Contributors to construction delays

Kumaraswamy, Mohan M., Chan, Daniel W. M.·1998·Construction Management and Economics

Abstract

Projects can be delayed for a large number of reasons. The third phase of an investigation into such factors focused on the causes of construction delays in Hong Kong. A questionnaire was based on 83 factors identified in previous phases of the investigation. Analysis of the responses reveals differences in perceptions of the relative significance of factors between clients, consultants and contractors. There was general agreement about the relative importance of delay factors such as unforeseen ground conditions. Improving productivity is a useful approach to controlling delays. Important factors affecting productivity itself are thus examined in more depth, with a view to enhancing productivity and reducing delays. The conclusions of this phase of the investigation include a ranking of factors and factor categories that are perceived by different groups of project participants to contribute to delays. For example, higher-ranking factors, such as unforeseen ground conditions, and factor categories such as project-related factors, are found to merit special management attention in countering construction delays. The high degree of disagreement as discerned between the groups of clients, consultants and contractors is indicative of their experiences, possible prejudices and lack of effective communication. It is also confirmed that productivity and other non-scope factors such as effective communications should supplement the project scope factors incorporated into the construction time prediction models that were proposed in the previous phases of this investigation.

Overview

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1080/014461998372556

Cites

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cited by

See all 239

Metadata

Authors
Kumaraswamy, M. M., & Chan, D. W. M.
Venue
Construction Management and Economics
Published
1998-01
Volume
16
Issue
1
Pages
17-29
ISSN
  • 0144-6193 (ISSN-L)
  • 1466-433X
OpenAlex
W1980556859
Cited by
239
References
0
Type
paratext
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Contributors to construction delays. https://app.cochat.ai/papers/10.1080/014461998372556
The paper
Kumaraswamy, M. M., & Chan, D. W. M. (1998). Contributors to construction delays. Construction Management and Economics. https://doi.org/10.1080/014461998372556

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.