CoChat

Adaptive scheduling for assembly job shop with uncertain assembly times based on dual Q-learning

Open access
Wang, Haoxiang, Sarker, Bhaba R., Li, Jing, Li, Jian · 2021 · International Journal of Production Research
Cited by 173

The DOI matches its Crossref record; 2 of the 2 references it cites were found in a registry or an index.

Abstract

To address the uncertainty of production environment in assembly job shop, in combination of the real-time feature of reinforcement learning, a dual Q-learning (D-Q) method is proposed to enhance the adaptability to environmental changes by self-learning for assembly job shop scheduling problem. On the basis of the objective function of minimising the total weighted earliness penalty and completion time cost, the top level Q-learning is focused on localised targets in order to find the dispatching policy which can minimise machine idleness and balance machine loads, and the bottom level Q-learning is focused on global targets in order to learn the optimal scheduling policy which can minimise the overall earliness of all jobs. Some theoretical results and simulation experiments indicate that the proposed algorithm achieves generally better results than the single Q-learning (S-Q) and other scheduling rules, under the arrival frequency of product with different conditions, and show good adaptive performance.Abbreviations: AFSSP, assembly flow shop scheduling problem; AJSSP, assembly job shop scheduling problem; RL, reinforcement learning; TASP, two-stage assembly scheduling problem

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1080/00207543.2020.1794075

Cites

2 of 2 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Show all 2 references

Cited by

See all 173

Metadata

Authors
Wang, H., Sarker, B. R., Li, J., & Li, J.
Venue
International Journal of Production Research
Published
2020-07-29
Volume
59
Issue
19
Pages
5867-5883
ISSN
  • 0020-7543 (ISSN-L)
  • 1366-588X
OpenAlex
W3045574728
Cited by
173
References
2
FWCI
11.19
Type
journal article
Language
en
Open access
green

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Adaptive scheduling for assembly job shop with uncertain assembly times based on dual Q-learning. https://app.cochat.ai/papers/10.1080/00207543.2020.1794075
The paper
Wang, H., Sarker, B. R., Li, J., & Li, J. (2021). Adaptive scheduling for assembly job shop with uncertain assembly times based on dual Q-learning. International Journal of Production Research. https://doi.org/10.1080/00207543.2020.1794075

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.