Dynamic Modeling for Analyzing Impacts of Skilled Labor Shortage on Construction Project Management
The DOI matches its Crossref record; 14 of the 14 references it cites were found in a registry or an index.
Abstract
In recent years, the shortage in skilled labor was one of the most significant concerns for the construction industry. Previous studies explored the causes and effects of such shortages; however, these efforts featured limited documentation and implemented subjective methods for analysis. This phenomenon is very complex and dynamically responds to the labor market's behavior and its influence on construction projects. The main goal of this study is to provide a simulation-based method for analyzing the causes and impacts of skilled labor shortages. By adopting a system dynamics (SD) approach, an integrated SD model was developed to explain the dynamic interrelationships between the causes and effects of the skilled labor shortage in construction projects. A total of five scenarios were established to simulate shortages and construction project behaviors. Based on statistical regression and sensitivity analysis, this study contributes to a better understanding of the patterns among the causes of shortages, the shortages themselves, and their impacts on labor wages, cost overruns, and scheduling concerns in construction projects.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
(2000) · University of Maribor digital library (University of Maribor) · Cited by 9,354
System Dynamics Modeling: Tools for Learning in a Complex World
Sterman, J. D. (2001) · California Management Review · doi:10.2307/41166098 · Cited by 1,216
Regression Methods in Biostatistics: Linear, Logistic, Survival, and Repeated Measures Models
Lyles, R. H. (2006) · Journal of the American Statistical Association · doi:10.1198/jasa.2006.s90 · Cited by 776
Factors influencing construction time and cost overruns on high-rise projects in Indonesia
Kaming, P. F., Olomolaiye, P. O., Holt, G. D., & Harris, F. C. (1997) · Construction Management and Economics · doi:10.1080/014461997373132 · Cited by 698
Supplying urban ecosystem services through multifunctional green infrastructure in the United States
Lovell, S. T., & Taylor, J. R. (2013) · Landscape Ecology · doi:10.1007/s10980-013-9912-y · Cited by 695
Misperceptions of feedback in dynamic decision making
Sterman, J. D. (1989) · Organizational Behavior and Human Decision Processes · doi:10.1016/0749-5978(89)90041-1 · Cited by 595
Integrating system dynamics and fuzzy logic modeling to determine concession period in BOT projects
Khanzadi, M., Nasirzadeh, F., & Alipour, M. (2011) · Automation in Construction · doi:10.1016/j.autcon.2011.09.015 · Cited by 102
Dainty, A., Ison, S., & Root, D. S. (2004) · Engineering Construction & Architectural Management · doi:10.1108/09699980410547621 · Cited by 98
The construction labour market skills crisis: the perspective of small–medium‐sized firms
Dainty, A., Ison, S., & Briscoe, G. H. (2005) · Construction Management and Economics · doi:10.1080/0144619042000326738 · Cited by 66
Can occupational labor shortages be identified using available data
Veneri, C. M. (1999) · Monthly labor review · Cited by 55
Nasir, M. K., & Hadikusumo, B. H. W. (2018) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000666 · Cited by 48
Dynamic Modeling of Workforce Planning for Infrastructure Projects
Sing, M. C. P., Love, P. E. D., Edwards, D. J., & Liu, J. (2016) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000463 · Cited by 48
Sustainable workforce scheduling in construction program management
Flórez, L., Castro‐Lacouture, D., & Medaglia, A. L. (2013) · Journal of the Operational Research Society · doi:10.1057/jors.2012.164 · Cited by 43
Self-citationForecasting the Demand and Supply of Technicians in the Construction Industry
Sing, C.-P., Love, P. E. D., & Tam, C. M. (2014) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000227 · Cited by 23
Cited by
Digital Twins for Construction Sites: Concepts, LoD Definition, and Applications
Zhang, J., Cheng, J. C. P., Chen, W., & Chen, K. (2022) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000948 · Cited by 167
Towards next generation cyber-physical systems and digital twins for construction
Akanmu, A. A., Anumba, C. J., & Ogunseiju, O. O. (2021) · Journal of Information Technology in Construction · doi:10.36680/j.itcon.2021.027 · Cited by 159
“Construction being a labor-intensive sector, is currently suffering from low unemployment and shortages of skilled labor (Kim et al., 2020).”
BackgroundANN-based automated scaffold builder activity recognition through wearable EMG and IMU sensors
Bangaru, S. S., Wang, C., Busam, S. A., & Aghazadeh, F. (2021) · Automation in Construction · doi:10.1016/j.autcon.2021.103653 · Cited by 114
Bangaru, S. S., Wang, C., & Aghazadeh, F. (2020) · Sensors · doi:10.3390/s20185264 · Cited by 58
Predictive analytics approach to evaluate wage inequality in engineering organizations
Jafari, A., Rouhanizadeh, B., Kermanshachi, S., & Murrieum, M. (2020) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000841 · Cited by 24
Metadata
- Authors
- Kim, S., Chang, S., & Castro-Lacouture, D.
- Venue
- Journal of Management in Engineering
- Published
- 2020-01
- Volume
- 36
- Issue
- 1
- ISSN
- 0742-597X (ISSN-L)
- 1943-5479
- OpenAlex
- W2975634467
- Cited by
- 195
- References
- 14
- FWCI
- 13.59
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.