The interest in lean thinking in the UK’s civil construction industry is on the rise. The research presented in the paper evaluates the adoption of lean thinking in the highways construction sector by investigating 7 motivation factors, 20 lean techniques and 16 barriers through in-depth interviews with 20 sector managers and a questionnaire survey of 110 responses. The findings show the existence of strong external motivational factors for lean thinking such as clients’ push and companies’ expectation of winning more contracts alongside lean’s operational benefits. Limited adoptions of the lean techniques, mostly in the stepwise process improvement cycle, the Last Planner System and Visual Management, were determined. This raises concerns about ‘pseudo-lean’ practices in the sector. Lack of standardisation, insufficient benefit capturing, insufficient know-how, insufficient control of the entire value stream and limited view to the techniques were found as the top barriers.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
(1993) · Journal of the American Dietetic Association · doi:10.1016/0002-8223(93)91697-o · Cited by 18,154
(2008) · Biostatistics and Microbiology: A Survival Manual · doi:10.1007/978-0-387-77282-0_6 · Cited by 17,371
Qualitative research: Methods in the social sciences: (668352010-001)
(2006) · PsycEXTRA Dataset · doi:10.1037/e668352010-001 · Cited by 10,605
The machine that changed the world
(1992) · Long Range Planning · doi:10.1016/0024-6301(92)90400-v · Cited by 5,805
The Machine That Changed the World
Wolf, B. M. (1991) · Journal of International Business Studies · doi:10.1057/jibs.1991.40 · Cited by 4,717
Toyota production system: beyond large-scale production
Ohno, T., & Rosen, C. B. (1998) · CERN Document Server (European Organization for Nuclear Research) · Cited by 4,522
Organizational research: Determining appropriate sample size in survey research
James, E. B. (2001) · Cited by 4,390
The impact of supply chain integration on performance: A contingency and configuration approach
Flynn, B. B., Huo, B., & Zhao, X. (2010) · Journal of Operations Management · doi:10.1016/j.jom.2009.06.001 · Cited by 3,310
Qualitative Research: Methods in the Social Sciences
(2006) · doi:10.4135/9781483397085 · Cited by 3,149
Lean manufacturing: context, practice bundles, and performance
Shah, R., & Ward, P. T. (2003) · Journal of Operations Management · doi:10.1016/s0272-6963(02)00108-0 · Cited by 2,897 · cited 1×
“There is no agreement in the literature whether there is a difference in the applicability of lean thinking between large organisations and SMEs (Shah and Ward 2003; Achanga et al. 2006; Rose, Deros, and Ab-Rahman 2013).”
BackgroundSUGIMORI, Y., KUSUNOKI, K., CHO, F., & UCHIKAWA, S. (1977) · International Journal of Production Research · doi:10.1080/00207547708943149 · Cited by 1,327 · cited 1×
“In parallel with Japan’s successful post-war recovery and emergence as a global economic power, Japanese manufacturing techniques have been benchmarked by Western manufacturers since the 1970s (Drucker 1971; Sugimori et al. 1977).”
MethodResponse Rate in Academic Studies-A Comparative Analysis
Baruch, Y. (1999) · Human Relations · doi:10.1177/001872679905200401 · Cited by 1,112
A Study of the Toyota Production System From an Industrial Engineering Viewpoint
Shingo, S., & Bodek, N. (2019) · doi:10.4324/9781315136509 · Cited by 1,064
Abdulmalek, F. A., & Rajgopal, J. (2007) · International Journal of Production Economics · doi:10.1016/j.ijpe.2006.09.009 · Cited by 1,046
The construction industry as a loosely coupled system: implications for productivity and innovation
Dubois, A., & Gadde, L.-E. (2002) · Construction Management and Economics · doi:10.1080/01446190210163543 · Cited by 1,041 · cited 1×
“…algan tezel a.tezel@hud.ac.uk up of innovation and technology (Koskela 1992; Shirazi, Langford, and Rowlinson 1996; Vrijhoef and Koskela 2000; Dubois and Gadde 2002; Harvey 2003; Green and May 2005; McGuinness and Bennett 2006; Segerstedt and Olofsson 2010; Behera, Mohanty, and Prakash…”
BackgroundCritical success factors for lean implementation within SMEs
Achanga, P., Shehab, E., Roy, R., & Nelder, G. (2006) · Journal of Manufacturing Technology Management · doi:10.1108/17410380610662889 · Cited by 1,008
Journal of Achievements in Materials and Manufacturing Engineering
(2017) · Journal of Achievements of Materials and Manufacturing Engineering · doi:10.5604/17348412 · Cited by 978
Application Areas and Data Requirements for BIM-Enabled Facilities Management
Becerik-Gerber, B., Jazizadeh, F., Li, N., & Calis, G. (2012) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000433 · Cited by 915
The four roles of supply chain management in construction
Vrijhoef, R., & Koskela, L. (2000) · European Journal of Purchasing & Supply Management · doi:10.1016/s0969-7012(00)00013-7 · Cited by 862 · cited 1×
“…as taylor & Francis group CONTACT algan tezel a.tezel@hud.ac.uk up of innovation and technology (Koskela 1992; Shirazi, Langford, and Rowlinson 1996; Vrijhoef and Koskela 2000; Dubois and Gadde 2002; Harvey 2003; Green and May 2005; McGuinness and Bennett 2006; Segerstedt and Olofsson 2010;…”
BackgroundSelf-citationPegels, C. C. (1984) · Japan vs. the West · doi:10.1007/978-94-017-5271-8_8 · Cited by 802
Proceedings of the institution of civil engineers
Athenxum, L. (1844) · Journal of the Franklin Institute · doi:10.1016/s0016-0032(44)90603-4 · Cited by 791
The rhetoric and reality of supply chain integration
Fawcett, S. E., & Magnan, G. M. (2002) · International Journal of Physical Distribution & Logistics Management · doi:10.1108/09600030210436222 · Cited by 722
Interaction of Lean and Building Information Modeling in Construction
Sacks, R., Koskela, L., Dave, B. A., & Owen, R. (2010) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000203 · Cited by 689 · cited 1×
“The application and adaptation of the underlying concepts and principles of lean thinking to construction is referred to as Lean construction (LC) (Sacks et al. 2010).”
