Quantitative models for inventory and production planning in closed-loop supply chains
The DOI matches its Crossref record; 55 of the 55 references it cites were found in a registry or an index.
Abstract
The increased popularity of remanufacturing requires firms to rethink their supply chain systems and explore new avenues for the coordination of forward and reverse supply chains to transform existing supply chain systems into closed-loop supply chain (CLSC) systems. Several issues encountered in remanufacturing create unique operational challenges that must be taken into account in specifying guidelines for inventory and production planning (I&PP) for CLSC systems. These challenges provide a rich context for novel optimisation problems. Consequently, the literature on I&PP for CLSC systems has been growing continually. In this paper, we review the existing quantitative literature on I&PP for CLSC systems. We broadly categorise the present work into deterministic and stochastic problems according to the modelling of demand and return processes. Upon identifying the important relevant modelling parameters that influence the complexity of the underlying models, we provide a comprehensive classification of the current work according to these parameters. In addition, we highlight the solution methodologies used in the literature. Our goals are twofold: to provide a comprehensive exposition of the state-of-art in quantitative models for I&PP for CLSC systems, and to identify new avenues of research in I&PP that will aid in the practical implementation of remanufacturing.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Green supply-chain management: a state-of-the-art literature review
Srivastava, S. K. (2007) · International Journal of Management Reviews · doi:10.1111/j.1468-2370.2007.00202.x · Cited by 3,984 · cited 3×
“…survey papers review the existing work on I&PP for remanufacturing only briefly in the context of broader fields of green supply chain management (Srivastava 2007), environmentally conscious manufacturing management (Güngör and Gupta 1999), a historical account of the evolution of CLSC…”
BackgroundDavidson, G. W., & Crase, D. (1989) · Death Studies · doi:10.1080/07481188908252281 · Cited by 2,848
(2018) · Journal of Business Logistics · doi:10.1002/(issn)2158-1592 · Cited by 2,522
Closed-Loop Supply Chain Models with Product Remanufacturing
Savaskan, R. C., Bhattacharya, S., & Van Wassenhove, L. N. (2004) · Management Science · doi:10.1287/mnsc.1030.0186 · Cited by 2,227 · cited 1×
“These products can be collected efficiently as there are systems and programs in place for the consumers to return such products directly to collection centres or manufacturers (Savaskan et al. 2004).”
BackgroundQuantitative models for reverse logistics: A review
Fleischmann, M., Bloemhof-Ruwaard, J. M., Dekker, R., van der Laan, E., van Nunen, J. A. E. E., & Van Wassenhove, L. N. (1997) · European Journal of Operational Research · doi:10.1016/s0377-2217(97)00230-0 · Cited by 1,902
Going Backwards: Reverse Logistics Trends and Practices
Rogers, D. S., & Tibben‐Lembke, R. S. (1999) · Medical Entomology and Zoology · Cited by 1,648
OR FORUM—The Evolution of Closed-Loop Supply Chain Research
Guide, V. D. R., & Van Wassenhove, L. N. (2009) · Operations Research · doi:10.1287/opre.1080.0628 · Cited by 1,408
Issues in environmentally conscious manufacturing and product recovery: a survey
Gungor, A., & Gupta, S. M. (1999) · Computers & Industrial Engineering · doi:10.1016/s0360-8352(99)00167-9 · Cited by 1,107 · cited 1×
“1999 , Gungor and Gupta 1999 , Guide 2000 , Guide and Van Wassenhove 2003 ) which consists of the FSC coupled with the counterpart RSC.”
BackgroundProduction planning and control for remanufacturing: industry practice and research needs
Guide, V. D. R. (2000) · Journal of Operations Management · doi:10.1016/s0272-6963(00)00034-6 · Cited by 1,098 · cited 5×
“…of used product returns, the location where each used product is returned, the fraction of products that are returned, i.e. quantity of returns, and the fraction of used product returns that are reusable, i.e. quality of returns (Guide et al. 1999, 2000, Guide 2000, Guide and Van Wassenhove 2003).”
