Sustainability: the elusive element of process improvement
The DOI matches its Crossref record; 14 of the 14 references it cites were found in a registry or an index.
Abstract
Purpose: This paper identifies ten “enablers” for sustaining process improvement (PI) activities. Design/methodology/approach: The enablers are derived from analysing 40 activities and identifying the significant enablers from the more successful activities. Findings: Five enablers associated with activities that fully realise the PI activity are identified and a further five enablers associated with those activities that go on to achieve continuous improvement are identified. Practical implications: The enablers are designed to assist people who conduct PI activities, cell leaders whose areas are involved in PI activities and change agents and change champions who are co‐ordinating PI programmes. The practical nature of the enablers means that they are based on processes that cell leaders, change agents and change champions can affect. Originality/value: PI activities are a crucial tool for companies undergoing a lean transformation and removing waste from their processes. PI activities have been conducted widely throughout many industries and countries, but little analytical work has been done into what sustains the improvements made by these activities.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
The machine that changed the world
(1992) · Long Range Planning · doi:10.1016/0024-6301(92)90400-v · Cited by 5,805
Toyota production system: beyond large-scale production
Ohno, T., & Rosen, C. B. (1998) · CERN Document Server (European Organization for Nuclear Research) · Cited by 4,522
A Study of the Toyota Production System From an Industrial Engineering Viewpoint
Shingo, S., & Bodek, N. (2019) · doi:10.4324/9781315136509 · Cited by 1,064
Lean production and sustainable competitive advantage
Lewis, M. A. (2000) · International Journal of Operations & Production Management · doi:10.1108/01443570010332971 · Cited by 578
Rediscovering continuous improvement
Bessant, J., Caffyn, S., Gilbert, J., Harding, R., & Webb, S. (1994) · Technovation · doi:10.1016/0166-4972(94)90067-1 · Cited by 396
Relevance Regained: From Top-down Control to Bottom-up Empowerment
Johnson, H. T. (1992) · Cited by 334
Repenning, N. P., & Sterman, J. D. (2001) · California Management Review · doi:10.2307/41166101 · Cited by 319
The Japanese Automobile Industry: Technology and Management at Nissan and Toyota
Cole, R. E., & Cusumano, M. A. (1987) · Journal of Japanese Studies · doi:10.2307/132606 · Cited by 294
Continuous improvement: the ten essential criteria
Kaye, M., & Anderson, R. (1999) · International Journal of Quality & Reliability Management · doi:10.1108/02656719910249801 · Cited by 207
(2014) · The Lean Prescription · doi:10.1201/b17564-11 · Cited by 171
Process improvement programmes: a model for assessing sustainability
Bateman, N., & David, A. W. (2002) · International Journal of Operations & Production Management · doi:10.1108/01443570210425156 · Cited by 126
Self-citationJump‐starting continuous improvement through self‐assessment
Jørgensen, F., de Boer, H. F., & Gertsen, F. (2003) · International Journal of Operations & Production Management · doi:10.1108/01443570310496661 · Cited by 118
Sustaining total quality management: what are the key issues?
Dale, B. G., Boaden, R., Wilcox, M., & McQuater, R. E. (1997) · The TQM Journal · doi:10.1108/09544789710178668 · Cited by 105
The drive for process improvement
(2000) · Manufacturing Engineer · doi:10.1049/me:20000608 · Cited by 8
Cited by
Successful lean implementation: Organizational culture and soft lean practices
Bortolotti, T., Boscari, S., & Danese, P. (2015) · International Journal of Production Economics · doi:10.1016/j.ijpe.2014.10.013 · Cited by 678
Sustainable supply chain management: framework and further research directions
Dubey, R., Gunasekaran, A., Papadopoulos, T., Childe, S. J., Shibin, K. T., & Wamba, S. F. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2016.03.117 · Cited by 609
Lean Management, Supply Chain Management and Sustainability: A Literature Review
Martínez-Jurado, P. J., & Moyano-Fuentes, J. (2014) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2013.09.042 · Cited by 582
Dynamic capabilities through continuous improvement infrastructure
Anand, G., Ward, P. T., Tatikonda, M. V., & Schilling, D. A. (2009) · Journal of Operations Management · doi:10.1016/j.jom.2009.02.002 · Cited by 531
Critical success factors for implementing lean production: the effect of contingencies
Netland, T. H. (2016) · International Journal of Production Research · doi:10.1080/00207543.2015.1096976 · Cited by 374
Metadata
- Authors
- Bateman, N.
- Venue
- International Journal of Operations & Production Management
- Publisher
- Emerald
- Published
- 2005-03-01
- Volume
- 25
- Issue
- 3
- Pages
- 261-276
- ISSN
- 0144-3577 (ISSN-L)
- OpenAlex
- W2140552600
- Cited by
- 265
- References
- 14
- FWCI
- 6.57
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.