Dynamic model for a defective production system with Poka-Yoke
The DOI matches its Crossref record; 16 of the 16 references it cites were found in a registry or an index.
Abstract
This paper proposes a dynamic model for a defective production system with Poka-Yoke. Poka-Yoke is a Japanese phrase which means mistake-proofing. The technique of Poka-Yoke has been diversely applied in modern production systems. In this study, we evaluate the total cost of a defective production system with Poka-Yoke. We also use a practical case in automotive industry to verify the proposed model. The case study reveals that Poka-Yoke is a cost-effective mechanism that generates satisfactory return of a defective production system, the effect of which depends on the investment cost of Poka-Yoke.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Citations
Cites
Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction
Porteus, E. L. (1986) · Operations Research · doi:10.1287/opre.34.1.137 · Cited by 1,158
Economic Production Cycles with Imperfect Production Processes
Rosenblatt, M. J., & Lee, H. L. (1986) · IIE Transactions · doi:10.1080/07408178608975329 · Cited by 1,049
Economic production quantity model for items with imperfect quality
Salameh, M. K., & Jaber, M. Y. (2000) · International Journal of Production Economics · doi:10.1016/s0925-5273(99)00044-4 · Cited by 1,048
Banker, R. D., Khosla, I., & Sinha, K. K. (1998) · Management Science · doi:10.1287/mnsc.44.9.1179 · Cited by 596
Zero Quality Control: Source Inspection and the Poka-Yoke System
Shingo, S. (1986) · Cited by 574
Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System
Lee, H. L., & Rosenblatt, M. J. (1987) · Management Science · doi:10.1287/mnsc.33.9.1125 · Cited by 416 · cited 1×
“In their subsequent paper, Lee and Rosenblatt(3) considered the use of process inspection during the production run so that the shift to out-of-control state can be detected and restoration made earlier. Tapiero(4) linked optimal quality inspection policies and the resulting improvements in manufacturing costs. Fine(5…”
CHENG, T. C. E. (1991) · IIE Transactions · doi:10.1080/07408179108963838 · Cited by 287
An Empirical Analysis of Productivity and Quality in Software Products
Krishnan, M. S., Kriebel, C. H., Kekre, S., & Mukhopadhyay, T. (2000) · Management Science · doi:10.1287/mnsc.46.6.745.11941 · Cited by 264
Fine, C. H., & Porteus, E. L. (1989) · Operations Research · doi:10.1287/opre.37.4.580 · Cited by 126
A Quality Control Model with Learning Effects
Fine, C. H. (1988) · Operations Research · doi:10.1287/opre.36.3.437 · Cited by 104
Cited by
An integrated model for optimisation of production and quality costs
Abdul‐Kader, W., Ganjavi, O., & Solaiman, A. (2010) · International Journal of Production Research · doi:10.1080/00207540903382881 · Cited by 50
“Tsou and Chen ( 2005 ) studied a dynamic model for a defective production system with mistake-proofing (poka-yoke).”
BackgroundCan disruptive events trigger transitions towards sustainable consumption?
Chiu, A. S. F., Aviso, K. B., Baquillas, J. C., & Tan, R. R. (2020) · Cleaner and Responsible Consumption · doi:10.1016/j.clrc.2020.100001 · Cited by 54
“Developed in 1961 by Dr. Shigco Shingo, poka-yoke involves the use of devices or design, that is, auto-nomation to eliminate mistakes and defects by incorporating “foolproof” steps in the process (Tsou and Chen, 2005; Yui, 1997).”
A Systematic Literature Review of Poka-Yoke and Novel Approach to Theoretical Aspects
Lazarevic, M., Mandic, J., Sremcev, N., Vukelic, D., & Debevec, M. (2019) · Strojniški vestnik – Journal of Mechanical Engineering · doi:10.5545/sv-jme.2019.6056 · Cited by 32
“Tsou and Chen [1] have reported the deformation of the welding fixture in a Yazaki automotive company in Taiwan.”
BackgroundMejoras de Lean Manufacturing en los sistemas productivos
Tejeda, A. S. (2011) · Ciencia y Sociedad · doi:10.22206/cys.2011.v36i2.pp276-310 · Cited by 30
Quality improvement through Poka-Yoke: from engineering design to information system design
Zhang, A. (2014) · International Journal of Six Sigma and Competitive Advantage · doi:10.1504/ijssca.2014.064260 · Cited by 34
Metadata
- Authors
- Tsou, J.-C., & Chen, J.-M.
- Affiliations
- National Central University (TW)
- Corresponding author
- Tsou, J-C
- Venue
- Journal of the Operational Research Society
- Publisher
- Informa UK Limited
- Published
- 2005-07
- Volume
- 56
- Issue
- 7
- Pages
- 799-803
- ISSN
- 0160-5682 (ISSN-L)
- 1476-9360
- OpenAlex
- W2051799412
- Semantic Scholar
- 4f99580f3fa26794f46c3e130badf76c968ba63d
- Cited by
- 32
- References
- 16
- Citations by year
- 2025: 1 · 2024: 1 · 2023: 2 · 2022: 2 · 2021: 4 · 2020: 3 · 2019: 2 · 2018: 1 · 2017: 2 · 2016: 1 · 2014: 3 · 2013: 2 · 2012: 1
- FWCI
- 1.25
- Type
- journal article
- Language
- en
- Open access
- closed
- Locations
- Journal of the Operational Research Society (publishedVersion)
- RePEc: Research Papers in Economics (submittedVersion)
- Topics
- Social Sciences › Business, Management and Accounting › Strategy and Management › Management and Optimization Techniques
- Social Sciences › Business, Management and Accounting › Management Information Systems › Quality and Supply Management
- Social Sciences › Decision Sciences › Management Science and Operations Research › Supply Chain and Inventory Management
- Keywords
- poka-yoke, dynamic model, cost-effectiveness, investment costs, automotive industry, quality control
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Dynamic model for a defective production system with Poka-Yoke. https://app.cochat.ai/papers/10.1057/palgrave.jors.2601877
- The paper
- Tsou, J.-C., & Chen, J.-M. (2005). Dynamic model for a defective production system with Poka-Yoke. Journal of the Operational Research Society. https://doi.org/10.1057/palgrave.jors.2601877
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.