BackgroundSelf-citationQuality Improvement Methodologies - PDCA Cycle, RADAR Matrix, DMAIC and DFSS
Pipan, M. (2010) · Journal of Achievements of Materials and Manufacturing Engineering · Cited by 655
Defining lean production: some conceptual and practical issues
Pettersen, J. (2009) · The TQM Journal · doi:10.1108/17542730910938137 · Cited by 642
Lahdenperä, P. (2012) · Construction Management and Economics · doi:10.1080/01446193.2011.648947 · Cited by 606 · cited 2×
“BIM, lean thinking or sustainable construction) to smaller subcontractors (Matthews and Howell 2005; Kent and Becerik-Gerber 2010; Lahdenperä 2012).”
BackgroundMethodThe art(fulness) of open-ended interviewing: some considerations on analysing interviews
Rapley, T. J. (2001) · Qualitative Research · doi:10.1177/146879410100100303 · Cited by 576 · cited 2×
“The primary advantages of open-ended interviews are that they can provide more detailed information on a subject matter than survey studies and their potential to reveal rich-insights for exploratory research (Rapley 2001; Berg 2004).”
BackgroundZero Quality Control: Source Inspection and the Poka-Yoke System
Shingo, S. (1986) · Cited by 574
Shielding Production: Essential Step in Production Control
Ballard, G., & Howell, G. (1998) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1998)124:1(11 · Cited by 510 · cited 1×
“…parameters, a slow take-up of change and fragmented supply chains (Behera, Mohanty, and Prakash 2015), which produce challenges before the diffusion of lean thinking in the industry (Ballard and Howell 1998; Thomas et al. 2002; Johansen and Walter 2007; Viana, Formoso, and Isatto 2017).”
BackgroundJournal of Information Technology in Construction
(2019) · Journal of Information Technology in Construction · doi:10.36680/j.itcon · Cited by 503
The Evolution of a Manufacturing System at Toyota
Fujimoto, T. (1999) · doi:10.1093/oso/9780195123203.001.0001 · Cited by 494
The Evolution of a Manufacturing System at Toyota
Roehl, T., & Fujimoto, T. (2000) · The Academy of Management Review · doi:10.2307/259024 · Cited by 473
Understanding Construction Industry Experience and Attitudes toward Integrated Project Delivery
Kent, D. C., & Becerik-Gerber, B. (2010) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000188 · Cited by 424 · cited 1×
“IPD type relational contracting strategies were found useful in disseminating innovative approaches (i.e. BIM, lean thinking or sustainable construction) to smaller subcontractors (Matthews and Howell 2005; Kent and Becerik-Gerber 2010; Lahdenperä 2012).”
MethodLean Construction: From Theory to Implementation
Salem, O., Solomon, J., Genaidy, A., & Minkarah, I. (2006) · Journal of Management in Engineering · doi:10.1061/(asce)0742-597x(2006)22:4(168 · Cited by 412
The relationship between ISO 14001 and continuous source reduction programs
Kitazawa, S., & Sarkis, J. (2000) · International Journal of Operations & Production Management · doi:10.1108/01443570010304279 · Cited by 387
Engineer-to-order supply chain management: A literature review and research agenda
Gosling, J., & Naim, M. M. (2009) · International Journal of Production Economics · doi:10.1016/j.ijpe.2009.07.002 · Cited by 379
Seth *, D., & Gupta, V. (2005) · Production Planning & Control · doi:10.1080/09537280512331325281 · Cited by 348
New perspectives on construction supply chain integration
Dainty, A. R. J., Millett, S. J., & Briscoe, G. H. (2001) · Supply Chain Management: An International Journal · doi:10.1108/13598540110402700 · Cited by 343
de Sousa, D. C. P., Magalhães, H. F., de Oliveira, E. S., & Albuquerque, U. P. (2019) · Springer Protocols Handbooks · doi:10.1007/978-1-4939-8919-5_5 · Cited by 335
Integrated Project Delivery An Example Of Relational Contracting
Matthews, O., & Howell, G. A. (2005) · Cited by 334
Pull-Driven Scheduling for Pipe-Spool Installation: Simulation of Lean Construction Technique
Tommelein, I. D. (1998) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1998)124:4(279 · Cited by 322 · cited 2×
“In parallel with this attention to lean thinking, its adoption in the construction industry started to be discussed extensively in the early 1990s (Koskela 1992, 1996; Ballard 1997; Tommelein 1998).”
BackgroundEffects of Lean Construction on Sustainability of Modular Homebuilding
Nahmens, I., & Ikuma, L. H. (2011) · Journal of Architectural Engineering · doi:10.1061/(asce)ae.1943-5568.0000054 · Cited by 306
Lean principles, practices, and impacts: a study on small and medium-sized enterprises (SMEs)
Zhou, B. (2016) · Annals of Operations Research · doi:10.1007/s10479-012-1177-3 · Cited by 305 · cited 2×
“subcontractors in terms of their lean thinking implementations and barrier perceptions, which is in many ways similar to findings from other industries (Dora, Kumar, and Gellynck 2016; Hu et al. 2016; Manfredsson 2016; Zhou 2016).”