BackgroundInfluential(1998) · Journal of Business Logistics · Cited by 960
A characterisation of logistics networks for product recovery
Fleischmann, M., Krikke, H. R., Dekker, R., & Flapper, S. D. P. (2000) · Omega · doi:10.1016/s0305-0483(00)00022-0 · Cited by 786
Developing a Theory of Reverse Logistics
Dowlatshahi, S. (2000) · Interfaces · doi:10.1287/inte.30.3.143.11670 · Cited by 721 · cited 2×
“The remanufacturing industry is a large one that includes many market sectors and provides significant economic, environmental, and societal benefits (Carter and Ellram 1998, Automotive Parts Rebuilders Association 1999, Dowlatshahi 2000, Bartholomew 2002, Parkinson and Thompson 2003).”
BackgroundQuantitative Models for Reverse Logistics
Fleischmann, M. (2001) · Lecture Notes in Economics and Mathematical Systems · doi:10.1007/978-3-642-56691-2 · Cited by 487 · cited 18×
“Continuous review models (Heyman 1977, Muckstadt and Isaac 1981, van der Laan et al. 1996a, b, 1999a, b, van der Laan and Salomon 1997, Yuan and Cheung 1998, Teunter et al. 2000, 2004, Toktay et al. 2000, Fleischmann et al. 2002, Teunter 2002, Bay|nd|r et al. 2003, van der Laan 2003, Aras et al. 2004, Bay|nd|r et al.…”
InfluentialA deterministic inventory model for reparable items
Schrady, D. A. (1967) · Naval Research Logistics Quarterly · doi:10.1002/nav.3800140310 · Cited by 442 · cited 6×
“We provide a summary of the constant demand and return models (Schrady 1967, Nahmias and Rivera 1979, Mabini et al. 1992, Richter 1996a, b, 1997, Richter and Dobos 1999, 2004, Teunter 2001, 2004, Koh et al. 2002, Teunter and van der Laan 2002, Dobos and Richter 2004, Minner and Lindner 2004, Atasu…”
BackgroundMethodInfluentialInventory Management of Remanufacturable Products
Toktay, L. B., Wein, L. M., & Zenios, S. A. (2000) · Management Science · doi:10.1287/mnsc.46.11.1412.12082 · Cited by 434 · cited 16×
“However, refillable containers are also considered (Toktay et al. 2000).”
BackgroundMethodInfluentialSupply-Chain Management for Recoverable Manufacturing Systems
Guide, V. D. R., Jayaraman, V., Srivastava, R., & Benton, W. C. (2000) · Interfaces · doi:10.1287/inte.30.3.125.11656 · Cited by 414 · cited 5×
“…of used product returns, the location where each used product is returned, the fraction of products that are returned, i.e. quantity of returns, and the fraction of used product returns that are reusable, i.e. quality of returns (Guide et al. 1999, 2000, Guide 2000, Guide and Van Wassenhove 2003).”
BackgroundInfluentialInventory Control in Hybrid Systems with Remanufacturing
van der Laan, E., Salomon, M., Dekker, R., & Van Wassenhove, L. (1999) · Management Science · doi:10.1287/mnsc.45.5.733 · Cited by 342
Production planning and inventory control with remanufacturing and disposal
van der Laan, E., & Salomon, M. (1997) · European Journal of Operational Research · doi:10.1016/s0377-2217(97)00108-2 · Cited by 304 · cited 13×
“…2003), 1SP-b (Toktay et al. 2000), 1SP-c (Bay|nd|r et al. 2003), 2SP-c (van der Laan et al. 1996a, b, 1999a, b, Muckstadt and Isaac 1981, van der Laan and Salomon 1997, Teunter et al. 2000, Teunter 2002, van der Laan 2003, Teunter et al. 2004, van der Laan and Teunter 2006, Behret and Korugan…”
BackgroundInfluentialCharacteristics of the research on reverse logistics (1995–2005)
Rubio, S., Mera, A. C., & González, F. J. M. (2006) · International Journal of Production Research · doi:10.1080/00207540600943977 · Cited by 304 · cited 1×
“…and Gupta 1999, Fleischmann 2001, 2003, Dekker and van der Laan 2003, Inderfurth and Teunter 2003, Inderfurth et al. 2004, Minner and Lindner 2004, Teunter and van der Laan 2004, van der Laan et al. 2004, Bostel et al. 2005, Srivastava 2007, Rubio et al. 2008, Guide and Van Wassenhove 2009).”
