The DOI matches its Crossref record; 27 of the 27 references it cites were found in a registry or an index.
Intelligent building research: a review
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Application of the AHP in project management
Al-Harbi, K. M. A.-S. (2001) · International Journal of Project Management · doi:10.1016/s0263-7863(99)00038-1 · Cited by 1,125
Life cycle costing—Theory, information acquisition and application
Woodward, D. G. (1997) · International Journal of Project Management · doi:10.1016/s0263-7863(96)00089-0 · Cited by 587
Gluch, P., & Baumann, H. (2004) · Building and Environment · doi:10.1016/j.buildenv.2003.10.008 · Cited by 552
R&D project selection using the analytic network process
Meade, L. M., & Presley, A. R. (2002) · IEEE Transactions on Engineering Management · doi:10.1109/17.985748 · Cited by 528
Meade, L. M., & Sarkis, J. (1999) · International Journal of Production Research · doi:10.1080/002075499191751 · Cited by 518
Model-based optimal control of VAV air-conditioning system using genetic algorithm
Wang, S., & Jin, X. (2000) · Building and Environment · doi:10.1016/s0360-1323(99)00032-3 · Cited by 282
Self-citationRemer, D. S., & Nieto, A. P. (1995) · International Journal of Production Economics · doi:10.1016/0925-5273(95)00104-2 · Cited by 218
Prediction and optimization of life-cycle costs in early design
Bogenstätter, U. (2000) · Building Research & Information · doi:10.1080/096132100418528 · Cited by 202
The value of management flexibility—a real option approach to investment evaluation
Yeo, K. T., & Qiu, F. (2003) · International Journal of Project Management · doi:10.1016/s0263-7863(02)00025-x · Cited by 202
Ho, S. P., & Liu, L. Y. (2002) · Construction Management and Economics · doi:10.1080/01446190110110533 · Cited by 158
Cited by
Optimal sizing of renewable hybrids energy systems: A review of methodologies
Luna-Rubio, R., Trejo-Perea, M., Vargas-Vázquez, D., & Ríos-Moreno, G. J. (2012) · Solar Energy · doi:10.1016/j.solener.2011.10.016 · Cited by 560
Model predictive control of a building heating system: The first experience
Prívara, S., Široký, J., Ferkl, L., & Cigler, J. (2011) · Energy and Buildings · doi:10.1016/j.enbuild.2010.10.022 · Cited by 473
Wong, J. K. W., & Li, H. (2008) · Building and Environment · doi:10.1016/j.buildenv.2006.11.019 · Cited by 432
Self-citationAn integrated system for buildings’ energy-efficient automation: Application in the tertiary sector
Marinakis, V., Doukas, H., Karakosta, C., & Psarras, J. (2013) · Applied Energy · doi:10.1016/j.apenergy.2012.05.032 · Cited by 154
Bayasgalan, A., Park, Y. S., Koh, S. B., & Son, S.-Y. (2024) · Energies · doi:10.3390/en17194794 · Cited by 30
Metadata
- Authors
- Wong, J. K. W., Li, H., & Wang, S. W.
- Venue
- Automation in Construction
- Publisher
- Elsevier BV
- Published
- 2005-01
- Volume
- 14
- Issue
- 1
- Pages
- 143-159
- ISSN
- 0926-5805 (ISSN-L)
- OpenAlex
- W1511410009
- Cited by
- 408
- References
- 27
- FWCI
- 25.58
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Intelligent building research: a review. https://app.cochat.ai/papers/10.1016/j.autcon.2004.06.001
- The paper
- Wong, J. K. W., Li, H., & Wang, S. W. (2005). Intelligent building research: a review. Automation in Construction. https://doi.org/10.1016/j.autcon.2004.06.001
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.