ResultConstruction supply chain integration: an elusive goal?
Briscoe, G., & Dainty, A. (2005) · Supply Chain Management: An International Journal · doi:10.1108/13598540510612794 · Cited by 303
Lean manufacturing in developing countries: evidence from Indian SMEs
Panizzolo, R., Garengo, P., Sharma, M. K., & Gore, A. (2012) · Production Planning & Control · doi:10.1080/09537287.2011.642155 · Cited by 290 · cited 1×
“Unlike some other industries (Storch and Lim 1999; Yusuf and Adeleye 2002; Achanga et al. 2006; Wilson and Roy 2009; Hodge et al. 2011; Panizzolo et al. 2012; Lyons et al. 2013; Martínez-Jurado and Moyano-Fuentes 2014), broader empirical research, investigating the adoption of lean thinking in…”
BackgroundLean healthcare: review, classification and analysis of literature
Costa, L. B. M., & Godinho Filho, M. (2016) · Production Planning & Control · doi:10.1080/09537287.2016.1143131 · Cited by 271
Lean construction: arenas of enactment, models of diffusion and the meaning of ‘leanness’
Green, S. D., & May, S. C. (2005) · Building Research & Information · doi:10.1080/09613210500285106 · Cited by 261 · cited 6×
“…of innovation and technology (Koskela 1992; Shirazi, Langford, and Rowlinson 1996; Vrijhoef and Koskela 2000; Dubois and Gadde 2002; Harvey 2003; Green and May 2005; McGuinness and Bennett 2006; Segerstedt and Olofsson 2010; Behera, Mohanty, and Prakash 2015; Viana, Formoso, and Isatto 2017;…”
BackgroundMethodInfluentialDeterminants and barriers to lean implementation in food-processing SMEs – a multiple case analysis
Dora, M., Kumar, M., & Gellynck, X. (2016) · Production Planning & Control · doi:10.1080/09537287.2015.1050477 · Cited by 251 · cited 2×
“…fuelled a debate in both the practitioner and academic communities concerning the applicability of the lean approach outside discrete, repetitive industries (Oppenheim 2011; Lyons et al. 2013; Costa and Godinho Filho 2016; Dora, Kumar, and Gellynck 2016; Colicchia, Creazza, and Dallari 2017).”
BackgroundResultImproving construction supply chain collaboration and performance: a lean construction pilot project
Erik Eriksson, P. (2010) · Supply Chain Management: An International Journal · doi:10.1108/13598541011068323 · Cited by 246 · cited 3×
“…le d ka nb an s Su gi m or i e t a l. (1 97 7) a nd M uk ho pa dh ya y an d Sh an ke r ( 20 05 ) to m m el ei n (1 99 8) , a rb ul u, B al la rd , a nd H ar pe r ( 20 03 ) a nd K o an d Ku o (2 01 5) (C on tin ue d) relationships, teamwork and partnering among supply chain actors (Eriksson 2010).”
BackgroundMethodLean practices and their effect on performance: a literature review
Negrão, L. L. L., Godinho Filho, M., & Marodin, G. (2016) · Production Planning & Control · doi:10.1080/09537287.2016.1231853 · Cited by 243
5S use in manufacturing plants: contextual factors and impact on operating performance
Bayo‐Moriones, A., Bello–Pintado, A., & de Cerio, J. M. D. (2010) · International Journal of Quality & Reliability Management · doi:10.1108/02656711011014320 · Cited by 236
The just-in-time philosophy: A literature review
GOLHAR, D. Y., & STAMM, C. L. (1991) · International Journal of Production Research · doi:10.1080/00207549108930094 · Cited by 230
Reducing Variability to Improve Performance as a Lean Construction Principle
Thomas, H. R., Horman, M. J., de Souza, U. E. L., & Završki, I. (2002) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2002)128:2(144 · Cited by 223 · cited 2×
“The construction industry is shaped by low-entrance barriers and low-profit margins, temporary production configurations exposed to many uncontrollable parameters, a slow take-up of change and fragmented supply chains (Behera, Mohanty, and Prakash 2015), which produce challenges before the diffusion of lean thinking i…”
BackgroundSupply chains in the construction industry
Segerstedt, A., & Olofsson, T. (2010) · Supply Chain Management: An International Journal · doi:10.1108/13598541011068260 · Cited by 223 · cited 1×
“…(Koskela 1992; Shirazi, Langford, and Rowlinson 1996; Vrijhoef and Koskela 2000; Dubois and Gadde 2002; Harvey 2003; Green and May 2005; McGuinness and Bennett 2006; Segerstedt and Olofsson 2010; Behera, Mohanty, and Prakash 2015; Viana, Formoso, and Isatto 2017; Zegarra and Alarcon 2017).”
