Decision-making on Large Infrastructure Projects: The Role of the Dutch Parliament
Abstract
The preparation and implementation of large infrastructure projects present many practical problems. Recent literature has devoted much attention to budget overruns and overestimation of returns, partly in relation to the presence of misinformation. In the Netherlands, the Parliamentary Commission on Infrastructure Projects (TCI) conducted an inquiry into the manner in which two large projects, the Betuwe Railway Line and the HSL Zuid High-Speed Railway link, had been prepared. In its final report, many shortcomings in the decision-making procedures were identified, particularly when seen from the perspective of the Lower House of the Dutch Parliament. The Commission has put forward an assessment framework for large infrastructure projects, intended to allow the Lower House greater influence over the decision-making processes and more control over their implementation. In this contribution, we examine the Commission's findings and identify a number of lessons with a normative character: How can the preparation and implementation of large infrastructure projects be improved? Finally, the relevance of the TCI proposals for countries other than the Netherlands is briefly addressed.
Integrity signals
Registry
Cites
Statistics
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
Table 1 identifies all the issues involved with public sector projects after investigating various projects/samples from Bangladesh, Denmark, Germany, Hong Kong, India, Malaysia, Myanmar, Nigeria, the Netherlands, the OECD, Pakistan, the Philippines, Singapore, South Korea, Sri Lanka, Taiwan, Thailand, and Vietnam.
“Table 1 identifies all the issues involved with public sector projects after investigating various projects/samples from Bangladesh, Denmark, Germany, Hong Kong, India, Malaysia, Myanmar, Nigeria, the Netherlands, the OECD, Pakistan, the Philippines, Singapore, South Korea, Sri Lanka, Taiwan, Thailand, and Vietnam [9,27,34-41].”
From Blockchain Technology: Potential Applications for Public Sector E-Procurement and Project Management (2022) · cites this paper as [40]
A lack of communication between parties is a barrier to a successful project.
“A lack of communication between parties is also a barrier to a successful project [36,37,40].”
From Blockchain Technology: Potential Applications for Public Sector E-Procurement and Project Management (2022) · cites this paper as [40]
Cites
Flyvbjerg, B., Bruzelius, N., & Rothengatter, W. (2003) · Cambridge University Press eBooks · doi:10.1017/cbo9781107050891 · Cited by 2,420 · see citing works
The Anatomy of Major Projects: A Study of the Reality of Project Management
Morris, P. W. G., & Hough, G. H. (1988) · Medical Entomology and Zoology · Cited by 678 · see citing works
Kitamura, R. (2005) · Encyclopedia of Social Measurement · doi:10.1016/b0-12-369398-5/00532-6 · Cited by 329 · see citing works
A Desire Named Streetcar Fantasy and Fact in Rail Transit Planning
Pickrell, D. (1992) · Journal of the American Planning Association · doi:10.1080/01944369208975791 · Cited by 323 · see citing works
Ethics and Advocacy in Forecasting for Public Policy
Wachs, M. (1990) · Business and Professional Ethics Journal · doi:10.5840/bpej199091/215 · Cited by 203 · see citing works
The Channel Tunnel—an ex post economic evaluation
Anguera, R. (2005) · Transportation Research Part A Policy and Practice · doi:10.1016/j.tra.2005.08.009 · Cited by 100 · see citing works
Instrumente parlamentarischer Kontrolle der Exekutive in westlichen DemokratienPreprint
Harfst, P., & Schnapp, K.-U. (2003) · RePEc: Research Papers in Economics · Cited by 21 · see citing works
Spatial-Economic Investment Policy and Urban Regeneration in the Netherlands
Priemus, H. (2002) · Environment and Planning C Government and Policy · doi:10.1068/c0212 · Cited by 11 · see citing works
Self-citation
Flagged first, then by citations
Cited by
Sorted by citations
Blockchain Technology: Potential Applications for Public Sector E-Procurement and Project Management
Khalfan, M., Azizi, N., Haass, O., Maqsood, T., & Ahmed, I. (2022) · Sustainability · doi:10.3390/su14105791 · Cited by 57 · see citing works
“Proper communication: A lack of communication between parties is also a barrier to a successful project [36,37,40].”
Background
- Authors
- Priemus, H.
- Affiliations
- Delft University of Technology (NL)
- Corresponding author
- Priemus, Hugo
- Venue
- Transportation Planning and Technology
- Publisher
- Informa UK Limited
- Published
- 2007-02
- Volume
- 30
- Issue
- 1
- Pages
- 71-93
- ISSN
- 0308-1060 (ISSN-L)
- 1029-0354
- OpenAlex
- W2060311124
- Cited by
- 21
- References
- 8
- Citations by year
- 2024: 1 · 2022: 2 · 2021: 1 · 2020: 1 · 2018: 1 · 2017: 1 · 2015: 3 · 2014: 3 · 2013: 1 · 2012: 2
- FWCI
- 1.43
- Type
- journal article
- Language
- en
- Open access
- closed
- Locations
- Transportation Planning and Technology (publishedVersion)
- RePEc: Research Papers in Economics (submittedVersion)
- Topics
- Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
- Social Sciences › Transportation › transportation and logistics systems
- Social Sciences › Public Administration › Public Policy and Administration Research
- Keywords
- large-scale infrastructure projects, parliamentary decision-making, Dutch parliament, cost overruns, misinformation, lower house, lessons for other countries
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review