Significant factors causing delay in the UAE construction industry
Abstract
Construction delay is considered one of the most recurring problems in the construction industry. Delays have an adverse impact on project success in terms of time, cost, quality and safety. The effects of construction delays are not confined to the construction industry only, but influence the overall economy of a country like UAE, where construction plays a major role in its development and contributes 14% to the GDP. Thus, it is essential to define the most significant causes of delay in order to avoid or minimise their impact on construction projects. A detailed questionnaire was developed and used to get input from professionals associated with the UAE construction industry. The perspective of contractors and consultants has been analysed to rank the causes of delays based on their Relative Importance Index. Contractors and consultants were in agreement on the most significant causes of delays. The research revealed that 50% of the construction projects in UAE encounter delays and are not completed on time. The top 10 most significant causes of construction delays have been identified by this research. Approval of drawings, inadequate early planning and slowness of the owners' decision‐making process are the top causes of delay in the UAE construction industry.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
Critical Management Practices Influencing On-Site Waste Minimization in Construction Projects
Ajayi, S. O., Oyedele, L. O., Bilal, M., Akinade, O. O., Alaka, H. A., & Owolabi, H. A. (2017) · Waste Management · doi:10.1016/j.wasman.2016.10.040 · Cited by 200
Effect of lean tools to control external environment risks of construction projects
Ansah, R. H., & Sorooshian, S. (2017) · Sustainable Cities and Society · doi:10.1016/j.scs.2017.03.027 · Cited by 92
Construction delays in privately funded large building projects in Bangladesh
Islam, M. S., & Suhariadi, B. T. (2018) · Asian Journal of Civil Engineering · doi:10.1007/s42107-018-0034-3 · Cited by 44
Risk Assessment at the Design Phase of Construction Projects in Ghana
Awuni, M. A. (2019) · Journal of Building Construction and Planning Research · doi:10.4236/jbcpr.2019.72004 · Cited by 5
Metadata
- Authors
- Faridi, A. S., & El‐Sayegh, S. M.
- Venue
- Construction Management and Economics
- Publisher
- Informa UK Limited
- Published
- 2006-11
- Volume
- 24
- Issue
- 11
- Pages
- 1167-1176
- ISSN
- 0144-6193 (ISSN-L)
- 1466-433X
- OpenAlex
- W2076325701
- Cited by
- 551
- References
- 0
- FWCI
- 6.72
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Significant factors causing delay in the UAE construction industry. https://app.cochat.ai/papers/10.1080/01446190600827033
- The paper
- Faridi, A. S., & El‐Sayegh, S. M. (2006). Significant factors causing delay in the UAE construction industry. Construction Management and Economics. https://doi.org/10.1080/01446190600827033
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.