BackgroundApplication of lean visual process management tools
Parry, G. C., & Turner, C. E. (2006) · Production Planning & Control · doi:10.1080/09537280500414991 · Cited by 219
Adapting lean manufacturing principles to the textile industry
Hodge, G. L., Goforth Ross, K., Joines, J. A., & Thoney, K. (2011) · Production Planning & Control · doi:10.1080/09537287.2010.498577 · Cited by 218 · cited 4×
“Unlike some other industries (Storch and Lim 1999; Yusuf and Adeleye 2002; Achanga et al. 2006; Wilson and Roy 2009; Hodge et al. 2011; Panizzolo et al. 2012; Lyons et al. 2013; Martínez-Jurado and Moyano-Fuentes 2014), broader empirical research, investigating the adoption of lean thinking in different supply chains…”
BackgroundInfluentialYusuf, Y. Y., & Adeleye, E. O. (2002) · International Journal of Production Research · doi:10.1080/00207540210157141 · Cited by 212 · cited 1×
“Unlike some other industries (Storch and Lim 1999; Yusuf and Adeleye 2002; Achanga et al. 2006; Wilson and Roy 2009; Hodge et al. 2011; Panizzolo et al. 2012; Lyons et al. 2013; Martínez-Jurado and Moyano-Fuentes 2014), broader empirical research, investigating the adoption of lean thinking in…”
BackgroundOgunbiyi, O., Goulding, J. S., & Oladapo, A. (2014) · Construction Innovation · doi:10.1108/ci-08-2012-0045 · Cited by 200 · cited 1×
“…and aspirations towards building a positive publicity/image of the company were found important (Green 1999; Alarcon and Seguel 2002; Almeida and Salazar 2003; Barros Neto and Alves 2007; Mossman 2009; Arbulu and Zabelle 2006; McGraw-Hill Construction 2013; Ogunbiyi, Goulding, and Oladapo 2014).”
BackgroundUnderstanding Construction Supply Chain Management
Behera, P., Mohanty, R. P., & Prakash, A. (2015) · Production Planning & Control · doi:10.1080/09537287.2015.1045953 · Cited by 194 · cited 2×
“…(Koskela 1992; Shirazi, Langford, and Rowlinson 1996; Vrijhoef and Koskela 2000; Dubois and Gadde 2002; Harvey 2003; Green and May 2005; McGuinness and Bennett 2006; Segerstedt and Olofsson 2010; Behera, Mohanty, and Prakash 2015; Viana, Formoso, and Isatto 2017; Zegarra and Alarcon 2017).”
BackgroundLean Construction: Where Are We and How To Proceed?
Bertelsen, S. (2004) · Lean Construction Journal · doi:10.60164/55h8g4h8c · Cited by 192 · cited 2×
“The need for integrating design and construction for an extensive deployment of lean thinking in the construction industry has been frequently underlined (Freire and Alarcón 2002; Bertelsen 2004; Jorgensen and Emmitt 2009).”
BackgroundProceedings for the 14th Annual Conference in the International Group for Lean Construction
Sacks, R., & Bertelsen, S. (2006) · Cited by 186
Seth, D., Seth, N., & Dhariwal, P. (2017) · Production Planning & Control · doi:10.1080/09537287.2017.1300352 · Cited by 185 · cited 3×
“This assertion is further justified by the fact that the adoption of even some fundamental lean techniques like Value Stream Mapping (VSM) (Seth, Seth, and Dhariwal 2017) has remained scarce in the sector.”
BackgroundInfluentialLean production: A study of application in a traditional manufacturing environment
Bamber, L., & Dale, B. G. (2000) · Production Planning & Control · doi:10.1080/095372800232252 · Cited by 175 · cited 1×
“…Filho, and Marodin 2017), (4) pull-based production planning and control (Slomp, Bokhorst, and Germs 2009; Zegarra and Alarcon 2017), (5) just-in-time delivery of materials and components (Bamber and Dale 2000; Chiarini 2017), and (6) instilling a continuous improvement culture (Lyons et al. 2013).”
BackgroundProcess of Innovation in Construction Firm
Tatum, C. B. (1987) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1987)113:4(648 · Cited by 174 · cited 1×
“However, as underlined by Tatum (1987), construction project teams can be viewed as ‘skunk work’ organisations that have autonomy to innovate.”
BackgroundLean production and the Internet
Bruun, P., & Mefford, R. N. (2004) · International Journal of Production Economics · doi:10.1016/j.ijpe.2003.10.007 · Cited by 170
Lost in transition: the transfer of lean manufacturing to construction
Jørgensen, B., & Emmitt, S. (2008) · Engineering, Construction and Architectural Management · doi:10.1108/09699980810886874 · Cited by 169
A framework for assessing the use of lean production practices in manufacturing cells
Saurin, T. A., Marodin, G. A., & Ribeiro, J. L. D. (2011) · International Journal of Production Research · doi:10.1080/00207543.2010.482567 · Cited by 165
Development of Lean Model for House Construction Using Value Stream Mapping
Yu, H., Tweed, T., Al-Hussein, M., & Nasseri, R. (2009) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2009)135:8(782 · Cited by 165
Herron, C., & Braiden, P. M. (2006) · International Journal of Production Economics · doi:10.1016/j.ijpe.2005.10.004 · Cited by 165
Fearne, A., & Fowler, N. (2006) · Supply Chain Management: An International Journal · doi:10.1108/13598540610671725 · Cited by 160 · cited 1×
“…for inherently being too process focused neglecting the supply chain dynamics and for superficial implementations in some lean techniques like the Last Planner System (Green 1999, 2002; Green and May 2005; Fearne and Fowler 2006; Jorgensen and Emmitt 2008; Eriksson 2010; Daniel et al. 2017).”
MethodSequences in the implementation of lean production
Åhlström, P. (1998) · European Management Journal · doi:10.1016/s0263-2373(98)00009-7 · Cited by 158
APPLICATION OF LEAN MANUFACTURING PRINCIPLES TO CONSTRUCTION
Salem, O., & Zimmer, E. R. (2005) · Lean Construction Journal · doi:10.60164/40g1a6i4g · Cited by 158
Achieving Lean Design Process: Improvement Methodology
Freire, J., & Alarcón, L. F. (2002) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2002)128:3(248 · Cited by 154 · cited 1×
“The need for integrating design and construction for an extensive deployment of lean thinking in the construction industry has been frequently underlined (Freire and Alarcón 2002; Bertelsen 2004; Jorgensen and Emmitt 2009).”
