The DOI matches its Crossref record; 5 of the 5 references it cites were found in a registry or an index.
Selecting a suitable procurement method for a building project
Abstract
Building procurement has become a fashionable term with industry practitioners and researchers. It determines the overall framework and structure of responsibilities and authorities for participants within the building process. It is a key factor contributing to overall client satisfaction and project success. The selection of the most suitable procurement method consequently is critical for both clients and project participants, and is becoming an important and contemporary issue within the building industry. The problem, nevertheless, lies in the fact that there has been limited empirical research in this field of study. Postal questionnaire surveys of 41 clients and 35 consultants were carried out, and were used to obtain experience of and attitudes to a variety of procurement methods and the criteria used for selection. The findings indicate that a simple set of the criteria generally is adequate and sufficient for procurement path selection, and that there is a reasonable consensus on the appropriate weighting for each path. Moreover, it is shown that, contrary to expectations, similar clients generally do not have similar procurement needs.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Kendall, M. G., & Smith, B. B. (1939) · The Annals of Mathematical Statistics · doi:10.1214/aoms/1177732186 · Cited by 944
Ireland, V. (1985) · Construction Management and Economics · doi:10.1080/01446198500000006 · Cited by 157
CONSTRUCTION MANAGEMENT IN PRACTICE
Kopac, L., & Gheorghe, S. P. A. M. (2022) · doi:10.33965/ice2022_202210l016 · Cited by 61
Developing expert systems for management applications
Holroyd, P., Mallory, G. R., Price, D. H. R., et al. (1985) · Omega · doi:10.1016/0305-0483(85)90077-5 · Cited by 48
A comparison of contractual arrangements for building projects
Nahapiet, H., & Nahapiet, J. (1985) · Construction Management and Economics · doi:10.1080/01446198500000016 · Cited by 46
Cited by
Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects
Love, P. E. D. (2002) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2002)128:1(18 · Cited by 463
Self-citationEriksson, P. E., & Westerberg, M. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.01.003 · Cited by 363
Application of Delphi method in selection of procurement systems for construction projects
Chan, A. P. C., Yung, E. H. K., Lam, P. T. I., Tam, C. M., & Cheung, S. O. (2001) · Construction Management and Economics · doi:10.1080/01446190110066128 · Cited by 351
Love, P. E. D., Holt, G. D., Shen, L. Y., Li, H., & Irani, Z. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(01)00039-4 · Cited by 316
Self-citationSustainable procurement practice
Meehan, J., & Bryde, D. (2011) · Business Strategy and the Environment · doi:10.1002/bse.678 · Cited by 304
Metadata
- Authors
- Love, P. E. D., Skitmore, M., & Earl, G.
- Venue
- Construction Management and Economics
- Publisher
- Informa UK Limited
- Published
- 1998-03
- Volume
- 16
- Issue
- 2
- Pages
- 221-233
- ISSN
- 0144-6193 (ISSN-L)
- 1466-433X
- OpenAlex
- W2096773961
- Cited by
- 281
- References
- 5
- FWCI
- 7.17
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Selecting a suitable procurement method for a building project. https://app.cochat.ai/papers/10.1080/014461998372501
- The paper
- Love, P. E. D., Skitmore, M., & Earl, G. (1998). Selecting a suitable procurement method for a building project. Construction Management and Economics. https://doi.org/10.1080/014461998372501
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.