Extent of the use of Lean concepts proposed for a value stream mapping application
The DOI matches its Crossref record; 4 of the 4 references it cites were found in a registry or an index.
Abstract
This article illustrates and analyses the causes for the limited adoption of Lean manufacturing concepts in proposals for the redesign and improvement of productive systems in serial production companies. Research was conducted using multiple case studies in six companies that approached the redesign of their productive systems with a Lean perspective using a technique called value stream mapping (VSM). Future scenarios presented by the research team illustrate that the companies were not exploiting the full potential of the concepts and techniques inherent within Lean philosophy. The main reasons include technical, theoretical and training shortcomings faced by the teams responsible for their implementation. Thus, the article attempts to present the key factors necessary to exploit the full potential of Lean concepts.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Lean manufacturing: context, practice bundles, and performance
Shah, R., & Ward, P. T. (2003) · Journal of Operations Management · doi:10.1016/s0272-6963(02)00108-0 · Cited by 2,897 · cited 3×
“In this respect, Shah and Ward ( 2003 ) as well as Doolen and Hacker ( 2005 ) are acknowledged to be the researchers who identified and classified the inherent practices of Lean production at a dock-to-dock or production facility level.”
BackgroundLean Thinking—Banish Waste and Create Wealth in your Corporation
Womack, J. P., & Jones, D. T. (1997) · Journal of the Operational Research Society · doi:10.1057/palgrave.jors.2600967 · Cited by 2,122
A Study of the Toyota Production System From an Industrial Engineering Viewpoint
Shingo, S., & Bodek, N. (2019) · doi:10.4324/9781315136509 · Cited by 1,064
What actually happened to the inventories of American companies between 1981 and 2000?
Chen, H., Frank, M. Z., & Wu, O. Q. (2005) · Management Science · doi:10.1287/mnsc.1050.0368 · Cited by 396
Cited by
Lean manufacturing: literature review and research issues
Bhamu, J., & Singh Sangwan, K. (2014) · International Journal of Operations & Production Management · doi:10.1108/ijopm-08-2012-0315 · Cited by 983
Critical failure factors of Lean Six Sigma: a systematic literature review
Albliwi, S., Antony, J., Abdul Halim Lim, S., & van der Wiele, T. (2014) · International Journal of Quality & Reliability Management · doi:10.1108/ijqrm-09-2013-0147 · Cited by 508
A Systematic Literature Review on Recent Lean Research: State‐of‐the‐art and Future Directions
Danese, P., Manfè, V., & Romano, P. (2018) · International Journal of Management Reviews · doi:10.1111/ijmr.12156 · Cited by 345
Implementing lean production systems: research areas and opportunities for future studies
Marodin, G. A., & Saurin, T. A. (2013) · International Journal of Production Research · doi:10.1080/00207543.2013.826831 · Cited by 328
Helleno, A. L., de Moraes, A. J. I., & Simon, A. T. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2016.12.072 · Cited by 273
Metadata
- Authors
- Serrano Lasa, I., Castro, R. D., & Laburu, C. O.
- Venue
- Production Planning & Control
- Publisher
- Informa UK Limited
- Published
- 2009-01
- Volume
- 20
- Issue
- 1
- Pages
- 82-98
- ISSN
- 0953-7287 (ISSN-L)
- 1366-5871
- OpenAlex
- W2090634204
- Cited by
- 104
- References
- 4
- FWCI
- 11.29
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.