BackgroundThe Value of Quality Grading in Remanufacturing
Ferguson, M., Guide, V. D., Koca, E., & Souza, G. C. (2009) · Production and Operations Management · doi:10.1111/j.1937-5956.2009.01033.x · Cited by 262
The EOQ repair and waste disposal model with variable setup numbers
Richter, K. (1996) · European Journal of Operational Research · doi:10.1016/0377-2217(95)00276-6 · Cited by 258 · cited 5×
“We provide a summary of the constant demand and return models (Schrady 1967, Nahmias and Rivera 1979, Mabini et al. 1992, Richter 1996a, b, 1997, Richter and Dobos 1999, 2004, Teunter 2001, 2004, Koh et al. 2002, Teunter and van der Laan 2002, Dobos and Richter 2004, Minner and Lindner 2004, Atasu…”
BackgroundMethodInfluentialBusiness Aspects of Closed-Loop Supply Chains
Guide, D., & Daniel, D. (2003) · Lancaster EPrints (Lancaster University) · Cited by 257
Integrating Closed-Loop Supply Chains and Spare-Parts Management at IBM
Fleischmann, M., van Nunen, J. A. E. E., & Gräve, B. (2003) · INFORMS Journal on Applied Analytics · doi:10.1287/inte.33.6.44.25189 · Cited by 234
Supply Chain Management and Reverse Logistics
(2004) · Springer eBooks · doi:10.1007/978-3-540-24815-6 · Cited by 230
The effect of categorizing returned products in remanufacturing
Aras, N., Boyacı, T., & Verter, V. (2004) · IIE Transactions · doi:10.1080/07408170490279561 · Cited by 218 · cited 16×
“…Yuan and Cheung 1998, Teunter et al. 2000, 2004, Toktay et al. 2000, Fleischmann et al. 2002, Teunter 2002, Bay|nd|r et al. 2003, van der Laan 2003, Aras et al. 2004, Bay|nd|r et al. 2005, van der Laan and Teunter 2006, Behret and Korugan 2009) are summarised in Table A.4, whereas periodic review…”
BackgroundInfluentialOptimum Solution Structure for a Repairable Inventory Problem
Simpson, V. P. (1978) · Operations Research · doi:10.1287/opre.26.2.270 · Cited by 202 · cited 12×
“We observe a number of approaches for the modelling of demand and return processes that are generally assumed to be independent (Whisler 1967, Simpson 1978, Inderfurth 1997, Buchanan and Abad 1998, Mahadevan et al. 1999, Heisig and Fleischmann 2001, Teunter and Vlachos 2002, Kiesmüller and Scherer…”
BackgroundInfluentialControlling inventories with stochastic item returns: A basic model
Fleischmann, M., Kuik, R., & Dekker, R. (2002) · European Journal of Operational Research · doi:10.1016/s0377-2217(01)00100-x · Cited by 201 · cited 10×
“…demand is lost (Toktay et al. 2000, Bay|nd|r et al. 2005, Behret and Korugan 2009) or backordered (Muckstadt and Isaac 1981, van der Laan et al. 1996a, b, Yuan and Cheung 1998, van der Laan et al. 1999a, Fleischmann et al. 2002, Bay|nd|r et al. 2003, Teunter et al. 2004, Behret and Korugan 2009).”
BackgroundMethodInfluentialLot-sizing for inventory systems with product recovery
Teunter, R. H. (2004) · Computers & Industrial Engineering · doi:10.1016/j.cie.2004.01.006 · Cited by 201 · cited 6×
“…inventory and production control policy parameters in systems characterised by 2SP-c (Schrady 1967, Nahmias and Rivera 1979, Mabini et al. 1992, Teunter 2001, 2004, Koh et al. 2002, Teunter and van der Laan 2002, Dobos and Richter 2004, Minner and Lindner 2004, Richter and Dobos 2004,…”
BackgroundMethodInfluentialThe newsboy problem with resalable returns: A single period model and case study
Mostard, J., & Teunter, R. (2006) · European Journal of Operational Research · doi:10.1016/j.ejor.2004.04.048 · Cited by 200
Production planning and control for remanufacturing: a state-of-the-art survey
Guide, V. D. R., Jayaraman, V., & Srivastava, R. (1999) · Robotics and Computer-Integrated Manufacturing · doi:10.1016/s0736-5845(99)00020-4 · Cited by 191 · cited 3×
“This need, in turn, has given birth to the concept of a closed-loop supply chain (CLSC) (Corbett and Van Wassenhove 1994, Guide et al. 1999, Güngör and Gupta 1999, Guide 2000, Guide and Van Wassenhove 2003) which consists of the FSC coupled with the counterpart RSC.”