Background(2023) · Lean Construction Journal · doi:10.60164/03h8b4a8m · Cited by 141
Lean Construction: Prospects for the German construction industry
Johansen, E., & Walter, L. (2007) · Lean Construction Journal · doi:10.60164/87b3c5e5g · Cited by 139 · cited 1×
“…parameters, a slow take-up of change and fragmented supply chains (Behera, Mohanty, and Prakash 2015), which produce challenges before the diffusion of lean thinking in the industry (Ballard and Howell 1998; Thomas et al. 2002; Johansen and Walter 2007; Viana, Formoso, and Isatto 2017).”
BackgroundNahmens, I., & Ikuma, L. H. (2009) · Lean Construction Journal · doi:10.60164/a2g0h2d4b · Cited by 139
Moving from lean manufacturing to lean construction: Toward a common sociotechnological framework
Paez, O., Salem, S., Solomon, J., & Genaidy, A. M. (2005) · Human Factors and Ergonomics in Manufacturing & Service Industries · doi:10.1002/hfm.20023 · Cited by 138
Critical success factors of web-based supply-chain management systems: an exploratory study
Ngai, E. W. T., Cheng, T. C. E., & Ho, S.-M. S. (2004) · Production Planning & Control · doi:10.1080/09537280412331283928 · Cited by 137 · cited 1×
“…project has been divided into production areas and each subcontractor has been colour-coded. the last Planner System is called the collaborative Planning System in the u.K. respondents, its cost effectiveness and for a higher generalisability of results (Ngai, Cheng, and Ho 2004; Yang and Wu 2009).”
BackgroundLean Transformation in a Modular Building Company: A Case for Implementation
Yu, H., Al‐Hussein, M., Al-Jibouri, S. H. S., & Telyas, A. (2011) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000115 · Cited by 136
Improving Work Flow Reliability
Ballard, G. (1999) · Cited by 134
Applying lean thinking in the food supply chains: a case study
Vlachos, I. (2015) · Production Planning & Control · doi:10.1080/09537287.2015.1049238 · Cited by 121 · cited 2×
“Lean thinking deployments are affected by industry characteristics (Storch and Lim 1999; Lyons et al. 2013; Vlachos 2015) and the construction industry possesses its”
BackgroundDeveloping an understanding of lean thinking in process industries
Lyons, A. C., Vidamour, K., Jain, R., & Sutherland, M. (2013) · Production Planning & Control · doi:10.1080/09537287.2011.633576 · Cited by 118 · cited 8×
“Although the diffusion of lean thinking had started in discrete manufacturing industries in the West in the 1980s, the publication of a business book, ‘The machine that changed the world’ by Womack, Jones, and Roos (1990), fuelled a debate in both the practitioner and academic communities concerning the applicability…”
BackgroundInfluentialColicchia, C., Creazza, A., & Dallari, F. (2017) · Production Planning & Control · doi:10.1080/09537287.2017.1282642 · Cited by 116 · cited 2×
“…fuelled a debate in both the practitioner and academic communities concerning the applicability of the lean approach outside discrete, repetitive industries (Oppenheim 2011; Lyons et al. 2013; Costa and Godinho Filho 2016; Dora, Kumar, and Gellynck 2016; Colicchia, Creazza, and Dallari 2017).”
BackgroundSlomp, J., Bokhorst, J. A. C., & Germs, R. (2009) · Production Planning & Control · doi:10.1080/09537280903086164 · Cited by 114 · cited 1×
“…the production and process elements (Storch and Lim 1999; Negrão, Godinho Filho, and Marodin 2017), (4) pull-based production planning and control (Slomp, Bokhorst, and Germs 2009; Zegarra and Alarcon 2017), (5) just-in-time delivery of materials and components (Bamber and Dale 2000; Chiarini…”
BackgroundLean for Systems Engineering with Lean Enablers for Systems Engineering
Oppenheim, B. W. (2011) · Wiley eBooks · doi:10.1002/9781118063996 · Cited by 114 · cited 2×
“According to Oppenheim (2011) and Oehmen et al. (2012), to successfully implement lean in complex systems like construction projects, (1) managers must treat people as important assets, (2) strive to maximise the project value, (3) optimise the value stream, (4) create a project flow, (5) create…”
BackgroundThe Guide to Lean Enablers for Managing Engineering Programs
Oehmen, J., Oppenheim, B. W., Secor, D., Norman, E. S., Rebentisch, E., Sopko, J., Steuber, M., Dove, R., Moghaddam, K., McNeal, S., et al. (2012) · DSpace@MIT (Massachusetts Institute of Technology) · Cited by 108
Key determinants of lean production adoption: evidence from the aerospace sector
Martínez‐Jurado, P. J., & Moyano‐Fuentes, J. (2012) · Production Planning & Control · doi:10.1080/09537287.2012.692170 · Cited by 105 · cited 1×
“…(Storch and Lim 1999; Yusuf and Adeleye 2002; Achanga et al. 2006; Wilson and Roy 2009; Hodge et al. 2011; Panizzolo et al. 2012; Lyons et al. 2013; Martínez-Jurado and Moyano-Fuentes 2014), broader empirical research, investigating the adoption of lean thinking in different supply chains of the…”
BackgroundExtent of the use of Lean concepts proposed for a value stream mapping application
Serrano Lasa, I., Castro, R. D., & Laburu, C. O. (2009) · Production Planning & Control · doi:10.1080/09537280802685322 · Cited by 104 · cited 1×
“…Tomašević, and Stevenson 2017), (2) effective management of the value stream and establishing longterm alliances with the supply chain (Serrano Lasa, Castro, and Laburu 2009; Colicchia, Creazza, and Dallari 2017), (3) maintaining a continuous and reliable flow of the production and process…”
BackgroundA framework for assessing poka-yoke devices
Saurin, T. A., Ribeiro, J. L. D., & Vidor, G. (2012) · Journal of Manufacturing Systems · doi:10.1016/j.jmsy.2012.04.001 · Cited by 99
Organizational structures in the construction industry
Shirazi, B., Langford, D. A., & Rowlinson, S. (1996) · Construction Management and Economics · doi:10.1080/014461996373467 · Cited by 97 · cited 1×
“…2017 informa uK limited, trading as taylor & Francis group CONTACT algan tezel a.tezel@hud.ac.uk up of innovation and technology (Koskela 1992; Shirazi, Langford, and Rowlinson 1996; Vrijhoef and Koskela 2000; Dubois and Gadde 2002; Harvey 2003; Green and May 2005; McGuinness and Bennett…”
BackgroundDaniel, E. I., Pasquire, C., Dickens, G., & Ballard, H. G. (2017) · Engineering Construction & Architectural Management · doi:10.1108/ecam-07-2015-0109 · Cited by 97 · cited 6×
“For the past 10 years, the civil construction sector in the country has been increasingly adopting lean thinking in its operations with explicit requirements from the main public clients (Wolbers et al. 2005; Ansell et al. 2007; Chen et al. 2012; Drysdale 2013; Fullalove 2013; Daniel et al. 2017).”
