Analysis of pre‐qualification criteria in contractor selection and their impacts on project success
The DOI matches its Crossref record; 15 of the 15 references it cites were found in a registry or an index.
Abstract
While construction industry practices are reasonably well developed, construction projects still witness widespread failures of many contractors due to varied reasons such as financial problems, poor management, over‐commitment and or conflicts and disputes associated with construction activities. Pre‐qualification of contractors is a common practice across projects, yet the investigation on the ability of the selected contractors in successful delivery of projects is not widespread. In an attempt to understand these pre‐emptive qualification criteria and their links in contractors’ performance in projects, a total of 43 influencing technical attributes were identified through a systematic research approach. The relative significance and impacts of the attributes have been determined based on a structured questionnaire survey in selected construction projects. By performing the factor analysis, a total of seven factors significant to contractors’ performance were extracted, namely (1) soundness of business and workforce; (2) planning and control; (3) quality management; (4) past performance; (5) risk management; (6) organizational capability; and (7) commitment and dedication. Multiple linear regression models reveal that technical expertise, past success, time in business, work methods and working capital significantly impact on contractors’ performance across time, cost and quality success. With a clear understanding of a contractor’s performance, these findings could potentially contribute to development of a company’s procedures or enhance existing knowledge in relation to the pre‐qualification practices in contractor selection in projects.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Discovering Statistics Using SPSS
Field, A. P., & Miles, J. N. V. (2000) · Medical Entomology and Zoology · Cited by 28,294
A comparative study of causes of time overruns in Hong Kong construction projects
Chan, D. W., & Kumaraswamy, M. M. (1997) · International Journal of Project Management · doi:10.1016/s0263-7863(96)00039-7 · Cited by 831 · cited 2×
“Chan and Kumaraswamy ( 1997 ) suggested that the mean and standard deviation of each individual attribute are not reliable statistics to assess the overall rankings.”
BackgroundWhich contractor selection methodology?
Holt, G. D. (1998) · International Journal of Project Management · doi:10.1016/s0263-7863(97)00035-5 · Cited by 358 · cited 8×
“All three failure attributes are perceived to be the most critical contributing factors related to overall project outcomes (Holt, 1998).”
BackgroundMethodInfluentialFinal contractor selection using the analytical hierarchy process
Fong, P. S. W., & Choi, S. K.-Y. (2000) · Construction Management and Economics · doi:10.1080/014461900407356 · Cited by 335 · cited 2×
“This is perhaps due to adequate support by the tacit knowledge of the contractor’s organization in clarifying the design and easing out the constructability issues in the project implementation process (Holt et al., 1995; Lo et al., 1998; Fong and Choi, 2000; Sacks and Harel, 2006).”
BackgroundMethodContractor selection using the analytic network process
Cheng, E. W. L., & Li, H. (2004) · Construction Management and Economics · doi:10.1080/0144619042000202852 · Cited by 259 · cited 2×
“In a separate study in Hong Kong, Cheng and Li ( 2004 ) investigated the independent influence on a range of contractor selection criteria based on analytical network process (ANP).”
BackgroundContractor Selection Criteria: Investigation of Opinions of Singapore Construction Practitioners
Singh, D., & Tiong, R. L. K. (2006) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2006)132:9(998 · Cited by 121 · cited 13×
“This supports the innovation of a well-equipped management team for achieving better outcomes in projects (Greenwood, 2001; Singh and Tiong, 2006).”
BackgroundResultInfluentialAn economic game theory model of subcontractor resource allocation behaviour
Sacks, R., & Harel, M. (2006) · Construction Management and Economics · doi:10.1080/01446190600631856 · Cited by 99 · cited 5×
“This finding is similar to the findings reported by Sacks and Harel (2006).”
BackgroundMethodResultInfluentialStructural equation model of project planning effectiveness
Islam, M. D. M., & Faniran, O. O. (2005) · Construction Management and Economics · doi:10.1080/0144619042000301384 · Cited by 99 · cited 1×
“By undertaking the survey of selected professionals practising in medium‐sized design and construction firms, the impact of various attributes on the contractor selection practice and the overall outcomes of the projects have been established (Palaneeswaran and Kumaraswamy, 2000 ; Islam and Faniran, 2005 ).”
BackgroundA support vector machine model for contractor prequalification
Lam, K. C., Palaneeswaran, E., & Yu, C.-Y. (2008) · Automation in Construction · doi:10.1016/j.autcon.2008.09.007 · Cited by 90 · cited 2×
“, 2009 ), the criteria for pre‐qualification in relation to the contractor’s ability to meeting the client’s requirements and achieving success in projects is still a topic for investigation (Holt, 1998 ; Mbachu, 2008 ).”
BackgroundThe accuracy of pre‐tender building cost estimates in Australia
Aibinu, A. A., & Pasco, T. (2008) · Construction Management and Economics · doi:10.1080/01446190802527514 · Cited by 88 · cited 1×
“The overall research project was designed to use primarily two standard statistical methods, namely 1250 Doloi factor analysis (Field, 2005) and regression modelling (Aibinu and Pasco, 2008; Wong et al. , 2008).”
Method
Cited by
Analysing factors affecting delays in Indian construction projects
Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2012) · International Journal of Project Management · doi:10.1016/j.ijproman.2011.10.004 · Cited by 745
Self-citationAlzahrani, J. I., & Emsley, M. W. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.06.006 · Cited by 344
Doloi, H. (2013) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000621 · Cited by 325
Self-citationIslam, M. S., Nepal, M. P., & Skitmore, M. (2019) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001593 · Cited by 60
The influence of independent contractors on organizational effectiveness: A review
Flinchbaugh, C., Zare, M., Chadwick, C., Li, P., & Essman, S. (2020) · Human Resource Management Review · doi:10.1016/j.hrmr.2019.01.002 · Cited by 34
Metadata
- Authors
- Doloi, H.
- Venue
- Construction Management and Economics
- Publisher
- Informa UK Limited
- Published
- 2009-12
- Volume
- 27
- Issue
- 12
- Pages
- 1245-1263
- ISSN
- 0144-6193 (ISSN-L)
- 1466-433X
- OpenAlex
- W1983977282
- Cited by
- 170
- References
- 15
- FWCI
- 5.86
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.