The DOI matches its Crossref record; 4 of the 4 references it cites were found in a registry or an index.
Project Risk Management Using the Project Risk FMEA
Abstract
:Identifying and mitigating project risks are crucial steps in managing successful projects. This article proposes the extension of the Failure Mode and Effects Analysis (FMEA) format to quantify and analyze project risks. The new technique is labeled the project risk FMEA (RFMEA). The RFMEA is a modification of the well-known process, product, and service FMEA technique. In order to use the FMEA format for projects, the detection value of the standard FMEA is modified slightly for use in the project environment. The new approach is illustrated in a case study from the electronics industry. By adding the detection value to the risk quantification process, another measure beyond the typical risk score is made available to the project team. The benefits of the RFMEA include an increased focus on the most imminent risks, prioritizing risk contingency planning, improved team participation in the risk management process, and development of improved risk controls.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
A guide to the project management body of knowledge (PMBOK guide)
Pmbok (2004) · Cited by 4,316
Project management : a systems approach to planning, scheduling, and controlling
Kerzner, H. (1995) · Thammasat University Digital Collections · Cited by 3,099
Project management: A systems approach to planning, scheduling and controlling
Botter, C. H. (1982) · European Journal of Operational Research · doi:10.1016/0377-2217(82)90164-3 · Cited by 2,408
Conflict Resolution Using Cognitive Analysis Approach
Al‐Tabtabai, H., Alex, A. P., & Abou-alfotouh, A. (2001) · Project Management Journal · doi:10.1177/875697280103200202 · Cited by 15
Cited by
EXPERT SYSTEMS WITH APPLICATIONS
(2005) · Expert Systems with Applications · doi:10.1016/j.eswa.2004.10.010 · Cited by 1,656
Risk Management in the Construction Industry Using Combined Fuzzy FMEA and Fuzzy AHP
Abdelgawad, M., & Fayek, A. R. (2010) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000210 · Cited by 340
Mapping wastes in complex projects for Lean Product Development
Belvedere, V., Cuttaia, F., Rossi, M., & Stringhetti, L. (2019) · International Journal of Project Management · doi:10.1016/j.ijproman.2019.01.008 · Cited by 32
Tukamuhabwa, B. R., Mutebi, H., Akandwanaho, E., Kabagambe, L., & Tumukunde, I. (2023) · Cogent Business & Management · doi:10.1080/23311975.2023.2263994 · Cited by 8
“In the same vein, Carbone and Tippett (2004) observed that failing to perform adequate risk management increases the possibility of project failure because having an effective method to plan for and manage project risks improves the management of project risks and project success.”
BackgroundWardhani, O., & Laksono, P. W. (2026) · Indonesian Journal of Education Research (IJoER) · doi:10.37251/ijoer.v7i3.2705 · Cited by 1
“In addition, failure-oriented qualitative techniques, as discussed by Carbone and Tippett (2004), support the identification of critical risk areas by emphasizing severity and potential impact rather than numerical precision [48].”
Metadata
- Authors
- Carbone, T. A., & Tippett, D. D.
- Venue
- Engineering Management Journal
- Publisher
- Informa UK Limited
- Published
- 2004-12
- Volume
- 16
- Issue
- 4
- Pages
- 28-35
- ISSN
- 1042-9247 (ISSN-L)
- 2377-0643
- OpenAlex
- W2018384073
- Cited by
- 300
- References
- 4
- FWCI
- 2.62
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Project Risk Management Using the Project Risk FMEA. https://app.cochat.ai/papers/10.1080/10429247.2004.11415263
- The paper
- Carbone, T. A., & Tippett, D. D. (2004). Project Risk Management Using the Project Risk FMEA. Engineering Management Journal. https://doi.org/10.1080/10429247.2004.11415263
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.