BackgroundMethodResultInfluentialLean principles in industrialized housing production: the need for a cultural change
Höök, M., & Stehn, L. (2008) · Lean Construction Journal · doi:10.60164/03a3c4g7c · Cited by 96
Defining and Categorizing Modules in Building Projects: An International Perspective
Gosling, J., Pero, M. E. P., Schoenwitz, M., TOWILL, D. R., & Cigolini, R. (2016) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001181 · Cited by 95 · cited 1×
“…associated practices have already been on the agenda of the supply chain actors, due to various other reasons like the U.K. Government’s BIM mandate on construction companies (Gledson and Greenwood 2016) or the main clients’ notable attention to off-site/modular construction (Gosling et al. 2016).”
BackgroundInvestigating the integration of design and construction from a “lean” perspective
Jørgensen, B. H., & Emmitt, S. (2009) · Construction Innovation · doi:10.1108/14714170910950849 · Cited by 93
Improving flow to achieve lean manufacturing in shipbuilding
Storch, R. L., & Lim, S.-G. (1999) · Production Planning & Control · doi:10.1080/095372899233280 · Cited by 90 · cited 3×
“…and Laburu 2009; Colicchia, Creazza, and Dallari 2017), (3) maintaining a continuous and reliable flow of the production and process elements (Storch and Lim 1999; Negrão, Godinho Filho, and Marodin 2017), (4) pull-based production planning and control (Slomp, Bokhorst, and Germs 2009;…”
BackgroundModelling manufacturing evolution: thoughts on sustainable industrial development
Baldwin, J. S., Allen, P. M., Winder, B., & Ridgway, K. (2004) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2004.04.009 · Cited by 85 · cited 2×
“…n th in ki ng b et w ee n th e tw o gr ou ps o f c om pa ni es re je ct ed . shallow, partial or selective lean thinking implementations, particularly at the earlier stages of a lean transformation, are sometimes classified as ‘pseudo-lean’ (McCarthy et al. 1997; Baldwin et al. 2005; Dalal 2010).”
BackgroundDevelopment of a framework for lean manufacturing systems
Anand, G., & Kodali, R. (2009) · International Journal of Services and Operations Management · doi:10.1504/ijsom.2009.025121 · Cited by 84 · cited 1×
“Further, some researchers believe lean thinking should be applied fully at SMEs, while others claim partial or selective implementations should be acceptable and will yield gradual performance improvements at SMEs (Golicic and Medland 2007; Anand and Kodali 2009).”
BackgroundVisual Management in Brazilian Construction Companies: Taxonomy and Guidelines for Implementation
Tezel, A., Koskela, L., Tzortzopoulos, P., Formoso, C. T., & Alves, T. D. C. L. (2015) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000354 · Cited by 83
Self-citationWork Structuring to Achieve Integrated Product–Process Design
Tsao, C. C. Y., Tommelein, I. D., Swanlund, E. S., & Howell, G. A. (2004) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2004)130:6(780 · Cited by 81
The development of constructs of program context and program success: A qualitative study
Shao, J., & Müller, R. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2011.02.003 · Cited by 78 · cited 2×
“Particular attention was given to interviewing managers from all the supply chain roles, from the client (HE) to SMEs, in order to capture more complete picture of the issue, which is as an important aspect for interview reliability (Miles and Huberman 1994; Shao and Müller 2011).”
BackgroundMethodGreen, S. D. (2002) · Journal of Restructuring Finance · doi:10.1142/s1609945102000114 · Cited by 74 · cited 17×
“Barros Neto and Alves (2007) noted from their analysis of Brazilian construction companies that construction companies often start implementing lean thinking with a few lean techniques, the most common of which is the Last Planner System.”