BackgroundMATERIAL PLANNING FOR A REMANUFACTURING FACILITY
FERRER, G., & WHYBARK, D. C. (2001) · Production and Operations Management · doi:10.1111/j.1937-5956.2001.tb00073.x · Cited by 189 · cited 2×
“For example, GM and other automotive manufacturers collect their remanufacturable service parts under a core deposit refund program using a centralised collection system (Ferrer and Whybark 2001, Ferrer and Ketzenberg 2004).”
BackgroundAn analysis of single item inventory systems with returns
Muckstadt, J. A., & Isaac, M. H. (1981) · Naval Research Logistics Quarterly · doi:10.1002/nav.3800280207 · Cited by 176 · cited 12×
“…expected discounted cost (Heyman 1977, Teunter et al. 2000, Teunter 2002), (ii) minimising long-run average cost per unit time (Heyman 1977, Muckstadt and Isaac 1981, van der Laan et al. 1996a, b, 1999a, b, van der Laan and Salomon 1997, Yuan and Cheung 1998, Teunter et al. 2000, Toktay et…”
BackgroundMethodInfluentialZikopoulos, C., & Tagaras, G. (2007) · European Journal of Operational Research · doi:10.1016/j.ejor.2006.10.025 · Cited by 173 · cited 1×
“( 2001 ), Zikopoulos and Tagaras ( 2008a , b ), Ferguson et al.”
Remanufacturing planning for the reverse Wagner/Whitin models
Richter, K., & Sombrutzki, M. (2000) · European Journal of Operational Research · doi:10.1016/s0377-2217(99)00219-2 · Cited by 172 · cited 12×
“One stream of work allows disposals (Golany et al. 2001, 2005, Beltrán and Krass 2002, Yang et al. 2005, Pan et al. 2008), whereas the other does not (Richter and Sombrutzki 2000, Richter and Weber 2001, Richter and Gobsch 2003, Li et al. 2006a, b, Teunter et al. 2006).”
BackgroundMethodInfluentialProduct acquisition management: Current industry practice and a proposed framework
Daniel, V., Guide, R., & Jayaraman, V. (2000) · International Journal of Production Research · doi:10.1080/00207540050176003 · Cited by 168 · cited 1×
“These challenges have been highlighted in the literature (Gungor and Gupta 1999 , Guide 2000 , Guide and Jayaraman 2000 , Fleischmann 2003 , Guide and Van Wassenhove 2003 ), and they provide a rich context for novel optimisation problems.”
BackgroundPurchasing Policy of New Containers Considering the Random Returns of Previously Issued Containers
Kelle, P., & Silver, E. A. (1989) · IIE Transactions · doi:10.1080/07408178908966241 · Cited by 167 · cited 11×
“…review models aim to compute inventory and production control policy parameters in systems characterised by 1SP-a (Whisler 1967, Cohen et al. 1980, Kelle and Silver 1989, Inderfurth 1997, Buchanan and Abad 1998, Kiesmüller and van der Laan 2001, Nakashima et al. 2002, 2004, Fleischmann and Kuik…”
BackgroundMethodInfluentialReturn handling options and order quantities for single period products
Vlachos, D., & Dekker, R. (2003) · European Journal of Operational Research · doi:10.1016/s0377-2217(02)00596-9 · Cited by 167
An inventory model with dependent product demands and returns
Kiesmüller, G. P., & van der Laan, E. A. (2001) · International Journal of Production Economics · doi:10.1016/s0925-5273(00)00080-3 · Cited by 166 · cited 1×
“1999 , Heisig and Fleischmann 2001 , Kiesmuller and van der Laan 2001 , Nakashima et al.”
BackgroundThe reverse Wagner/Whitin model with variable manufacturing and remanufacturing cost
Richter, K., & Weber, J. (2001) · International Journal of Production Economics · doi:10.1016/s0925-5273(00)00142-0 · Cited by 165 · cited 18×
“One stream of work allows disposals (Golany et al. 2001, 2005, Beltrán and Krass 2002, Yang et al. 2005, Pan et al. 2008), whereas the other does not (Richter and Sombrutzki 2000, Richter and Weber 2001, Richter and Gobsch 2003, Li et al. 2006a, b, Teunter et al. 2006).”
