Lean thinking in the highways construction sector: motivation, implementation and barriers
Open accessThe DOI matches its Crossref record; 134 of the 134 references it cites were found in a registry or an index.
Abstract
The interest in lean thinking in the UK’s civil construction industry is on the rise. The research presented in the paper evaluates the adoption of lean thinking in the highways construction sector by investigating 7 motivation factors, 20 lean techniques and 16 barriers through in-depth interviews with 20 sector managers and a questionnaire survey of 110 responses. The findings show the existence of strong external motivational factors for lean thinking such as clients’ push and companies’ expectation of winning more contracts alongside lean’s operational benefits. Limited adoptions of the lean techniques, mostly in the stepwise process improvement cycle, the Last Planner System and Visual Management, were determined. This raises concerns about ‘pseudo-lean’ practices in the sector. Lack of standardisation, insufficient benefit capturing, insufficient know-how, insufficient control of the entire value stream and limited view to the techniques were found as the top barriers.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
(1993) · Journal of the American Dietetic Association · doi:10.1016/0002-8223(93)91697-o · Cited by 18,154
(2008) · Biostatistics and Microbiology: A Survival Manual · doi:10.1007/978-0-387-77282-0_6 · Cited by 17,371
Qualitative research: Methods in the social sciences: (668352010-001)
(2006) · PsycEXTRA Dataset · doi:10.1037/e668352010-001 · Cited by 10,605
The machine that changed the world
(1992) · Long Range Planning · doi:10.1016/0024-6301(92)90400-v · Cited by 5,805
The Machine That Changed the World
Wolf, B. M. (1991) · Journal of International Business Studies · doi:10.1057/jibs.1991.40 · Cited by 4,717
Toyota production system: beyond large-scale production
Ohno, T., & Rosen, C. B. (1998) · CERN Document Server (European Organization for Nuclear Research) · Cited by 4,522
Organizational research: Determining appropriate sample size in survey research
James, E. B. (2001) · Cited by 4,390
The impact of supply chain integration on performance: A contingency and configuration approach
Flynn, B. B., Huo, B., & Zhao, X. (2010) · Journal of Operations Management · doi:10.1016/j.jom.2009.06.001 · Cited by 3,310
Qualitative Research: Methods in the Social Sciences
(2006) · doi:10.4135/9781483397085 · Cited by 3,149
Lean manufacturing: context, practice bundles, and performance
Shah, R., & Ward, P. T. (2003) · Journal of Operations Management · doi:10.1016/s0272-6963(02)00108-0 · Cited by 2,897 · cited 1×
“There is no agreement in the literature whether there is a difference in the applicability of lean thinking between large organisations and SMEs (Shah and Ward 2003; Achanga et al. 2006; Rose, Deros, and Ab-Rahman 2013).”
Background
Cited by
Procurement 4.0 and its implications on business process performance in a circular economy
Bag, S., Wood, L. C., Mangla, S. K., & Luthra, S. (2020) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2019.104502 · Cited by 339
Metadata
- Authors
- Tezel, A., Koskela, L., & Aziz, Z.
- Venue
- Production Planning & Control
- Publisher
- Informa UK Limited
- Published
- 2017-12-12
- Volume
- 29
- Issue
- 3
- Pages
- 247-269
- ISSN
- 0953-7287 (ISSN-L)
- 1366-5871
- OpenAlex
- W2775795121
- Cited by
- 165
- References
- 134
- FWCI
- 9.29
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.