Factors influencing construction time and cost overruns on high-rise projects in Indonesia
Open accessAbstract
Many variables have an impact upon construction time and cost overruns in Indonesia. A questionnaire survey was undertaken of project managers working on high-rise construction projects in two Indonesian cities: Jakarta and Yogyakarta. The variables identified were ranked according to their perceived importance and frequencies of occurrence. Inflationary increases in material cost, inaccurate material estimating and project complexity are the main causes of cost overruns. The predominant causes of delay are design changes, poor labour productivity and inadequate planning. Using factor analysis techniques, delay and cost overrun variables were grouped into factors, and their relationships analysed. Although Indonesia specific, the results reflect construction management problems common to developing countries.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Introduction to Factor Analysis: What It Is and How to Do It.
Harper, D., Kim, J.-O., & Mueller, C. W. (1980) · Contemporary Sociology · doi:10.2307/2066279 · Cited by 1,186
Causes of Delay in Large Building Construction Projects
Assaf, S. A., Al-Khalil, M., & Al-Hazmi, M. (1995) · Journal of Management in Engineering · doi:10.1061/(asce)0742-597x(1995)11:2(45 · Cited by 544
Kinnear, P. R., & Gray, C. D. (1994) · Cited by 522
Causes of delay and cost overruns in Nigerian construction projects
Mansfield, N., Ugwu, O., & Doran, T. (1994) · International Journal of Project Management · doi:10.1016/0263-7863(94)90050-7 · Cited by 457
Morris, P. W. G., & Hough, G. (1987) · UCL Discovery (University College London) · Cited by 300
Causes of High Costs of Construction in Nigeria
Okpala, D. C., & Aniekwu, A. N. (1988) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1988)114:2(233 · Cited by 234
Economic Theory and the Construction Industry
Hillebrandt, P. M. (1974) · Palgrave Macmillan UK eBooks · doi:10.1007/978-1-349-01927-4 · Cited by 231
Cited by
Modelling global risk factors affecting construction cost performance
Baloi, D., & Price, A. D. F. (2003) · International Journal of Project Management · doi:10.1016/s0263-7863(02)00017-0 · Cited by 587
Le-Hoai, L., Lee, Y. D., & Lee, J. Y. (2008) · KSCE Journal of Civil Engineering · doi:10.1007/s12205-008-0367-7 · Cited by 560
Olawale, Y. A., & Sun, M. (2010) · Construction Management and Economics · doi:10.1080/01446191003674519 · Cited by 478
Ugwu, O. O., & Haupt, T. C. (2007) · Building and Environment · doi:10.1016/j.buildenv.2005.10.018 · Cited by 434
Analysis of cost and schedule performance of international development projects
Ahsan, K., & Gunawan, I. (2010) · International Journal of Project Management · doi:10.1016/j.ijproman.2009.03.005 · Cited by 375
Metadata
- Authors
- Kaming, P. F., Olomolaiye, P. O., Holt, G. D., & Harris, F. C.
- Venue
- Construction Management and Economics
- Publisher
- Informa UK Limited
- Published
- 1997-01
- Volume
- 15
- Issue
- 1
- Pages
- 83-94
- ISSN
- 0144-6193 (ISSN-L)
- 1466-433X
- OpenAlex
- W2021459020
- Cited by
- 698
- References
- 7
- FWCI
- 1.93
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Factors influencing construction time and cost overruns on high-rise projects in Indonesia. https://app.cochat.ai/papers/10.1080/014461997373132
- The paper
- Kaming, P. F., Olomolaiye, P. O., Holt, G. D., & Harris, F. C. (1997). Factors influencing construction time and cost overruns on high-rise projects in Indonesia. Construction Management and Economics. https://doi.org/10.1080/014461997373132
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.