Analyzing organizational project alternatives for agile manufacturing processes: An analytical network approach
The DOI matches its Crossref record.
Abstract
The objective of this paper is to introduce a decision methodology and structure for manufacturing (and organizational) agility improvement. The methodology allows for the evaluation of alternatives (e.g. projects) to help organizations become more agile, with a specific objective of improving the manufacturing business processes. An agile enterprise is one whose processes are designed to respond effectively to unanticipated change. One of the difficulties in designing and analysing business processes, in general, is that they are operational designs that need to incorporate strategic attributes. In order to evaluate alternatives that impact the business processes, a networked hierarchical analysis model based on the various characteristics of agility, is proposed. This evaluation model will be based on the analytic network process methodology for solving complex and systemic decisions. An actual example of a small manufacturing enterprise provides some managerial insights into the methodology.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
Modeling the metrics of lean, agile and leagile supply chain: An ANP-based approach
Agarwal, A., Shankar, R., & Tiwari, M. K. (2006) · European Journal of Operational Research · doi:10.1016/j.ejor.2004.12.005 · Cited by 750
Selection of logistics service provider: An analytic network process (ANP) approach
Jharkharia, S., & Shankar, R. (2007) · Omega · doi:10.1016/j.omega.2005.06.005 · Cited by 697
Using the analytic network process (ANP) in a SWOT analysis – A case study for a textile firm
Yüksel, İ., & Dagˇdeviren, M. (2007) · Information Sciences · doi:10.1016/j.ins.2007.01.001 · Cited by 694
Modeling agility of supply chain
Agarwal, A., Shankar, R., & Tiwari, M. K. (2007) · Industrial Marketing Management · doi:10.1016/j.indmarman.2005.12.004 · Cited by 649
Chen, Y., Wang, Y., Nevo, S., Jin, J., Wang, L., & Chow, W. S. (2014) · European Journal of Information Systems · doi:10.1057/ejis.2013.4 · Cited by 557
Ravi, V., Shankar, R., & Tiwari, M. K. (2005) · Computers & Industrial Engineering · doi:10.1016/j.cie.2005.01.017 · Cited by 474
Tsai, W.-H., & Chou, W.-C. (2009) · Expert Systems with Applications · doi:10.1016/j.eswa.2007.11.058 · Cited by 432
Intelligent building research: a review
Wong, J. K. W., Li, H., & Wang, S. W. (2005) · Automation in Construction · doi:10.1016/j.autcon.2004.06.001 · Cited by 408
Analytic network process (ANP) approach for product mix planning in semiconductor fabricator
Chung, S.-H., Lee, A. H. I., & Pearn, W. L. (2005) · International Journal of Production Economics · doi:10.1016/j.ijpe.2004.02.006 · Cited by 368
Kannan, D. (2018) · International Journal of Production Economics · doi:10.1016/j.ijpe.2017.02.020 · Cited by 364
An analysis of DEMATEL approaches for criteria interaction handling within ANP
Gölcük, İ., & Baykasoğlu, A. (2016) · Expert Systems with Applications · doi:10.1016/j.eswa.2015.10.041 · Cited by 359
Walter, A.-T. (2021) · Management Review Quarterly · doi:10.1007/s11301-020-00186-6 · Cited by 331
Agility drivers, enablers and outcomes: Empirical test of an integrated agile manufacturing model
Vázquez‐Bustelo, D., Avella, L., & Fernández, E. (2007) · International Journal of Operations & Production Management · doi:10.1108/01443570710835633 · Cited by 317
Tadić, S., Zečević, S., & Krstić, M. (2014) · Expert Systems with Applications · doi:10.1016/j.eswa.2014.07.021 · Cited by 298
He, Q., Luo, L., Hu, Y., & Chan, A. P. C. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2014.07.009 · Cited by 243
Presley, A., Meade, L., & Sarkis, J. (2007) · International Journal of Production Research · doi:10.1080/00207540701440220 · Cited by 232
“The consideration and evaluation on two of the three dimensions [economic (business) and environmental] have been well established in the literature (Meade and Sarkis 1999 , Meade et al .”
BackgroundSelf-citationYüksel, İ., & Dağdeviren, M. (2010) · Expert Systems with Applications · doi:10.1016/j.eswa.2009.06.002 · Cited by 222
Thakkar, J., Deshmukh, S. G., Gupta, A. D., & Shankar, R. (2006) · International Journal of Productivity and Performance Management · doi:10.1108/17410400710717073 · Cited by 222
Li, T., Li, A., & Guo, X. (2020) · Energy · doi:10.1016/j.energy.2020.118694 · Cited by 195
A hybrid approach to concept selection through fuzzy analytic network process
Ayağ, Z., & Özdemir, R. G. (2009) · Computers & Industrial Engineering · doi:10.1016/j.cie.2008.06.011 · Cited by 183
A fuzzy analytic network process (ANP) model to identify faulty behavior risk (FBR) in work system
Dağdeviren, M., Yüksel, İ., & Kurt, M. (2008) · Safety Science · doi:10.1016/j.ssci.2007.02.002 · Cited by 176
Tsai, W.-H., Chou, W.-C., & Hsu, W. (2009) · Journal of the Operational Research Society · doi:10.1057/jors.2008.91 · Cited by 175
“A supermatrix is actually a partitioned matrix, where each matrix segment represents a relationship between two nodes (components or clusters) in a system (Meade and Sarkis, 1999; Lee and Kim, 2000).”
BackgroundMethodInfluentialA review on supply chain performance measures and metrics: 2000‐2011
Gopal, P. R. C., & Thakkar, J. (2012) · International Journal of Productivity and Performance Management · doi:10.1108/17410401211232957 · Cited by 168
An evaluation framework for technology transfer of new equipment in high technology industry
Lee, A. H. I., Wang, W.-M., & Lin, T.-Y. (2010) · Technological Forecasting and Social Change · doi:10.1016/j.techfore.2009.06.002 · Cited by 168
Hughes, D. L., Dwivedi, Y. K., Rana, N. P., & Simintiras, A. C. (2016) · Production Planning & Control · doi:10.1080/09537287.2016.1217571 · Cited by 120
Metadata
- Authors
- Meade, L. M., & Sarkis, J.
- Venue
- International Journal of Production Research
- Publisher
- Informa UK Limited
- Published
- 1999-02
- Volume
- 37
- Issue
- 2
- Pages
- 241-261
- ISSN
- 0020-7543 (ISSN-L)
- 1366-588X
- OpenAlex
- W2041240465
- Cited by
- 518
- References
- 0
- FWCI
- 10.44
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.