Student or educator? Sign up with your school email and get 6 months of Pro free.
Cited by 290

The DOI matches its Crossref record; 23 of the 23 references it cites were found in a registry or an index.

The construction firm and the construction project: a transaction cost approach

Winch, Graham·1989·Construction Management and Economics

Abstract

Three of the influential perspectives for analysing construction management are reviewed - socio-technical systems; organization and environment; and project management - and it is suggested that in spite of their considerable usefulness, they contain no framework for analysing the inevitable differences in interest between the different firms who are members of the project coalition. An alternative approach is then presented - the transaction cost approach - which, it is suggested, does allow these differences to be analysed. In conclusion, the dynamics of the contracting system are assessed in terms of the contradiction between construction firms’ responses to the uncertainties inherent in the project, and those deriving from the contracting system itself.

Overview

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1080/01446198900000032

Cites

23 of 23 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Show all 23 references

Cited by

See all 290

Metadata

Authors
Winch, G.
Venue
Construction Management and Economics
Published
1989-12
Volume
7
Issue
4
Pages
331-345
ISSN
  • 0144-6193 (ISSN-L)
  • 1466-433X
OpenAlex
W2007473484
Cited by
290
References
23
FWCI
1.19
Type
journal article
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: The construction firm and the construction project: a transaction cost approach. https://app.cochat.ai/papers/10.1080/01446198900000032
The paper
Winch, G. (1989). The construction firm and the construction project: a transaction cost approach. Construction Management and Economics. https://doi.org/10.1080/01446198900000032

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.