Public-Private Partnership Projects in China
Chan, A. P. C., Yeung, J. F. Y., Yu, C. C. P., Wang, S. Q., & Ke, Y. (2010) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000049 · Cited by 335
Assessing risk and uncertainty inherent in Chinese highway projects using AHP
Zayed, T., Amer, M., & Pan, J. (2008) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.05.012 · Cited by 322
ICRAM-1: Model for International Construction Risk Assessment
Hastak, M., & Shaked, A. (2000) · Journal of Management in Engineering · doi:10.1061/(asce)0742-597x(2000)16:1(59 · Cited by 285
1 Risks, Contracts and Private Sector Participation in Infrastructure
(2010) · Cited by 250
Risk and its management in the Kuwaiti construction industry: a contractors’ perspective
Kartam, N. A., & Kartam, S. A. (2001) · International Journal of Project Management · doi:10.1016/s0263-7863(00)00014-4 · Cited by 249
Cited by
A critical review of 3D printing in construction: benefits, challenges, and risks
El-Sayegh, S., Romdhane, L., & Manjikian, S. (2020) · Archives of Civil and Mechanical Engineering · doi:10.1007/s43452-020-00038-w · Cited by 387
Self-citationThe cost performance and causes of overruns in infrastructure development projects in Asia
Andrić, J. M., Mahamadu, A.-M., Wang, J., Zou, P. X. W., & Zhong, R. (2019) · Journal of Civil Engineering and Management · doi:10.3846/jcem.2019.8646 · Cited by 61
Metadata
- Authors
- El-Sayegh, S. M., & Mansour, M. H.
- Venue
- Journal of Management in Engineering
- Published
- 2015-11
- Volume
- 31
- Issue
- 6
- ISSN
- 0742-597X (ISSN-L)
- 1943-5479
- OpenAlex
- W2089446104
- Cited by
- 236
- References
- 30
- FWCI
- 18.70
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Risk Assessment and Allocation in Highway Construction Projects in the UAE. https://app.cochat.ai/papers/10.1061/(asce)me.1943-5479.0000365
- The paper
- El-Sayegh, S. M., & Mansour, M. H. (2015). Risk Assessment and Allocation in Highway Construction Projects in the UAE. Journal of Management in Engineering. https://doi.org/10.1061/(asce)me.1943-5479.0000365
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.