Adaptive scheduling for assembly job shop with uncertain assembly times based on dual Q-learning
Open accessThe DOI matches its Crossref record; 2 of the 2 references it cites were found in a registry or an index.
Abstract
To address the uncertainty of production environment in assembly job shop, in combination of the real-time feature of reinforcement learning, a dual Q-learning (D-Q) method is proposed to enhance the adaptability to environmental changes by self-learning for assembly job shop scheduling problem. On the basis of the objective function of minimising the total weighted earliness penalty and completion time cost, the top level Q-learning is focused on localised targets in order to find the dispatching policy which can minimise machine idleness and balance machine loads, and the bottom level Q-learning is focused on global targets in order to learn the optimal scheduling policy which can minimise the overall earliness of all jobs. Some theoretical results and simulation experiments indicate that the proposed algorithm achieves generally better results than the single Q-learning (S-Q) and other scheduling rules, under the arrival frequency of product with different conditions, and show good adaptive performance.Abbreviations: AFSSP, assembly flow shop scheduling problem; AJSSP, assembly job shop scheduling problem; RL, reinforcement learning; TASP, two-stage assembly scheduling problem
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Watkins, C. J. C. H., & Dayan, P. (1992) · Machine Learning · doi:10.1007/bf00992698 · Cited by 9,083
Real-time scheduling for a smart factory using a reinforcement learning approach
Shiue, Y.-R., Lee, K.-C., & Su, C.-T. (2018) · Computers & Industrial Engineering · doi:10.1016/j.cie.2018.03.039 · Cited by 225 · cited 1×
“…advancement of RL in the areas of artificial intelligence, control, decision and programming in recent years, Q-learning is increasingly being applied to production scheduling field (Aydin and Öztemel 2000; Wang and Usher 2007; Yang and Yan2009 ; Zhang, Zheng, and Li 2012; Shiue, Lee, and Su2018).”
Method
Cited by
Deep reinforcement learning for dynamic scheduling of a flexible job shop
Liu, R., Piplani, R., & Toro, C. (2022) · International Journal of Production Research · doi:10.1080/00207543.2022.2058432 · Cited by 310
Luo, S., Zhang, L., & Fan, Y. (2022) · IEEE Transactions on Automation Science and Engineering · doi:10.1109/tase.2021.3104716 · Cited by 235
AI Agents and Agentic AI–navigating a plethora of concepts for future manufacturing
Ren, Y., Liu, Y., Ji, T., & Xu, X. (2025) · Journal of Manufacturing Systems · doi:10.1016/j.jmsy.2025.08.017 · Cited by 66
Metadata
- Authors
- Wang, H., Sarker, B. R., Li, J., & Li, J.
- Venue
- International Journal of Production Research
- Publisher
- Informa UK Limited
- Published
- 2020-07-29
- Volume
- 59
- Issue
- 19
- Pages
- 5867-5883
- ISSN
- 0020-7543 (ISSN-L)
- 1366-588X
- OpenAlex
- W3045574728
- Cited by
- 173
- References
- 2
- FWCI
- 11.19
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Adaptive scheduling for assembly job shop with uncertain assembly times based on dual Q-learning. https://app.cochat.ai/papers/10.1080/00207543.2020.1794075
- The paper
- Wang, H., Sarker, B. R., Li, J., & Li, J. (2021). Adaptive scheduling for assembly job shop with uncertain assembly times based on dual Q-learning. International Journal of Production Research. https://doi.org/10.1080/00207543.2020.1794075
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.