MethodInfluentialOn the meaning of ‘Waste’: review and definition
Thürer, M., Tomašević, I., & Stevenson, M. (2017) · Production Planning & Control · doi:10.1080/09537287.2016.1264640 · Cited by 71 · cited 1×
“Those underlying concepts and principles are (1) elimination of the process wastes (Hodge et al. 2011; Thürer, Tomašević, and Stevenson 2017), (2) effective management of the value stream and establishing longterm alliances with the supply chain (Serrano Lasa, Castro, and Laburu 2009; Colicchia,…”
BackgroundMAKING FORMWORK CONSTRUCTION LEAN
Ko, C., & Kuo, J.-D. (2015) · Journal of Civil Engineering and Management · doi:10.3846/13923730.2014.890655 · Cited by 71
Enabling lean procurement: a consolidation model for small‐ and medium‐sized enterprises
Wilson, M. M. J., & Roy, R. N. (2009) · Journal of Manufacturing Technology Management · doi:10.1108/17410380910975096 · Cited by 70 · cited 1×
“Unlike some other industries (Storch and Lim 1999; Yusuf and Adeleye 2002; Achanga et al. 2006; Wilson and Roy 2009; Hodge et al. 2011; Panizzolo et al. 2012; Lyons et al. 2013; Martínez-Jurado and Moyano-Fuentes 2014), broader empirical research, investigating the adoption of lean thinking in…”
BackgroundSurveying the extent and use of 4D BIM in the UK
Gledson, B., & Greenwood, D. J. (2016) · Journal of Information Technology in Construction · Cited by 68
Textile management enabled by lean thinking: a case study of textile SMEs
Manfredsson, P. (2016) · Production Planning & Control · doi:10.1080/09537287.2016.1165299 · Cited by 66 · cited 2×
“subcontractors in terms of their lean thinking implementations and barrier perceptions, which is in many ways similar to findings from other industries (Dora, Kumar, and Gellynck 2016; Hu et al. 2016; Manfredsson 2016; Zhou 2016).”
ResultVisual Management in Mid-sized Construction Design Projects
Tjell, J., & Bosch‐Sijtsema, P. M. (2015) · Procedia Economics and Finance · doi:10.1016/s2212-5671(15)00167-7 · Cited by 62
Building a manufacturing cladogram
McCarthy, I. P., Leseure, M., Ridgway, K., & Fieller, N. (1997) · International Journal of Technology Management · doi:10.1504/ijtm.1997.001664 · Cited by 61 · cited 2×
“…n th in ki ng b et w ee n th e tw o gr ou ps o f c om pa ni es re je ct ed . shallow, partial or selective lean thinking implementations, particularly at the earlier stages of a lean transformation, are sometimes classified as ‘pseudo-lean’ (McCarthy et al. 1997; Baldwin et al. 2005; Dalal 2010).”
BackgroundRapid changeover – a pre‐requisite for responsive manufacture
Mileham, A. R., Culley, S. J., Owen, G. W., et al. (1999) · International Journal of Operations & Production Management · doi:10.1108/01443579910274383 · Cited by 59
Operational autonomy explains the value of group work in both lean and reflective production
Schuring, R. W. (1996) · International Journal of Operations & Production Management · doi:10.1108/01443579610197120 · Cited by 58
Visual management in highways construction and maintenance in England
Tezel, A., & Aziz, Z. (2017) · Engineering Construction & Architectural Management · doi:10.1108/ecam-02-2016-0052 · Cited by 57 · cited 15×
“Consultants as external actors also acknowledged that although there are efforts for the implementation of some lean techniques, such as the PDCA process improvement and problem solving cycle, the Last Planner System or Visual Management, the lack of know-how is a challenge in the supply chain.”
BackgroundMethodInfluentialSelf-citationDynamic analysis of a lean cell under uncertainty
Deif, A. M. (2011) · International Journal of Production Research · doi:10.1080/00207543.2011.556154 · Cited by 50
Murata, K., & Katayama, H. (2009) · International Journal of Production Research · doi:10.1080/00207540802687471 · Cited by 50
Kanban implementation at a tyre manufacturing plant: a case study
*, S. K. M., & Shanker, S. (2005) · Production Planning & Control · doi:10.1080/09537280500121778 · Cited by 49
Alaya, L. B. F. B. (2016) · Production Planning & Control · doi:10.1080/09537287.2016.1165305 · Cited by 49
Maturity and maturity models in lean construction
Nesensohn, C., Bryde, D., Ochieng, E. G., & Fearon, D. J. (2014) · Construction Economics and Building · doi:10.5130/ajceb.v14i1.3641 · Cited by 49 · cited 2×
“Also, Tier 1s and large subcontractors are monitored by HE for their lean maturity (Nesensohn et al. 2015).”
BackgroundLean Homebuilding: Lessons Learned from a Precast Concrete Panelizer
Nahmens, I., & Mullens, M. A. (2011) · Journal of Architectural Engineering · doi:10.1061/(asce)ae.1943-5568.0000037 · Cited by 48
Projects as the content and process of change: The case of the health and safety laboratory
Winch, G., Meunier, M.-C., Head, J., & Russ, K. (2011) · International Journal of Project Management · doi:10.1016/j.ijproman.2011.06.005 · Cited by 48 · cited 2×
“…some LC techniques and (7) companies’ competitors are also implementing some LC techniques and consequently, companies do not want to lag behind. obtain relevant results when investigating innovative, emerging or niche phenomena (Stanworth 2012; Winch et al. 2012; Shishank and Dekkers 2013).”
BackgroundViana, D. D., Formoso, C. T., & Isatto, E. L. (2016) · Production Planning & Control · doi:10.1080/09537287.2016.1233360 · Cited by 47 · cited 2×
“…(Koskela 1992; Shirazi, Langford, and Rowlinson 1996; Vrijhoef and Koskela 2000; Dubois and Gadde 2002; Harvey 2003; Green and May 2005; McGuinness and Bennett 2006; Segerstedt and Olofsson 2010; Behera, Mohanty, and Prakash 2015; Viana, Formoso, and Isatto 2017; Zegarra and Alarcon 2017).”
