Cited by 94

The DOI matches its Crossref record.

Modelling uncertainty in natural resource analysis using fuzzy sets and Monte Carlo simulation: slope stability prediction

DAVIS, TREVOR J., KELLER, C. PETER·1997·International Journal of Geographical Information Science

Abstract

The techniques of fuzzy logic and Monte Carlo simulation are combined to address two incompatible types of uncertainty present in most natural resource data: thematic classification uncertainty and variance in unclassified continuously distributed data. The resultant model of uncertainty is applied to an infinite slope stability model using data from Louise Island, British Columbia. Results are summarized so as to answer forestry decision support queries. The proposed model of uncertainty in resource data analysis is found to have utility in combining different types of uncertainty, and efficiently utilizing available metadata. Integration of uncertainty data models with visualization tools is considered a necessary prerequisite to effective implementation in decision support systems.

Overview

Integrity signals

Registry

Crossref · 10.1080/136588197242239

Cites

Statistics

Recomputing p-values needs the paper’s full text.

Verification

Claims the paper makes

This paper’s full text isn’t openly available, so its claims and self-check weren’t run. The registry and citation checks still apply.

Claims other papers make about this one

Each is checked against this paper’s own text: does it say what the citing paper says it does?

  • Monte Carlo simulation has been used extensively for modelling DEM uncertainty in viewshed analysis, flooding, and slope failure prediction.

    “Monte Carlo simulation has been used extensively for the modelling of DEM uncertainty in viewshed analysis (e.g.Fisher, 1991Fisher, , 1992;;Nackaerts et al., 1999), flooding (e.g.Cooper et al., 2015;Gesch, 2018;Gesch et al., 2020;Hawker et al., 2018;Leon et al., 2014) and slope failure prediction (e.g.Davis & Keller, 1997;Holmes et al., 2000;Zhou et al., 2003).”

Citations

Cites

No references could be resolved yet.

Research works printed but not linked: 5

  1. 10.1016/0016-7061(87)90048-6 · DOI
  2. 10.3138/1005-13MG-2627-2552 · DOI
  3. Aspinall R. J., 1996, GIS, and Environmental Modelling: Progress, and Research Issues, 35
  4. 10.1111/j.1365-2389.1989.tb01290.x · DOI · Paper page
  5. 10.1080/02693799408902000 · DOI

Cited by

Sorted by citations

Metadata

Authors
DAVIS, T. J., & KELLER, C. P.
Venue
International Journal of Geographical Information Science
Published
1997-07
Volume
11
Issue
5
Pages
409-434
ISSN
  • 1365-8816
  • 1362-3087
Cited by
94
References
0
Language
en

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review