BackgroundMethodInfluentialvan der Laan, E., Salomon, M., & Dekker, R. (1999) · European Journal of Operational Research · doi:10.1016/s0377-2217(98)00108-8 · Cited by 159 · cited 9×
“…et al. 2002, Teunter 2002, van der Laan 2003), whereas another examines the case where the manufacturing lead times are constant and the remanufacturing lead times are negligible (van der Laan and Salomon 1997, van der Laan et al. 1999b, Teunter et al. 2004, van der Laan and Teunter 2006).”
BackgroundInfluentialOn the attractiveness of sorting before disassembly in remanufacturing
Zikopoulos, C., & Tagaras, G. (2008) · IIE Transactions · doi:10.1080/07408170701488078 · Cited by 150 · cited 1×
“( 2001 ), Zikopoulos and Tagaras ( 2008a , b ), Ferguson et al.”
Optimal disposal policies for a single‐item inventory system with returns
Heyman, D. P. (1977) · Naval Research Logistics Quarterly · doi:10.1002/nav.3800240302 · Cited by 149 · cited 12×
“Continuous review models are concerned with the objectives of (i) minimising expected discounted cost (Heyman 1977, Teunter et al. 2000, Teunter 2002), (ii) minimising long-run average cost per unit time (Heyman 1977, Muckstadt and Isaac 1981, van der Laan et al. 1996a, b, 1999a, b, van der Laan…”
BackgroundMethodInfluentialProduct recovery in stochastic remanufacturing systems with multiple reuse options
Inderfurth, K., de Kok, A. G., & Flapper, S. D. P. (2001) · European Journal of Operational Research · doi:10.1016/s0377-2217(00)00188-0 · Cited by 149 · cited 2×
“( 2001 ), Zikopoulos and Tagaras ( 2008a , b ), Ferguson et al.”
BackgroundAnalysis of the EOQ repair and waste disposal problem with integer setup numbers
Richter, K., & Dobos, I. (1999) · International Journal of Production Economics · doi:10.1016/s0925-5273(98)00110-8 · Cited by 148 · cited 7×
“We provide a summary of the constant demand and return models (Schrady 1967, Nahmias and Rivera 1979, Mabini et al. 1992, Richter 1996a, b, 1997, Richter and Dobos 1999, 2004, Teunter 2001, 2004, Koh et al. 2002, Teunter and van der Laan 2002, Dobos and Richter 2004, Minner and Lindner 2004, Atasu…”
BackgroundMethodInfluentialAn (s, Q) inventory model with remanufacturing and disposal
van der Laan, E., Dekker, R., Salomon, M., & Ridder, A. (1996) · International Journal of Production Economics · doi:10.1016/0925-5273(95)00020-8 · Cited by 147
Value of information in remanufacturing complex products
Ferrer, G., & Ketzenberg, M. E. (2004) · IIE Transactions · doi:10.1080/07408170490274223 · Cited by 137 · cited 2×
“For example, GM and other automotive manufacturers collect their remanufacturable service parts under a core deposit refund program using a centralised collection system (Ferrer and Whybark 2001, Ferrer and Ketzenberg 2004).”
BackgroundOn the necessity of a disposal option for returned items that can be remanufactured
Teunter, R. H., & Vlachos, D. (2002) · International Journal of Production Economics · doi:10.1016/s0925-5273(01)00096-2 · Cited by 136 · cited 15×
“…(Cohen et al. 1980, Kelle and Silver 1989, Buchanan and Abad 1998, Kiesmüller and Scherer 2003) or simulation-based (Mahadevan et al. 1999, Kiesmüller and van der Laan 2001, Teunter and Vlachos 2002, Kiesmüller 2003b, Kiesmüller and Minner 2003) approaches to compute the control parameters.”
BackgroundMethodInfluentialProduct remanufacturing and disposal: A numerical comparison of alternative control strategies
van der Laan, E., Dekker, R., & Salomon, M. (1996) · International Journal of Production Economics · doi:10.1016/0925-5273(95)00137-9 · Cited by 129 · cited 12×
“…1977, Teunter et al. 2000, Teunter 2002), (ii) minimising long-run average cost per unit time (Heyman 1977, Muckstadt and Isaac 1981, van der Laan et al. 1996a, b, 1999a, b, van der Laan and Salomon 1997, Yuan and Cheung 1998, Teunter et al. 2000, Toktay et al. 2000, Fleischmann et al.…”
BackgroundMethodInfluentialHow to set the holding cost rates in average cost inventory models with reverse logistics?
