Analysis of factors influencing project cost estimating practice
Abstract
Although extensive research has been undertaken on factors influencing the decision to tender and mark-up and tender price determination for construction projects, very little of this research contains information appropriate to the factors involved in costing construction projects. The object of this study was to gain an understanding of the factors influencing contractors' cost estimating practice. This was achieved through a comparative study of eighty-four UK contractors classified into four categories, namely, very small, small, medium and large firms. The initial analysis of the 24 factors considered in the study shows that the main factors relevant to cost estimating practice are complexity of the project, scale and scope of construction, market conditions, method of construction, site constraints, client's financial position, buildability and location of the project. Analysis of variance, which tests the null hypothesis that the opinions of the four categories of companies are not significantly different, shows that except for the procurement route and contractual arrangement factor there is no difference of opinion, at the 5% significance level, on the factors influencing cost estimating. Further analysis, based on a factor analysis technique, shows that the variables could be grouped into seven factors; the most important factor grouping being project complexity followed by technological requirements, project information, project team requirement, contract requirement, project duration and, finally, market requirement.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Norussis, H. (1993) · Medical Entomology and Zoology · Cited by 2,704
Critchley, F., Murtagh, F., & Heck, A. (1988) · Journal of the Royal Statistical Society. Series A (Statistics in Society) · doi:10.2307/2983024 · Cited by 2,314
Industrial Organisation: Theory and Practice
Borgenhammar, E., & Woodward, J. (1966) · The Swedish Journal of Economics · doi:10.2307/3439320 · Cited by 331
A survey of indirect cost estimating in practice
Tah, J. H. M., Thorpe, A., & McCaffer, R. (1994) · Construction Management and Economics · doi:10.1080/01446199400000004 · Cited by 63
Cited by
Clarifying the project complexity construct: Past, present and future
Bakhshi, J., Ireland, V., & Gorod, A. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.06.002 · Cited by 293
Risk paths in international construction projects: Case study from Chinese contractors
Liu, J., Zhao, X., & Yan, P. (2016) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001116 · Cited by 203
Ghazal, M. M., & Hammad, A. (2022) · International Journal of Construction Management · doi:10.1080/15623599.2020.1738205 · Cited by 52
Metadata
- Authors
- Akintoye, A.
- Venue
- Construction Management and Economics
- Publisher
- Informa UK Limited
- Published
- 2000-01
- Volume
- 18
- Issue
- 1
- Pages
- 77-89
- ISSN
- 0144-6193 (ISSN-L)
- 1466-433X
- OpenAlex
- W2012395052
- Cited by
- 608
- References
- 4
- FWCI
- 4.10
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Analysis of factors influencing project cost estimating practice. https://app.cochat.ai/papers/10.1080/014461900370979
- The paper
- Akintoye, A. (2000). Analysis of factors influencing project cost estimating practice. Construction Management and Economics. https://doi.org/10.1080/014461900370979
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.