The DOI matches its Crossref record; 64 of the 64 references it cites were found in a registry or an index.
Effects of cooperative procurement procedures on construction project performance: A conceptual framework
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Baron, R. M., & Kenny, D. A. (1986) · Journal of Personality and Social Psychology · doi:10.1037/0022-3514.51.6.1173 · Cited by 91,532
THE ANTECEDENTS, CONSEQUENCES, AND MEDIATING ROLE OF ORGANIZATIONAL AMBIDEXTERITY.
Gibson, C. B., & Birkinshaw, J. (2004) · Academy of Management Journal · doi:10.2307/20159573 · Cited by 3,919
Organizational Ambidexterity: Antecedents, Outcomes, and Moderators
Raisch, S., & Birkinshaw, J. (2008) · Journal of Management · doi:10.1177/0149206308316058 · Cited by 2,702
Organizational Ambidexterity: Balancing Exploitation and Exploration for Sustained Performance
Raisch, S., Birkinshaw, J., Probst, G., & Tushman, M. L. (2009) · Organization Science · doi:10.1287/orsc.1090.0428 · Cited by 2,224
The “real” success factors on projects
Cooke-Davies, T. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(01)00067-9 · Cited by 1,837
Causes of delay in large construction projects
Assaf, S. A., & Al-Hejji, S. (2006) · International Journal of Project Management · doi:10.1016/j.ijproman.2005.11.010 · Cited by 1,705
A new framework for determining critical success/failure factors in projects
Belassi, W., & Tukel, O. I. (1996) · International Journal of Project Management · doi:10.1016/0263-7863(95)00064-x · Cited by 1,187
Incentives versus Transaction Costs: A Theory of Procurement Contracts
Bajari, P., & Tadelis, S. (2001) · The RAND Journal of Economics · doi:10.2307/2696361 · Cited by 1,098
The construction industry as a loosely coupled system: implications for productivity and innovation
Dubois, A., & Gadde, L.-E. (2002) · Construction Management and Economics · doi:10.1080/01446190210163543 · Cited by 1,041
Measurement of project success
de Wit, A. (1988) · International Journal of Project Management · doi:10.1016/0263-7863(88)90043-9 · Cited by 977
Cited by
A systematic review of research on coopetition: Toward a multilevel understanding
Bengtsson, M., & Raza-Ullah, T. (2016) · Industrial Marketing Management · doi:10.1016/j.indmarman.2016.05.003 · Cited by 401
Wimalasena, N. N., & Gunatilake, S. (2018) · Construction Innovation · doi:10.1108/ci-03-2017-0025 · Cited by 38
Evolution of Electronic Procurement: Contemporary Review of Adoption and Implementation Strategies
Chan, A. P. C., & Owusu, E. K. (2022) · Buildings · doi:10.3390/buildings12020198 · Cited by 34
“tems or methods have been developed to suit the specific needs and demands of a project [28,32,33].”
MethodCircular public procurement through integrated contracts in the infrastructure sector
Lingegård, S., Havenvid, M. I., & Eriksson, P.-E. (2021) · Sustainability · doi:10.3390/su132111983 · Cited by 20
Self-citation
Metadata
- Authors
- Eriksson, P. E., & Westerberg, M.
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 2011-02
- Volume
- 29
- Issue
- 2
- Pages
- 197-208
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W2011066533
- Cited by
- 363
- References
- 64
- FWCI
- 24.85
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Effects of cooperative procurement procedures on construction project performance: A conceptual framework. https://app.cochat.ai/papers/10.1016/j.ijproman.2010.01.003
- The paper
- Eriksson, P. E., & Westerberg, M. (2011). Effects of cooperative procurement procedures on construction project performance: A conceptual framework. International Journal of Project Management. https://doi.org/10.1016/j.ijproman.2010.01.003
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.