Teunter, R. H., van der Laan, E., & Inderfurth, K. (2000) · Omega · doi:10.1016/s0305-0483(99)00070-5 · Cited by 125 · cited 9×
“Continuous review models are concerned with the objectives of (i) minimising expected discounted cost (Heyman 1977, Teunter et al. 2000, Teunter 2002), (ii) minimising long-run average cost per unit time (Heyman 1977, Muckstadt and Isaac 1981, van der Laan et al. 1996a, b, 1999a, b, van der Laan…”
BackgroundMethodInfluentialAnalysis and taxonomy of remanufacturing industry practice
Parkinson, H. J., & Thompson, G. (2003) · Proceedings of the Institution of Mechanical Engineers, Part E: Journal of Process Mechanical Engineering · doi:10.1243/095440803322328890 · Cited by 97 · cited 3×
“The remanufacturing industry is a large one that includes many market sectors and provides significant economic, environmental, and societal benefits (Carter and Ellram 1998, Automotive Parts Rebuilders Association 1999, Dowlatshahi 2000, Bartholomew 2002, Parkinson and Thompson 2003).”
BackgroundThe Green Fee: Internalizing and Operationalizing Environmental Issues
Corbett, C. J., & Wassenhove, L. N. V. (1993) · California Management Review · doi:10.2307/41165737 · Cited by 92
Computational issues in a stochastic finite horizon one product recovery inventory model
Kiesmüller, G. P., & Scherer, C. W. (2003) · European Journal of Operational Research · doi:10.1016/s0377-2217(02)00249-7 · Cited by 91 · cited 14×
“…and Dekker 2003, Mostard and Teunter 2006, Karaer and Lee 2007), 2SP-c (Simpson 1978, Inderfurth 1997, Mahadevan et al. 1999, Teunter and Vlachos 2002, Ferrer 2003, Kiesmüller 2003b, Kiesmüller and Minner 2003, Kiesmüller and Scherer 2003), and 2SP-d (Inderfurth 2004, Bay|nd|r et al. 2007).”
BackgroundInfluentialManaging the Reverse Channel with RFID‐Enabled Negative Demand Information
Karaer, Ö., & Lee, H. L. (2007) · Production and Operations Management · doi:10.1111/j.1937-5956.2007.tb00285.x · Cited by 89
A Decision Support System for Planning Remanufacturing at Nortel Networks
Linton, J. D., & Johnston, D. A. (2000) · Interfaces · doi:10.1287/inte.30.6.17.11631 · Cited by 61 · cited 2×
“Other companies that operate in industries where advances in product technology rapidly render existing product populations obsolete use remanufacturing as a strategy for upgrading products (eg, HP's main frame systems (Kuper 2003 ) and Nortel's network systems (Linton and Johnston 2000 )).”
BackgroundAnalysis of a product recovery system
Nakashima, K., 有光, 宏., Nose, T., & Kuriyama, S. (2002) · International Journal of Production Research · doi:10.1080/00207540210132706 · Cited by 53
Cited by
Reverse logistics and closed-loop supply chain: A comprehensive review to explore the future
Govindan, K., Soleimani, H., & Kannan, D. (2015) · European Journal of Operational Research · doi:10.1016/j.ejor.2014.07.012 · Cited by 1,963
A review of reverse logistics and closed-loop supply chains: a Journal of Cleaner Production focus
Govindan, K., & Soleimani, H. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2016.03.126 · Cited by 638
Dev, N. K., Shankar, R., & Qaiser, F. H. (2020) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2019.104583 · Cited by 489
Managing new and remanufactured products to mitigate environmental damage under emissions regulation
Yenipazarli, A. (2016) · European Journal of Operational Research · doi:10.1016/j.ejor.2015.08.020 · Cited by 440
Amin, S. H., & Zhang, G. (2013) · Applied Mathematical Modelling · doi:10.1016/j.apm.2012.09.039 · Cited by 432
Metadata
- Authors
- Akçalı, E., & Çetinkaya, S.
- Venue
- International Journal of Production Research
- Publisher
- Informa UK Limited
- Published
- 2010-04-29
- Volume
- 49
- Issue
- 8
- Pages
- 2373-2407
- ISSN
- 0020-7543 (ISSN-L)
- 1366-588X
- OpenAlex
- W2039837125
- Cited by
- 229
- References
- 55
- FWCI
- 31.84
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.