BackgroundMcGuinness, S., & Bennett, J. (2006) · The International Journal of Human Resource Management · doi:10.1080/09585190500405538 · Cited by 44 · cited 1×
“…and technology (Koskela 1992; Shirazi, Langford, and Rowlinson 1996; Vrijhoef and Koskela 2000; Dubois and Gadde 2002; Harvey 2003; Green and May 2005; McGuinness and Bennett 2006; Segerstedt and Olofsson 2010; Behera, Mohanty, and Prakash 2015; Viana, Formoso, and Isatto 2017; Zegarra and Alarcon…”
BackgroundPotential of Poka-Yoke Devices to Reduce Variability in Construction
dos Santos, A., & Powell, J. A. (1999) · Cited by 42
Yang, H. E., & Wu, C. C. (2009) · Production Planning & Control · doi:10.1080/09537280902843755 · Cited by 39 · cited 1×
“…project has been divided into production areas and each subcontractor has been colour-coded. the last Planner System is called the collaborative Planning System in the u.K. respondents, its cost effectiveness and for a higher generalisability of results (Ngai, Cheng, and Ho 2004; Yang and Wu 2009).”
BackgroundManufacturing knowledge management strategy
Shaw, D., & Edwards, J. S. (2006) · International Journal of Production Research · doi:10.1080/00207540500431339 · Cited by 37
Outsourcing: decision-making methods and criteria during design and engineering
Shishank, S., & Dekkers, R. (2012) · Production Planning & Control · doi:10.1080/09537287.2011.648544 · Cited by 35 · cited 1×
“…some LC techniques and (7) companies’ competitors are also implementing some LC techniques and consequently, companies do not want to lag behind. obtain relevant results when investigating innovative, emerging or niche phenomena (Stanworth 2012; Winch et al. 2012; Shishank and Dekkers 2013).”
BackgroundImplementing Lean in Construction: How to Succeed
Arbulu, R., & Zabelle, T. R. (2006) · Cited by 35
Lean for Systems Engineering with Lean Enablers for Systems Engineering
Oppenheim, B. W. (2011) · Cited by 35
Human Factors and Ergonomics in Manufacturing & Service Industries
(2006) · Human Factors and Ergonomics in Manufacturing & Service Industries · doi:10.1002/(issn)1520-6564 · Cited by 29
Migita, R., Yoshida, H., Rutman, L., & Woodward, G. (2018) · The Pediatric clinics of North America · doi:10.1016/j.pcl.2018.07.011 · Cited by 22
Hu, Q. H., Williams, S., Mason, R., & Found, P. A. (2016) · Production Planning & Control · doi:10.1080/09537287.2016.1165303 · Cited by 22 · cited 2×
“subcontractors in terms of their lean thinking implementations and barrier perceptions, which is in many ways similar to findings from other industries (Dora, Kumar, and Gellynck 2016; Hu et al. 2016; Manfredsson 2016; Zhou 2016).”
ResultA lean strategy to performance measurement – reducing waste by measuring 'next' customer needs
Leong, M. S., & Tilley, P. (2008) · University of Southern Queensland ePrints (University of Southern Queensland) · Cited by 21
Variability propagation in the production planning and control mechanism of construction projects
Zegarra, O., & Alarcón, L. F. (2017) · Production Planning & Control · doi:10.1080/09537287.2017.1304588 · Cited by 19 · cited 2×
“…(Koskela 1992; Shirazi, Langford, and Rowlinson 1996; Vrijhoef and Koskela 2000; Dubois and Gadde 2002; Harvey 2003; Green and May 2005; McGuinness and Bennett 2006; Segerstedt and Olofsson 2010; Behera, Mohanty, and Prakash 2015; Viana, Formoso, and Isatto 2017; Zegarra and Alarcon 2017).”
BackgroundDeep supply relationships: influencing outcomes by managing supply service quality
Stanworth, J. O. (2012) · Production Planning & Control · doi:10.1080/09537287.2011.640054 · Cited by 14 · cited 2×
“…some LC techniques and (7) companies’ competitors are also implementing some LC techniques and consequently, companies do not want to lag behind. obtain relevant results when investigating innovative, emerging or niche phenomena (Stanworth 2012; Winch et al. 2012; Shishank and Dekkers 2013).”
BackgroundLean Construction – 2000 to 2006
Alves, T. D. C. L., & Tsao, C. C. Y. (2007) · Lean Construction Journal · doi:10.60164/i2i3a5a8h · Cited by 14
Mariz, R. N., Picchi, F. A., Granja, A. D., & de Melo, R. S. S. (2013) · Journal of Engineering Project and Production Management · doi:10.32738/jeppm.201301.0006 · Cited by 5
Cited by
Procurement 4.0 and its implications on business process performance in a circular economy
Bag, S., Wood, L. C., Mangla, S. K., & Luthra, S. (2020) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2019.104502 · Cited by 339
Metadata
- Authors
- Tezel, A., Koskela, L., & Aziz, Z.
- Venue
- Production Planning & Control
- Publisher
- Informa UK Limited
- Published
- 2017-12-12
- Volume
- 29
- Issue
- 3
- Pages
- 247-269
- ISSN
- 0953-7287 (ISSN-L)
- 1366-5871
- OpenAlex
- W2775795121
- Cited by
- 165
- References
- 134
- FWCI
- 9.29
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.