A Risk-based Input–Output Methodology for Measuring the Effects of the August 2003 Northeast Blackout
The DOI matches its Crossref record; 22 of the 22 references it cites were found in a registry or an index.
Abstract
The 2003 Northeast Blackout revealed vulnerabilities within the US electric power-grid system. With the economy so dependent on electric power for most aspects of life, a power-grid failure can have far-reaching higher-order effects and can impair the operability of other critical infrastructures. An inoperability of the power sector can result from different types of disasters (e.g., accidents, natural catastrophe, or willful attacks). This paper demonstrates the Inoperability Input-Output Model (IIM) to measure the financial and inoperability effects of the Northeast Blackout. The case study uses information from sources such as the US input–output tables and sector-specific reports to quantify losses for specific inoperability levels. The IIM estimated losses of the same magnitude as other published reports; however, with a detailed accounting of all affected economic sectors. Finally, a risk management framework is proposed to extend the IIM's capability for evaluating investment options in terms of their implementation costs and loss-reduction potentials.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Input-output analysis foundations and extensions
Miller, R. E., & Blair, P. D. (2009) · Cited by 5,083
Identifying, understanding, and analyzing critical infrastructure interdependencies
(2001) · IEEE Control Systems · doi:10.1109/37.969131 · Cited by 2,851 · cited 1×
“In the case of the 2001 electric power disruptions in California, these effects cost businesses billions of dollars and crippled that state’s defense systems (Rinaldi et al., 2001).”
BackgroundLeontief, W. W. (1951) · Scientific American · doi:10.1038/scientificamerican1051-15 · Cited by 1,492
Rasmussen, P. N., Leontief, W., & Rasmussen, P. N. (1967) · The Swedish Journal of Economics · doi:10.2307/3439124 · Cited by 1,025
Rose, A., & Liao, S.-Y. (2005) · Journal of Regional Science · doi:10.1111/j.0022-4146.2005.00365.x · Cited by 919 · cited 3×
“, changes in demand) has already been expanded to a wide array of applications, including disaster risk management (Rose and Liao, 2005), environmental impact analysis (Cho et al.”
BackgroundMethodThe Structure of American Economy, 1919-1939.
Barna, T., & Leontief, W. W. (1954) · Economica · doi:10.2307/2550364 · Cited by 816
Leontief-Based Model of Risk in Complex Interconnected Infrastructures
Haimes, Y. Y., & Jiang, P. (2001) · Journal of Infrastructure Systems · doi:10.1061/(asce)1076-0342(2001)7:1(1 · Cited by 593 · cited 3×
“The Inoperability Input-Output Model (IIM) (Haimes and Jiang, 2001; Haimes, 2004; Santos and Haimes, 2004) uses published economic data from the Bureau of Economic Analysis (BEA), US Department of Commerce, as well as the electric-power service recovery profiles from Anderson and Geckil (2003).”
BackgroundMethodSelf-citationThe Structure of the American Economy, 1919-1939
Ryan, J. M., & Leontief, W. W. (1952) · Southern Economic Journal · doi:10.2307/1054052 · Cited by 580
Santos, J. R., & Haimes, Y. Y. (2004) · Risk Analysis · doi:10.1111/j.0272-4332.2004.00540.x · Cited by 474 · cited 4×
“The Inoperability Input-Output Model (IIM) (Haimes and Jiang, 2001; Haimes, 2004; Santos and Haimes, 2004) uses published economic data from the Bureau of Economic Analysis (BEA), US Department of Commerce, as well as the electric-power service recovery profiles from Anderson and Geckil (2003).”
BackgroundMethodInfluentialSelf-citationIn Vindication of the Ghosh Model: A Reinterpretation as a Price Model
Dietzenbacher, E. (1997) · Journal of Regional Science · doi:10.1111/0022-4146.00073 · Cited by 449 · cited 2×
“The A matrix is similar to the form of the coefficient matrix for the Ghosh-reinterpreted price model introduced by Dietzenbacher (1997).”
Method
Cited by
Review on modeling and simulation of interdependent critical infrastructure systems
Ouyang, M. (2014) · Reliability Engineering & System Safety · doi:10.1016/j.ress.2013.06.040 · Cited by 1,262
A Survey on Power System Blackout and Cascading Events: Research Motivations and Challenges
Haes Alhelou, H., Hamedani-Golshan, M. E., Njenda, T. C., & Siano, P. (2019) · Energies · doi:10.3390/en12040682 · Cited by 643
Lifelines: The Resilient Infrastructure Opportunity
Hallegatte, S., Rentschler, J., & Rozenberg, J. (2019) · World Bank, Washington, DC eBooks · doi:10.1596/978-1-4648-1430-3 · Cited by 388
Global socio-economic losses and environmental gains from the Coronavirus pandemic
Lenzen, M., Li, M., Malik, A., Pomponi, F., Sun, Y.-Y., Wiedmann, T., Faturay, F., Fry, J., Gallego, B., Geschke, A., et al. (2020) · PLOS ONE · doi:10.1371/journal.pone.0235654 · Cited by 363
A review on resilience assessment of energy systems
Gasser, P., Lustenberger, P., Cinelli, M., Kim, W., Spada, M., Burgherr, P., Hirschberg, S., Stojadinovic, B., & Sun, T. Y. (2021) · Sustainable and Resilient Infrastructure · doi:10.1080/23789689.2019.1610600 · Cited by 199
“…2017; Xu et al., 2007), agent-based modelling (Nan et al., 2013; Nan & Sansavini, 2017; Sun et al., 2015; Vugrin et al., 2011), input-output models (Anderson et al., 2007; Baghersad & Zobel, 2015; He et al., 2017; Leung & Hsu, 1984; MacKenzie & Barker, 2012; Cameron A. MacKenzie et al., 2014; Pant…”
BackgroundResilience and Complexity: A Bibliometric Review and Prospects for Industrial Ecology
Meerow, S., & Newell, J. P. (2015) · Journal of Industrial Ecology · doi:10.1111/jiec.12252 · Cited by 195
“…2 features publications in the resilience-complexity data set (Holling 1973; Hollnagel et al. 2006), as well as research on errors in complex networks (Albert et al. 2000), I-O risk analysis (Anderson et al. 2007), and vulnerability in interconnected urban infrastructure systems (Little 2002).”
Background
Metadata
- Authors
- Anderson, C. W., Santos, J. R., & Haimes, Y. Y.
- Venue
- Economic Systems Research
- Publisher
- Informa UK Limited
- Published
- 2007-06
- Volume
- 19
- Issue
- 2
- Pages
- 183-204
- ISSN
- 0953-5314 (ISSN-L)
- 1469-5758
- OpenAlex
- W2136442637
- Cited by
- 195
- References
- 22
- FWCI
- 20.80
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.