Student or educator? Sign up with your school email and get 6 months of Pro free.
Cited by 1,049

The DOI matches its Crossref record; 11 of the 11 references it cites were found in a registry or an index.

Economic Production Cycles with Imperfect Production Processes

Rosenblatt, Meir J., Lee, Hau L.·1986·IIE Transactions

Abstract

In this paper, we study the effects of an imperfect production process on the optimal production cycle time. The system is assumed to deteriorate during the production process and produce some proportion of defective items. The optimal production cycle is derived, and is shown to be shorter than that of the classical Economic Manufacturing Quantity model. The analysis is extended to the case where the defective rate is a function of the set-up cost, for which the set-up cost level and the production cycle time are jointly optimized. Finally, we also consider the case where the deterioration process is dynamic in its nature, i.e., the proportion of defective items is not constant. Both linear, exponential, and multi-state deteriorating processes are studied. Numerical examples are provided to illustrate the derivation of the optimal production cycle time in these situations.

Overview

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1080/07408178608975329

Cites

11 of 11 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Show all 11 references

Cited by

See all 1,049

Metadata

Authors
Rosenblatt, M. J., & Lee, H. L.
Venue
IIE Transactions
Published
1986-03
Volume
18
Issue
1
Pages
48-55
ISSN
  • 0740-817X (ISSN-L)
  • 1545-8830
OpenAlex
W2114173607
Cited by
1,049
References
11
FWCI
8.43
Type
journal article
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Economic Production Cycles with Imperfect Production Processes. https://app.cochat.ai/papers/10.1080/07408178608975329
The paper
Rosenblatt, M. J., & Lee, H. L. (1986). Economic Production Cycles with Imperfect Production Processes. IIE Transactions. https://doi.org/10.1080/07408178608975329

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.