Kaizen costing for lean manufacturing: a case study
The DOI matches its Crossref record.
Abstract
In the past decade due to increasing global competition US firms have radically changed their manufacturing practices to improve their competitiveness. In pursuing this goal they have adopted a number of advanced techniques, such as just-in-time, total quality management, lean manufacturing, flexible manufacturing systems, process improvement, and design for manufacturability, to name a few. The objectives of all these programmes have been to reduce cost, improve quality, reduce cycle time, and increase flexibility on the factory floor. Support systems such as finance and cost management, however, have generally not kept pace with the level of corresponding operational changes being implemented. This paper presents a case study of kaizen costing as practised by Boeing Commercial Airplane Company, IRC Division. The purpose of this study is to describe a method used to set kaizen costs which will provide relevant cost data to support lean production decisions that would be useful to practitioners.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
Lean manufacturing: literature review and research issues
Bhamu, J., & Singh Sangwan, K. (2014) · International Journal of Operations & Production Management · doi:10.1108/ijopm-08-2012-0315 · Cited by 983
Hollos, D., Blome, C., & Foerstl, K. (2012) · International Journal of Production Research · doi:10.1080/00207543.2011.582184 · Cited by 396
Butt, J. (2020) · Designs · doi:10.3390/designs4030017 · Cited by 247
“In the former, a useful technique is value-added analysis (VAA) that helps in identifying problems within a process and distinguish the steps into business value-added (BVA), value-added (VA), or non-value-added (NVA) activities [225].”
MethodLeanness assessment using multi-grade fuzzy approach
Vinodh, S., & Chintha, S. K. (2011) · International Journal of Production Research · doi:10.1080/00207540903471494 · Cited by 194
“The seven wastes include overproduction, waiting, transport, inappropriate processing, unnecessary inventory, unnecessary motion and defects (Hines and Rich 1997, Modarress et al. 2005).”
BackgroundJayaram, J., Vickery, S., & Droge, C. (2008) · International Journal of Production Research · doi:10.1080/00207540701429942 · Cited by 186
A literature review of empirical research methodology in lean manufacturing
Vamsi Krishna Jasti, N., & Kodali, R. (2014) · International Journal of Operations & Production Management · doi:10.1108/ijopm-04-2012-0169 · Cited by 178
Huang, H., Lai, M., Kao, M., & Chen, Y. (2012) · Canadian Journal of Administrative Sciences / Revue Canadienne des Sciences de l Administration · doi:10.1002/cjas.1229 · Cited by 48
Cost performance dynamics in lean production leveling
Deif, A. M., & ElMaraghy, H. (2014) · Journal of Manufacturing Systems · doi:10.1016/j.jmsy.2014.05.010 · Cited by 40
Metadata
- Authors
- Modarress, B., Ansari *, A., & Lockwood, D. L.
- Venue
- International Journal of Production Research
- Publisher
- Informa UK Limited
- Published
- 2005-05
- Volume
- 43
- Issue
- 9
- Pages
- 1751-1760
- ISSN
- 0020-7543 (ISSN-L)
- 1366-588X
- OpenAlex
- W2057061859
- Cited by
- 116
- References
- 0
- FWCI
- 7.88
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.